Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Coimbatore, Tamil Nadu, India
Salary:
3500 USD
Posted:
April 04, 2020

Contact this candidate

Resume:

RESUME

MURUGESAN.M

O.No */*A, N.No */**, Nadu Street,

Perali (BPost), Kunnam (Taluk),

Perambalur (Dist), S India, E-mail-ID: adcmuf@r.postjobfree.com Tamil Nadu. Pin: 621 708 Mobile : +918*********

Electrical Engineer with 12+ years of experience working with blue chip companies in electrical industry. Excellent interpersonal and communication abilities, possess a wide range technical skills, enjoys being part of a team, as well as managing, motivation and training a productive team, thrives in high pressure and challenging working environments. EDUCATIONAL PROFILE:

CLASS / COURSE INSTITUTION

BOARD OF

STUDY

YEAR OF

PASSING

% OF

MARKS

B.E.,

(Electrical &

Electronics

Engineering)

Annamalai

university

Annamalai Nagar.

Annamalai

University

2003 - 2007

79.80

Higher Secondary

Education

Little flower Higher

Secondary School,

Annamangalam

State Board 2001 - 2003

80.25

S.S.L.C

(X Std.)

Govt. Higher

SecondarySchool,

Perali village.

State Board 2000 - 2001

86.00

WORK EXPERIENCE:

(I) INCO GROUP OMAN: Due to Project delay, visa process is on hold. That is why I look forward new job challenges in my career.

(II) Saudi Services for Electromechanical Co Ltd(Al Rashid Group):

Designation : Testing and Commissioning Coordinator

Period : FROM 08.04.2014 TO 22.06.2019

Department : TEAM OF THE TESTING AND COMMISSIONING

Location : Kingdom of Saudi Arabia. Riyadh.

Handled Project:(Based on the Oil and Gas Project) Duba Green- Integrated Solar Combined Cycle Power Plant (ISCCPP): 605 MW. Green Duba, planned to be built near Tabuk on the Red Sea coast, will be Saudi Arabia’s first fossil- fuel fired power plant to incorporate solar energy production to boost efficiency - known as an integrated solar combined cycle (ISCC) plant and which will produce 43 MW of solar energy. ISCC plants reduce emissions of climate-warming carbon by increasing the amount of steam available for driving power generation turbines, without having to burn more gas or oil. Scope of Work:

1) Pre-Commissioning and Commissioning Testing of all electrical Equipment. 2) Commissioning activities and energization of extra high voltage switchgear, Medium voltage switchgear and Low voltage Switchgear.

3) Commissioning activities and energization of Power Transformer, distribution transformer and Lighting Transformer.

4) Commissioning Activities and Energization of Low voltage Variable Frequency Driver (VFD). Operation & Maintenance of Medium Voltage Variable speed driver (VSD)

5) Execute the Interlocks between the Substation and Power plants. 6) Testing and Commissioning of LT and HT motors Coupling and decoupling. 7) Operation and maintenance activities of Low voltage Switchgear, Medium Voltage Switchgear LT Motors and HT Motors.

8) Supporting to GE to Start-Up and Commissioning (LCI) of Gas turbine Generator and make synchronizing with grid.

9) Closed loop checking (Functional Test) with DCS, PLC, SCADA and SAS. 10) Stability Test is conducted with our team for Generator, Transformer, Busbar and Motor. Troubleshooting of all electrical control and protection circuits 11) Good knowledge of safety rules and regulation (Electrical First aid, HSE induction, LOTO Procedure, Safe work procedure, job safe practice and risk assessment) Handled Projects

132/13.8kV Substation Al Dabbat, Riyadh.

Saudi Electricity Company, SS #8177, KSA, RIYADH.

380/13.8kV Pumpstation#3

Saudi Electricity Company, KSA, RIYADH

380/132/13.8kV Substation, Power Plant # 9, Riyadh. Saudi Electricity Company, SS #8159 & 9019, KSA, RIYADH.

380/13.8kV Substation, Power Plant #8, Riyadh.

Saudi Electricity Company, SS #9021, KSA, RIYADH.

132/13.8kV Substation, Power Plant #4, Riyadh.

Saudi Electricity Company, SS #8006, KSA, RIYADH.

380/132/13.8kV Substation, Sultana, Riyadh.

Saudi Electricity Company, SS #9026, KSA, RIYADH.

380/132/33/13.8kV Substation, Kharj Industrial City (KIC), Al kharj. Saudi Electricity Company, SS #9067,KSA,RIYADH.

380/132/13.8kV Substation, AZIZIYAH, Ar Riyadh.

Saudi Electricity Company, SS #9044,KSA,RIYADH.

132/33kV Substation, RUMAH, Ar Riyadh.

Saudi Electricity Company, SS #8505,KSA,RIYADH.

132/13.8kV Substation, Al_Mather, Ar Riyadh.

Saudi Electricity Company, SS #8233,KSA,RIYADH.

132/13.8kV Substation, Ar Riyadh.

Saudi Electricity Company, SS #8048, KSA,RIYADH.

132/13.8kV Substation, Ar Riyadh.

Saudi Electricity Company, SS #8034, KSA,RIYADH.

Scope of Works: Testing and Commissioning of Gas Insulated Switchgear, Air insulated Switchgear, Power Transformer, Capacitor Bank and Shunt Reactor. Modification of LCC Panel, Bus bar Protection Panel, Circuit Breaker Failure Protection Panel, Common Alarm Panel, MIMIC Panel, Synch checks Panel, AMR Panel, Revenue Meter Panel, SER Panel, and ACSE. Co-ordination with client in As Built Scheme drawing submission, Test report submission, As build cable schedule submission and all site activity to satisfy the customer. Relay Testing:

Auxiliary Relays- ABB, Alstom, Easun Reyrolle, Siemens and etc. Simple Relays – REF615, P142, P211, REB650, REQ 650, TAPCON 260, SPAJ 141C, 7SJ602 and ZIV etc.

Main Relays - Communicating and Configuration only (Testing is in Intermediate condition).

(ABB- REC 670, REL 670, RET 670, RED 670, Micom643, Micom546 and SEL 451, 7SA522, 7UT612, 7SD522 SEL 387E, SEL487V, GE L90, and GE C70.) Used Relays Software:

ABB - PCM 600 Versions 2.3 & 2.6, Alstom- Micom S1 Studio & Agile, SEL(AcSELerator Quick set), GE(Enervista UR Setup) and Siemens (Digsi4.88 & 4.90), ZiV- ZiverCom plus & Zivercom CID, Scheneider Electric(Easergy Studio).

Capability: GIS –Up to 380kV, AIS- Up to 765kV, Switchgear - Up to 33kV.

(II) Abdulla-Fouad Contracting Company Ltd:

Designation : SENIOR TESTING AND COMMISSIONING ENGINEER

Period : FROM 10.10.2012 TO 09.12.2013

Department : TEAM OF THE TESTING AND COMMISSIONING

Location : Kingdom of Saudi Arabia.

Handled Projects

Natural Engineered waste water Treatment (NEWT) system, MA’ADEN. At Ras-Alkhair Under Seven Construction Company (7CC).

Western Region Power Plant Extension(unit # 4, 5 &6), SEC. At alwajh live Substation (13.8 kV / 132 kV) through ABB.

Scope of Works: (Existing feeder - Line feeder Convert to Generating Transformer Feeder & Extension Feeder).

Existing Panel: Generator Over-All stability, Transformer Stability & Busbar Stability, Modification of LCC Panel, Modification of Bus bar Protection Panel, Modification of Breaker failure Protection Panel, Modification of Interposing relay Panel, Modification of Transducer Panel, Modification of Common Alarm Panel, Modification of MIMIC Panel, Modification of Synch check Panel, Modification of AMR Panel, Modification of SER Panel, Co-ordination with client in As Built Scheme drawing submission, Test report submission, As build cable schedule submission and all site activity to satisfy the customer.

Extension Panel: Equipment Testing, Scheme checks, Modification of Closing Interlock and Intetripping, GIS (Up to 380 kVsystems), Transformer, PCC, MCC, Switchgear (up to 33kV) and all other Electrical Equipments.

Testing:

100MVA Transformer Testing and Stability, Generator Overall stability Test, Cable differential Test, Bus bar Stability test, Transducer, Auxiliary relay, Simple Relay, Main relay Testing, Circuit Breaker Failure Trip Test, GIS HV Test Coordiantion, Current Transformer Testing, Voltage transformer Testing, Inter posing Current Transformer Testing and Cable HV Test. III) Voltech Group (Domestic & Gulf Experience)

A.Domestic Experience:

(i) VOLTECH ENGINEERS PRIVATE LIMITED:

Designation : SENIOR TESTING AND COMMISSIONING ENGINEER

Period : FROM 10.08.2007 TO 28.08.2012

Department : TEAM OF THE TESTING AND COMMISSIONING

Location : Chennai.

Handled Projects:

400KV/220KV Substation of Power Grid Corporation of India Limited(WRLDC) in Raipur (CG).

400KV/220KV Power Grid Corporation of India Limited (KARUR).

220KV/11KV Mejia Thermal Power Station (DVC) at Durlovpur in West Bengal.

2 70MW (220kV/11kV) BMM Captive Power Plant in Karnataka.

3*030MW 33KV/6.6kV (GT) Captive Power Plant, Vedanta Aluminum Ltd Lanjigarh.

2*300MW 400kV/20kV (GT) Thermal Power Station, Lanco Infratech Ltd.

1*010MW 066kV/11kV (GT) Captive Power Plant, Sunvik Steels Private Ltd.

132/11kV Hindustan National Glass Industries Ltd, Naidupeta(AP).

132/11kV Rajeev Bhima Lift Irrigation Scheme, Makthal(AP).

33KV/6.6KV/3.3KV Switchyard and Switchgear Testing and Commissioning (NMDC Ltd). Work Description:

All types of Electrical Equipments Testing & Commissioning

(Switch yard & SwitchgearEquipments: CT, CVT, LA, Circuit breakers, Surge Arresters, Earthing Transformer,Neutral Grounding resistance, Automatic Power factor Controls, Surge Monitors, Isolators, Power Cables(LT&HT), LT Motors, 11kV Switchgear, 6.6kV Switchgear, ICOG Panel, LT Panel, HT Motors (up to 900KW), Battery Charger (up to 110V DC) system, UPS System, Transformers (75MVA), Generator(87.5MVA) and etc.

Scheme Checking, Circuit Modification, Trouble shooting of all Electrical Circuits.

Knowledge of Transformer protection, BusBarprotection, Motor protection, and synchronizing scheme.Trouble shooting of all Electrical circuits, Co-ordination with client in As Built Scheme drawing submission, test report submission, As build cable schedule submission and all site activity to satisfy the customer.

Work Description: (Testing & Commissioning of given below panels.)

LT Panel - Horizone Microtech Power Private Ltd, L&T Panel & ABB Panel.

HT Panel (6.6 kV) - C&S Ltd

HT Panel (11 & 33 kV) - Areva T&D Ltd, ABB Ltd, Siemens LTd & Alfanar.

Control & Relay Panel - Areva T&D Ltd

Relays - MicomP111, P141, P211, C264 & Auxiliary Relays,

Motor - Up to 12 MW.11kV, 6.6kV & 3.3kV HT Motor in ABB make & 415V Motor in ABB make.

RTCC - QRE Ltd.

Stability Test -Transformer Stability test, Transformer Restricted Earth Fault test, Earthing Transformer Stability, Generator Stability, Busbar Stability test, Reactor Stability test and Motor Stability test. B) International (GULF) Experience):

Name of the Location : QATAR

Customer : QATAR GENERAL ELECTRICITY & WATER CORPORATION- KAHRAMAA Client : Siemens

Contractor’s Name : Voltech Engineers Private Ltd. Substation : 66/11 kV KHALIFATGAS INSULATED SUBSTATION Project Name : QATAR POWER TRANSMISSION SYSTEM EXPANSION-PHASE IX Duration : 19.10.2011 to 10.07.2012

Designation : Senior Commissioning Engineer

Department : Team of the Testing and Commissioning Works Description:

All types of Electrical Equipments Testing & Commissioning, 11kV Switchgear, 11kV Relay Panel, 11kV Bus Bar Protection Panel, Common alarm Panel, 66kV LCC, 66kV Relay Panel, 66kV Bus bar Protection Panel, Synchronizing Scheme Checks. CT, VT, Circuit breaker, ICT, Meters Calibration, High voltage test, Contact Resistance test, etc.

67 MVA Transformer Testing and Stability, Oil bath testing, Cable differential Test, Bus bar Stability test, Transducer, Auxiliary relay, Simple Relay, Circuit Breaker Failure Trip Test, GIS

HV Test Coordiantion, Current Transformer Testing, Voltage transformer Testing, Inter posing Current Transformer Testing, Cable HV Test, Busbar HV Test, GIS HV Test Coordiantion, Busbar and Earth Switch Contact Resistance Test.

Involved in Engineering Drawings finalization with Customer which includes GA Drawings for electrical equipment, Cable tray drawings, Earthing drawings, illumination drawings, lightning drawings and erection key drawings for switchyard

All of the electrical equipment testing, Energy Management,

Scheme Checks, Power & Control Cable Schedule Preparing, Control cable Termination Schedule and Ferrules Preparing for various control methodology according to site conditions.

Transformer Break down voltage Checking, Trouble shooting of all the Electrical Circuits, Circuit Modification.

Work description: (Testing & Commissioning of given below panels.)

LT Panel - Siemens Switchgears Ltd.

11kV Protection Panel - Siemens SIPROTEC Ltd.

66kV Protection Panel - Siemens Siprotec Ltd.

11kV Bus bar Protection - Siemens Siprotec Ltd.

66kV Bus Bar Protection - Siemens Siprotec Ltd.

Stability Test -Transformer Stability test, 11kV &66kV Bus bar Stability test, Restricted Earth Fault test.

Used Tesing Tools:

CPC 100, Freja 300, CT Analyzer kit, CB Analyzer kit, CB Timer kit, Sverker 780, CPC TD, CMC 256, ODEN KIT, Timer kit, Power Quality Meter, Insulation Resistance Tester kit and MeggerB10 E, MOM 600. ADDITIONAL QUALIFICATION:

Computer Proficiency:

Operating System : Windows 98, 2000, 2010 and windows XP

M.S. Office Tools : M.S. Word, PowerPoint, Excel. Master Diploma in Electrical Cadd:

AutoCAD, Microsoft Project, Primavera, Project Planning Management & PC Schematic. (In Mylapore cadd centre. Chennai-600 004) PERSONAL STRENGTHS:

Confidence

Hard working

Ability to work as team

Respect for people

Excellent Planning, organizing and coordination

PERSONAL PROFILE:

Father’s Name : Mr.MANICKAM THANGAVEL.

Date of Birth : 16th May 1985.

Nationality : Indian

Marital Status : Married

Hobbies : Listening Music, Playing games and, Reading books. Languages Known : English, Hindi and Tamil.

Driving License : India & Saudi Arabia.

PASSPORT DETAILS:

Number : S0695348

Place of Issue : Riyadh, KSA.

Date of Expiry : December 20, 2027

DECLARATION:

I consider myself familiar with Electrical Technology Aspects. I am also confident of my ability to work in a team. I hereby declare that the information furnished above is true to the best of my knowledge.

PLACE : TAMIL NADU yours truly,

DATE : 13.03.2020



Contact this candidate