|
Resume alert |
Resumes 21 - 30 of 172 |
Windsor, ON, Canada
... Operation and maintenance of 100MW power plant turbine division. In 4 months time, complete Competency examination for Power plant engineer certificate to operate boiler, thus promoted as Plant manager for Boiler operations. PERSONAL DETAILS Date of ...
- 2019 Aug 30
Saline, MI
... Lafarge Corporation March 1987 to December 1998 Powerhouse & Turbine Maintenance Manager Managed all the production & maintenance activities of a large power generation facility. Led the implementation of TPM (Total Productive Maintenance), 5S and ...
- 2019 Jul 31
Ypsilanti, MI
... International Turbine Industries June 2014-November 2016 Ypsilanti, MI I work as a Stock Room Clerk. My responsibilities include properly executing all duties assigned to me, which include sales and purchasing. I perform the incoming review to ...
- 2019 Jun 04
Detroit, MI
... Feasibility study, Design and installation of 5KW wind turbine for Nepal Telecommunications. 6. Designed and involved in implementation of 3-phase electrical system in Nepal Polytechnique Veterinary Hospital.
- 2019 Mar 16
Farmington, MI, 48336
... Williams International, Walled Lake, MI Designer and manufacturer of small gas turbine engines for military and commercial applications. Quality Assurance Engineer Researched, implemented and reported on quality requirements for multiple military ...
- 2019 Feb 06
New Boston, MI
... Calibrated magnetic and turbine flowmeters and developed calibration procedure for continued use. Prepared graphical analysis of cylinder head, intake manifold, and air intake system benchmark data. Toyota Technical Center May - Aug 2013 Co-op, ...
- 2018 Dec 05
Canton, MI
OBJECTIVE Motivated and passionate Mechanical Engineer with four years of experience in combustion engines design and analysis, delivered improved engine design through achieving efficiency gain of 2.5% for Siemens turbine. A hard- working team ...
- 2018 Oct 01
Southfield, MI
... ‘09 “Life Time Assessment of Power Plant components” • Involved in quality for assessing the power plant components like turbine blades, rotators, shafts through Non- Destructive(ND) & Destructive method (Mechanical testing: Hardness, Tensile, ...
- 2018 Aug 08
Novi, MI
... • Design optimisation of Wind turbine blades using. Graduate: Finite Element Methods: • Performed Stress Analysis for the Bracket to optimize the design and reduced the stress by ten percent using Hypemesh. Manufacturing Process Techniques: • Design ...
- 2018 Jul 11
Detroit, MI
... Performed the non-premix and premix flow using Fluent in Gas turbine to stimulate afterburner. Optimize the intake system of a PFI system using GT-Power. Worked and familiarized with the data acquisition in an IC engine using LABVIEW. Developed code ...
- 2018 May 29