|
Resume alert |
Resumes 81 - 90 of 204 |
West New York, NJ, 07093
... Highlights Installation, commissioning and startup of GE gas turbine (Frame 5, 7 and 9) with Mark V and Mark VI control system. Knowledge of instrumentation devices such as pressure transducers/transmitters, thermocouples, servovalves, solenoid ...
- 2017 Apr 23
Jersey City, NJ
... Sikorsky Aircraft Corporation, Horseheads, New York 8/2006 – 1/2009 Mechanical Engineer Increased safety, reliability and manufacturability with 200+ design changes to Sikorsky Aircraft’s single turbine and piston helicopters. X-2 Prototype ...
- 2017 Apr 18
Yonkers, NY
... Fuel forwarding system, upgrading of gas turbines control system, band screen replacement, Turbine inlet air cooling system (TIAC), plants expansion, upgrading, construction of new power plants, Foundation repair and corrosion control, etc. ...
- 2017 Mar 25
Queens County, NY
... Inspection of HVAC equipment and Duct work installation, Testing & Commissioning, Installation of Gas Turbine Generators, Pumps, Compressors, Bar Screens, Piping, Plumbing & Fire protection systems. Responsible for Inspection/verification of ...
- 2017 Mar 01
Woodbridge Township, NJ
... TD 3000 and Experian Watched pressure gauges, water levels, control valves, block valves, electric pumps, and turbine pumps steam Did Chemical tests on boiler water Maintained water softener/ Multimedia and carbon filters Worked close with other co ...
- 2017 Feb 22
Norwood, NJ
... of the cell cultures for breast and prostate cancer • Collected data using spectrometers and fluorimeters SPACE BALLOON, TURBINE BLADE, HELMET DESIGN Baltimore, MD Team Member Nov 2015- Dec 2015 • Performed mechanical analysis and create material ...
- 2017 Feb 12
Jersey City, NJ
... packets are being captured for www.apple.com NON –CONVENTIONAL POWER GENERATION USING HYBRID SYSTEM June 2011 - June 2012 It is a combination of vertical axis wind turbine and solar cell which is used to charge the Battery, then with the help of the ...
- 2017 Feb 04
Bayonne, NJ, 07002
... logs Communicate expectations with After Machinery Room Operated main and booster feed pumps, forced draft blowers, turbine generators, main reduction gears, and three stage evaporators Assemble and maintain atomizers Operate and maintain all ...
- 2017 Jan 18
Newark, NJ
... Executive Engineer, Nahar Group of Industries, Lehli, June 2011 – Still Working •Synchronized 12 mw turbines with 12 mw turbine or turbine with pspcl as per requirements •Maintained various turbine auxiliaries •Operated equipment including pumps, ...
- 2017 Jan 16
New York, NY
... Kuwait) * Finance and accountant for none finance professional (American university in Kuwait) Technical training: * MKV Gas Turbine Controls * MKVIe DCS Controls system ( GE training center) * MKVIe Gas Turbine Controls Niskayuna, New York,USA ( GE ...
- 2016 Dec 07