RAKESH.KM
QUALITY SUPERVISOR
Being a logical thinker personality development I hold the ability to
analyse the difficult problems in unconventional, complex and creative ways to identify the patterns & create solid solutions with logical reasoning .Driven by ethical principles I have strong self- motivation & confidence which shaped me to the initiator, strong team player & loyal leader
aday1l@r.postjobfree.com
Coimbatore,India
WORK E XPERIENCE
TATA MOTORS LTD-“1YRS 7 MONTHS” (Till date)
Working at “TATA MOTORS LTD.”, Coimbatore,
which is pioneer in various divisions like manufacture of Engine Prolife for Commercial and Passenger
Vehicles.(euro 1, euro 2,euro 3 and bs4-ACE magic)
My responsibility in the company as Quality Engineer in Prolife Projects’ for Manufacture of CVBU & PVBU vehicles (Commercial Vehicle Business Unit and
Passenger Vehicle Business Unit)
BUYERS ENGINEERS PVT.LTD -“6 MONTHS”
Working as a shift supervisor in buyers engineer,
manufacturing as a rubber and rubber to metal bonded components.
EDUC ATION
BE (Mechanical Engineering)in Nehru Institute of Engineering and Technology, Coimbatore with
70% (First Class) - 2017.
Higher Secondary in Sahayamatha Matriculation and Higher secondary school, karaikudi with 78% (First Class) - 2013
SSLC in Sahayamatha Matriculation and Higher secondary school, karaikudi with 68% (First Class) In 2011
ACHIEVEMENT:
Received “ Quick Learner “ awards during the
year 2018 from Prolife Head
Received “ Best Corrective and Preventive Action for PDI, ENGINE TESTING“ awards during the
year 2019 from Prolife Head
Achievement Of Making 5S in Testing Area“
awards during the year 2019 from Prolife Head
Rakeshking0088
Rakeshmothi0088
SKILLS
SOLIDWORKS
CAD
PRO-E
ENGINE TESTING PERFORMANCE AND EFFICIENCY
ENGINE FAILURE ANALYSE
ENGINE ASSEMBLER REPORT
MAKING
GAUGE HANDLING
OEE ANALYSE
AUDITING
KAIZEN
POKO YOKE
SIX-SIGMA
MAKING ICA AND PCA
SHOP FLOOR KNOWLEDGE
PERSONAL PROJECTS
1.Title (UG): Design And Fabrication Of Fuel Cell Powered Vehicle(2017)
Main Project work: Fuel Cell Is The Technology Are The Good Source For Automotive sector Instead Of Gasoline System, The Main Advantage Is Zero Emission And It Is Reversible Process. Hydrogenv(FC) Have More Advantage Then Other Fuel Cell. But We Choose Alkaline(FC) instead of hydrogen because of more consequence. So it is the base we get knowledge In Fuel Cell So We Did Alkaline(FC) For Two Wheeler Vehicle And Run At The Speed Of (40-50)Km/hr.
2. INPLANT CFT project (2018):
Engine oil leakage: Leakage may from Oil/gas
pipelines, engine oil or fuel leakage to avoid explosions and environmental hazards and safety leak proof system is most important. To compensate false alarms when there is no leak in the pipeline, to reduce the response time and Increase the accuracy of leakage location... 3. INPLANT CFT project (2019):
Engine Overheating: Loss of coolant because of a leak is probably the most common cause of automotive
engine overheating.
Tata Motors Ltd
Quality Control handling
Understanding the customer’s specific requirement and based on their requirement preparing standards through documented procedures and assessment
engine buy off gate control handling and defects analyzing and solving in 4m methods and DMAIC handling methods
Sap complaints tracking and sort out the issue in fields
Achieving target - less than 5000km failure in field as zero failures
Engine Failure capturing knowledge in Engine sound,Engine smoke, warranty engines compliant
Focusing on top issue complaints in field to improve our customer satisfaction by Making projects in the Plant.
Hands on experience in ACE engine assembly
Tested not ok engines analysis and find root cause, Taking corrective action and preventive action (CAPA).
Critical Process Audit (CPA) and Layered Audit (LPA), safety audit and 5S audit.
Calibration updating in Tata motors calibration portal.
Pre delivery inspection (PDI) and small parts inspection.
Reducing the methods using 7QC
Carry out analysis on quality issue for Warranty and Tested Not ok engines 4M condition, finding root cause by analysis and taking preventive and corrective action.
Carry out daily meeting of customer Complaints through 5F board, analyze the root cause and take preventive and corrective countermeasure by doing Problem Solving report.
Daily Review of Pillar boards and tracking the status of Safety, Quality, Delivery, Cost and Morale through this boards towards achieving organization goals.
Basic knowledge and handling in ISO 90001:2015
Additional Responsibility of handling Production in Engine testing and Engine Assembly COMMERCIAL EXECUTIVE MIS & SAP HANDLING (MAY’18-NOV’19)
Support in SAP PP (Production planning, Production Order Processing) DM (Demand Management)
Production planning module in SAP for the Engine Reconditioning process
Optimistic, being proactive, implement to learn faster, team player and able to work in challenging environment for deadlines. Prepration of daily MIS, Material shortage,cores & FG stocks reports are updated
Primary Responsible to take care Store Operations, SAP Production & dispatch support.
Resolving Inventory Management Related issues which generate during the different kind of material movement activities, I.e wrong inventory valuation improper master data maintenance and etc.
Resolving day to day issues in SAP MM procurement which origante from the processes such as procurement of raw materials, stores and spares, Stock transfer also.
Successful support of SAP process change and major data conversion efforts.
Analysis of rejected core parts and Entering the data of the parts in SAP. Industrial Training
Company Durations Area Of Exposure
Tamilnadu State Transport
Corporation(kumbakonam)
Limited Karaikudi.
09.12.2015 To 18.12.2015 Engine assembly and
dismantling, power transmission,
clutch work, fuel pump, nozzle
testing, Bearings, turbocharger,
leaf spring, tyre(RC), differential
part, lathe work, drilling, welding,
body chassis.
Steel Authority Of India
Limited Salem.
12.09.2016 To 16.09.2016 Inventory, Hot rolling Mill, cold rolling Mill, SMS,Method
of treatment, surface finishing,
testing, coining, Boiler(FBC).
Kudankulam Nuclear Power
Plant Tuticorin.
26.12.2016 To 31.12.2016 PWR(reactor),
fuel(U235)Inventory, turbine,
water source, water
chamber, scale determination,
pumps, power grid, circuit area,
generator(emergency), testing,
chiller, digital monitoring
PLANT VISIT FOR PLANT system.
IMPLIMENTAION TRAINING
PROGRAMME
JAMSHEDPUR-TATA
MOTORS(OE) PLANT,
CUMMINS PLANT (OE) AND
LUCKNOW RECON PLANT
10.11.18 to 22.11.18 Bs-4 engine training, and six- sigma for problem solving
technique
Personal details
Date of birth : 15-08-1995
Place of birth : pudukottai, India
Language s known : English,Tamil
Residential address : 348A, Kamarajar road, lions stop masakilipalayam coimbatore-641015 Permanent address : 3/1307,D.52 new housing board kalanivasal kamaban nagar karaikudi-6300032 Declaration
I do here by declare that the above details furnished by me are true and correct to the best of my knowledge. If am selected, I will do my work sincerely.
Reference
Mr.suresh kumar [CVBU, customer care] Email – aday1l@r.postjobfree.com Senior manager, tata motors prolife Contact number-995-***-****, 888-***-**** Coimbatore-641015
Place: Coimbatore Yours sincerely,
Date: Rakesh.KM