... Responsible for C&I commissioning & testing stage for Burner control system, Boiler Protection System,Turbine control & Protection system . Support in start up/shut down and operation using MHI DIASYS simulation . NETMATION MHI DCS System Test ...
- 2020 Jul 16
Coimbatore, Tamil Nadu, India
... Input ·Integration and testing of logics in Triconex through Interfaces with DCS and other third party systems like Mark VI (Turbine Control) ·Worked in Software Tool such as SPI for generating Instrument Loop drawings ·Worked for JGC (Japan Gas ...
- 2020 Jul 09
Coimbatore, Tamil Nadu, India
... PROJECT 3: Title: Heat pipe turbine for power generation Applications. Description: A new concept for power generation from solar, geothermal or other available low grade heat sources using heat pipe turbine. The basis of the heat pipe turbine is ...
- 2020 Jun 08
Coimbatore, Tamil Nadu, India
... Areas of Exposure Hydro power plant Tenmalai 1days • Generator operation • Penstock operation • Energy generation • Turbine process ELECTIVES: • Manufacturing of machines • Thermal engineering SKILLS • Problem solving • Creativity • Flexbility ...
- 2020 May 20
Coimbatore, Tamil Nadu, India
... 8) Supporting to GE to Start-Up and Commissioning (LCI) of Gas turbine Generator and make synchronizing with grid. 9) Closed loop checking (Functional Test) with DCS, PLC, SCADA and SAS. 10) Stability Test is conducted with our team for Generator, ...
- 2020 Apr 04
Coimbatore, Tamil Nadu, India
... " Opration and maintenance of 3.3kv/400KW vertical turbine pump " Troble shooting in DOL,STAR DELTA STARTERS and ELECTRICAL MOTORS. " Operation and Maintenance of Batteries. " Performed the Operation and Maintenance of Control room and Panel boards. ...
- 2020 Mar 16
Coimbatore, Tamil Nadu, India
... Plant, Portable water plant and ETP ● Carried COMMISSIONING Activity EDTA Cleaning, AST Steam blow out, Main steam blow out, COD Trail runs, equipment trail runs, oil line flushing and water circuit flushing in 600 MW boiler and turbine. ...
- 2020 Jan 24
Coimbatore, Tamil Nadu, India
... 26.12.2016 To 31.12.2016 PWR(reactor), fuel(U235)Inventory, turbine, water source, water chamber, scale determination, pumps, power grid, circuit area, generator(emergency), testing, chiller, digital monitoring PLANT VISIT FOR PLANT system. ...
- 2019 Dec 01
Tirupur, Tamil Nadu, India
... PROJECT TITLE: Optimization of wind turbine power enhancement using aerodynamic brake. OBJECTIVE : Using technical software’s Pro-E,CATIA designed a blade with slope that rotates continuously for producing constant power without defects. PERSONAL ...
- 2019 Nov 27
Coimbatore, Tamil Nadu, India
... - Holdsresponsibleforthecompany DGCAMODULES IN CATB1.1AEROPLANES TURBINE: MODULE3(ELECTRICALFUNDAMENTALS) MODULE4(ELECTRONICFUNDAMENTALS) MODULE5(DIGITALTECHNIQUES) MODULE6(MATERIALSANDHARDWARE) M0DULE8(BASICAERODYNAMICS) MODULE9(HUMAN FACTOR) ...