Post Job Free
Sign in

Engineer Design

Location:
Al Dafna, Qatar
Salary:
20000
Posted:
August 20, 2020

Contact this candidate

Resume:

Result oriented Civil & structural professional working in the oil & Gas Refineries and Petrochemical plants. Experience in preparation & review of design Documents / Drawings. I am a hardworking and dedicated team player who continuously strives for achieving personal and organizations goals by focusing on problem solving to the customer satisfaction. Converge with different stages of project from concept development, planning stage, feasibility study, detail engineering, field engineering, construction support including procurement support, commissioning & maintenance activities. Handling deadlines, budget and leading the team towards the goal. Always willing to accept challenges where I can utilize my skills & experiences to achieve desired results.

SECTORS OF EXPERTISE

Oil & Gas

Petroleum Refining; Pipelines and Field Facilities; Petrochemicals; Utilities and Offsite

Power

Thermal Power plant including STG building

Infrastructure & Buildings

Administration Buildings, Site Offices & Facilities, Accommodation precinct, camps & school buildings

Industrial

Automobile manufacturing industry

EDUCATION

2006

ME structural Engineering (First class with distinction), Annamalai university, Chidambaram, Tamil Nadu, India

2004

BE civil engineering (First class with distinction), Madurai Kamaraj university, Madurai, Tamil Nadu, India

PROFESSIONAL DEVELOPMENT

MME Registered Grade A engineer, Qatar. Registration No: 8002

EXPERIENCE

SINCE 2011

KENTZ ENGINEERING LTD (MEMBER OF THE SNC-LAVALIN), DOHA, QATAR

Oil & Gas

Senior Civil and Structural Engineer

Project: ORYX GTL (Under Deputation)

Working with ORYX GTL Engineering & project services team as a client representative.

Responsible for providing effective engineering solutions for brown field projects by considering existing facilities, construction constraints and operation in considerations.

Responsible to coordinate with various internal stakeholders and other contractors and resolve relevant technical issues, punch lists during commissioning stages.

Supporting construction team with procurement queries, fabrication queries, construction queries and site modifications arising due to construction activities.

Monitoring site activities and ensuring all activities are being carried out as per design drawings, specifications and HSSE requirements.

Identify the potential hazards during site walk through and raises punch list as a support to the maintenance and operation team.

Coordinating with construction team and contractors for safely execution of project.

Develop the in-house FEED engineering.

Project: ORYX GTL – MQAE627 - Call off contract. Client – ORYX GTL

Senior Civil and Structural Engineer

As Built of passive Fireproofing in ORYX GTL Facilities in Ras Laffan

Site survey was conducted in entire ORYX GTL plant to identify as built condition of the fire proofing on structure / equipment support (saddles, skirts, lugs, legs) and provided the fire proofing requirement for each structure & equipment based on the guidelines of “Passive fire proofing requirement for the refinery” API 2218.

DED for ATR Platform Modifications (MOC -1445)

Design & detailing of existing ATR platform was performed to reduce number of beam & connection to optimize the duration of removal of beams for the burner maintenance.

DED of U-45 Wax Drain Collection and Recycling (MOC-1057)

Manual wax draining system shall be modified to automatic drain system in wax filter and nitrogen line was provided to wax unit.

FEED & DED for new shell and tube exchangers to replace the existing 160-ES-003 & 160-ES-004 (MOC-1639)

Adequacy of existing pipe rack structure is performed to replace the new exchanger and new foundation design is carried out to place the new exchanger on ground.

FEED for perimeter fence protection (Security & surveillance) MOC-134

In line with MOI (Ministry of interior) law 9 regulations, perimeter fence protection (security & surveillance) was developed and existing guard house building is extended to accommodate the server room, CCTV control room, battery room & UPS room. Adequacy of the existing building is performed for the proposed modification.

Assessment of existing Main control building, Admin building, Remote interface building and guard house buildings for the blast over pressure.

Assessment of existing main control building, admin building, Remote interface building and guard house building for the blast over pressure as latest QRA study and strengthening methods are proposed in line with vendor recommendation.

DED for New Admin Building and access Road (MOC1168 & 1093).

Design and detailing of pre-engineered admin building with access roads. Reviewed the design calculation for structure prepared by Specialized vendor. Foundation design for the admin building, other structures near to the admin buildings and general civil works are developed as a part of the civil & structural scope.

Replacement existing fire water pipeline (MOC-1269)

FEED and DED was performed to replace the entire fire water pipe network from the ORYX GTL plant as the existing pipe material (GRP) is weak at bends and joints and required the frequent maintenance. It is a challenge to replace the existing pipe in the running plant and finally achieved with lot of effort.

Developing the fire water network including UG scanning for the secondary area (MOC-1911)

A fire water network is developed for the secondary area of the ORYX GTL plant. Underground utility layout, road & utility crossing details and protection to the fire water pipe are developed as part this work order.

Developing the Storm water drainage network for the secondary area (MOC-2079)

A storm water drainage (French drain) is developed for the secondary area of the ORYX GTL plant for the rainfall intensity provided in Qatar highway design manual and Qatar Storm water drainage design manual.

By pass line for the cooling water line in unit-20 & 50 (MOC-2028)

Bypass line was provided for the cooling water pipe line by providing additional valve pit and above ground pipe supports.

PSV sparing project. (MOC-1777)

An existing structure are used to support the PSV at unit-10 & 40 and adequacy of the structure was checked. New access platforms are provided and pipe supports are considered as per the new pipe routing provided by piping.

Transformer shed for the storage (MOC-2032)

A transformer shed (33mx8m) is designed and detailed with removable roof for the storage of transformer.

Responsible for all civil & structural deliverables.

Site survey conducted for all work orders to observe the site condition based on the scope of respective packages.

Discipline Input to Engineering schedule and Progress reports

Estimation, proposal and bidding support

Project: FEED for Mitigation of Soil Erosion at FMPS and NFIS with in Dukhan- Client: Qatar Petroleum

Storm water is flowing from higher to lower elevation and soil gets eroded and the rainwater is entering to the plant facilities also. As a mitigation work, the storm water flow speed is controlled by using the retaining bund walls and retention ponds. The flow is diverted by providing interceptors, slope protection, protection wall at various locations as part of the mitigation work.

Responsible for civil & structural deliverables.

Site survey is performed along with Topographical surveyor and get the information’s. Permeability factor is calculated by testing the soil.

Project: Proposal works Client Qatar Petroleum, ORYX GTL & DQUM Refinery:

FEED for Domestic Supply of LPG from NGL Complex TO WOQOD. Client QP

FEED for Mitigation of Hydrocarbon Emissions from QP Refinery Storage Tanks, Mesaieed, Client QP

Flare Minimization project in ORYX GTL plant in Ras Laffan Industrial City – Client – ORYX GTL

Offsite facilities for DQUM refinery, Oman. Client - DQUM Refinery & Petrochemical industries Co.

Responsible for all civil & structural deliverable

Site visit for scope clarification attended with client.

Estimated the quantity of materials required for the project after completing the basic design of all structures, foundation and general civil works.

Coordinated with vendors for the cost of vendor services and material.

Project: QG- Waste water recycle and reduction project for QG2, QG3 & QG4. EPICC Client: Qatar Gas

Responsible for design and detail of substation building.

Review the calculations and drawings which was prepared by subcontractor.

Worked as a field engineer at site

Responsible to review MAR, MR, BOQ, shop drawings, bar bending schedule and method statement.

Manage the subcontractors for the construction of substation building and MBR tanks.

Adequacy check for existing structures

Participated in the design review meetings / Progress review meeting with subcontractor.

Extended support to the site by attending site queries, technical queries by providing rehabilitation solutions, rectified all damages due to constructed work.

Project: Shell GTL & EPCM Ras laffan industrial city. Client - Shell GTL

Responsible for preparation of design calculations and review the detail drawings.

Executing brown field jobs for SHELL Pearl GTL plant for different stages such as Select and define, Pre-FEED, FEED & Detail Engineering to the maximum client satisfaction.

Worked as an active team player on shell GES Projects for upgrading existing facilities for shell GTL plant at Ras laffan City, Qatar.

Provided support to the construction team to execute the work.

Provided input to planning dept. for the schedule preparation.

Design and detailing of RCC framed HSSE multifunction complex for the shell.

Concept Study was prepared for the Permanent Asset facility

LPU Platform and Stair Access is designed and detailed for the Train 1 & 2 (Select and Define Phase)

Layout is developed and designed the Permanent Bundle Cleaning Yard - Select phase.

Adequacy check was performed for the existing structure when it’s modified for the additional requirement.

Highlight the cost and schedule impact to the project team.

Project: ORYX GTL – General Engineering Services. Client - ORYX GTL

Responsible for preparation of design calculations and review the detail drawings.

Executing brown field jobs for ORYXGTL plant for different stages such as Select and define to the maximum client satisfaction. Provided support to the construction team to execute the work. Coordinating with client for project requirements and deliverables approvals. Adequacy check was performed for the existing structure when it’s modified for the additional requirement. Highlight the cost and schedule impact to the project team.

Executed brown field jobs for ORYX GTL plant for different stages such as Pre-FEED, FEED & Detail Engineering to the client satisfaction.

A detail Engineering design was developed to provide the permanent power supply to the site establishments and warehouse. As a part of the DED, a package substation building is designed and with electrical cable trench etc.,

Permanent Lines for U30 Catalyst Transfers in Between Reactors/ Hoppers/Melting Drum (MOC-628)

Three-way valve is included in the existing pipeline and monorail is designed for the 2.5 & 15 Ton capacity. Adequacy of the existing reactor structure is checked for the load due to pipe supports & valve.

Temporary admin building in Raslaffan MOC (1156) and paving road from gate 3 to Project warehouse and contractors site facilities MOC (1093)

Architectural layout was developed by using STUP consultant and preliminary Design is developed for the admin building. Identify the type of streel structure either pre-engineered or conventional steel structure. The secondary area layout is developed for the admin building with road, parking, landscaping etc. Quantity of the material requirement is estimated and cost of the project was calculated for the tender.

Detail Engineering Design (DED) for interconnecting line between East and West WWTP (11.5kM) & ORYX GTL to East WWTP (7.5km) in RLIC to comply with MOE's recommendation of zero TIW discharged to sea for MOC -1195 – 18KM

Underground pipeline is routed from East WWTP to west WWTP & ORYX GTL to East WWTP in Raslaffan. Topographical & UG detection survey and geotechnical investigation is performed by using third party subcontractor. Existing pipe rack in ORYX GTL unit -90 is used to route the fire water pipeline and adequacy check for the same structure is performed. New pump foundations and valve pits are designed and detailed. A pipe supporting trestle is designed to support the pipe in higher elevations. Road crossings and utility crossings are developed and micro tunneling is proposed in the Raslaffan avenue.

Review of underground pipeline drawings

Technical support is provided to client for RLIC approvals

Coordinated with inter discipline engineers, subcontractors and client

Scope of work and review of Geo tech, Topo survey and UG scanning survey

Detailed Engineering Design (DED) for TG/NG Tie-in Valve to Boilers for Use of TG as Fuel (MOC-1413)

Tail gas line is routed to the existing boiler through existing pipe rack to reduce the flare. Adequacy of existing pipe rack, design for the new pipe supports, valve access platform was developed under this package.

Participated in the Design review meeting & HAZAB studies

Project: RasGas General Engineering service. Client – RasGas RLIC Qatar

Responsible for the civil & structural deliverables and worked as an active team player on RasGas GES Project. Executed brown field jobs for RasGas LNG plant for different stages such as Pre-FEED, FEED & Detail Engineering to upgrade the existing facilities to the client satisfaction.

Coordinating with client for project requirements and deliverables approvals.

Provided support to the construction team to execute the work.

Adequacy check was performed for the existing structure when it’s modified for the additional requirement.

Highlighted the cost and schedule impact to the project team.

Chemical storage shelters are designed and detailed to construct in various locations of RasGas plant.

Existing Mosque building was extended to increase the capacity. Adequacy check for the existing RC building is performed.

New Gym and recreation building are designed and detailed.

Adequacy check is performed for the Existing CTG inlet filter structure to replace and upgrade the new GTG filter structure.

Design and detailing were developed to replace the Porta Cabin into Permanent Buildings

A FEED design is carried out for the permanent operation village. Layout for the plot with various buildings and general civil drawings for the drain, fence, road and Arch structural drawings for the buildings are developed.

Existing Al-Khor international school building is extended incompliance to QCDD requirement. Adequacy check for the existing RC building is checked due to modification in the building’s layout. Architectural, structural and underground drawings are prepared to complete the scope. A new water tank and its foundations are designed and detailed.

Project: AL UQLAH Central Production Facility, Block S2, YEMEN Client- OMV Exploration & Production GMBH

Responsible for all civil and structural deliverables.

Prepared the design and detailing of steel and RCC buildings.

Review of Vendor documents / drawings.

Guided to designer to develop the design drawings and checking of all design drawings.

Discipline Input to Engineering schedule and Progress reports

Participated in the model review, attend the site / technical / vendor queries.

Participated in the hand over activities.

Monitor the Designers and checkers to achieve the progress of the project.

Control cost of the project by calculating the material requirement for each drawing.

Coordinate with other disciplines.

Proposal: ENOC LPG Terminal. Client- Emirates Gas LLC

Prepared the RFQ & TBE for the topographical, UG detection survey and geo technical investigation to finalize the vendor. Responsible to quantify the work for the cost estimation.

Project: TM-1 Transnet New Multi-Product Pipeline Project (NMPP), South Africa. Client - Transnet

Responsible for analysis, design and checking of engineering deliverables for structures like pipe rack, equipment foundations, platforms and preparation of GA of main line pump area, manifold area, loading unloading area and booster pump area etc. for the fuel storage facility at Durban using South African Standards and project specifications. Co-ordination with other disciplines and design team based at Johannesburg.

Discipline Input to Engineering schedule and Progress reports

Proposal: GASCO MMS UPGRADE & PLC SYSTEM REPLACEMENT ABU DHABI, Client- (Gasco)

Estimate the material requirement and cost for the Extension of building, modification of building, new supports for the electrical / instrumentation items, cable trenches and road crossing.

Project: BROWSE LNG ACCOMMODATION PRECINCT AUSTRALIA. Client - Wood Side Energy Ltd (WELL)

The accommodation village is prepared for construction village (6000 peoples), operations village (500 peoples) and turn around camp (700 peoples). The accommodation precinct contains accommodation clusters, kitchen with dining, multi court sports facilities (cricket ground, basketball, volley ball and tennis court), recreation, gymnasium, aerobics, communication building, vehicle wash down facility, bus shelter, BBQ, Gazebo, swimming pool, smoking shelter squash court building, bi-cycle storage, medical building, retail center, bowling alley building, EPC owners office, locker building, bulk linen laundry, security building, ware house, emergency response building, admin building, ICE room etc.

Prepared the specifications, concept documents, concept drawings, RFQ, TBE & TBA as per owner’s specifications and basis of design.

Approved concept drawings are modified as a feed drawings and structural design calculations are developed for the same. Design of drain, road, fence and site grading was developed for the plot.

Quantified all the civil works & structures (modular building and pre-engineered building) including foundations and trenches. Quantified pipe supports, DB, junction box, valve pit, manhole, hand hole, SLS pit with retention tank, lighting pole, fence light, CCTV pole foundation, card reader pole foundation etc.

Project: PE11E010AU ICHTHYS Onshore LNG Const Village Facility Project Client: JKC (JGC KBR CHIYODA)

Accommodation layout is prepared as per design basis and fit out requirement. Prepared the RFQ to identify the vendor for the Modular building and pre-engineered building. Preliminary design is developed for the concrete and steel Buildings. Quantified the material for the building work, trench work, utilities and vendor packages to calculate the project cost.

2010 – 2011

FOSTER WHEELER INDIA PVT LTD, CHENNAI, TAMIL NADU, INDIA

Oil & Gas

Engineer - civil & structural

Project: PARADIP REFINERY PROJECT Client: INDIAN OIL CORPORATION LIMITED

Analysis and design of pipe rack structures in NHT Unit.

Analysis and design top mounted plot form on vessel.

Design of crane foundation. Preparation of design for MPS (Miscellaneous pipe support) and MCP (Miscellaneous concrete pedestal) for to support pipes.

2008 – 2010

BGR ENERGY SYSTEM, CHENNAI, TAMIL NADU, INDIA

Hydro & Power Delivery - Engineering India PVT Ltd

Structural Design Engineer

Project: METTUR THERMAL POWER PROJECTS (STAGE- III) Client: TAMILNADU ELECTRICITY BOARD

Floor framing, Numeration, RCC and architectural plans prepared for all floors.

Analysis and design of steel pipe rack.

Analysis and Design of staircases, equipment foundations, cable trenches, pavements, and drain layouts.

Analysis and design of interconnecting platform between boiler to mill bunker feeding floor.

Analysis and Design of fire water tank.

Design of ring wall foundation for resting of oil storage tank, dyke area and drain oil tank pit.

Design of compound wall.

Checking of junction tower design for coal handling area.

Preparation of architectural drawings (Each level plans, all the views and cross-sectional details) for STG building and staircases.

Analysis and design of chemical house in pretreatment area.

Design of wall beams, cladding supported beam & staircases for Turbine generator building.

Project: KHAPERKEDA THERMAL POWER STATION EXPANSION PROJECT (1 X 500 MW)

Client: MAHAGENCO

Analysis & design of elevator (lift) and staircase.

Analysis and design of pipe rack structure near STG Building C row and E row.

Design of ventilation and bus duct supporting structures.

Analysis and design of interconnecting platform between the oil storage tanks in fuel oil dyke area.

Analysis and design of power conductor and shield wire supporting girder.

Analysis and design of cable and pipe rack for transformer yard to STG building.

Preparation of drainage layout for inside and outside of the STG building.

Preparation of 8.5m floor Numeration and R.C.C detail drawing and 17.0m control room architecture drawing.

Preparation of grating floor drawings with supporting beams.

Analysis, design and detailing of various numbers of staircases and detailing of cage ladders.

Analysis and design 0.0m equipment foundations like debris filter, air drier, air compressor and air receiver.

2008

L&T-CHIYODA LIMITED (FAMILIER IN OIL & GAS PROJECTS), MUMBAI, MAHĀRĀSHTRA, INDIA

Oil & Gas

Structural Design Engineer

Project: BAB GAS COMPRESSOR PROJECT, ABU DHABI Client: ABU DHABI COMPANY FOR ONSHORE OIL OPETARIONS

Analysis and Design of air fin cooler Structures.

Preparations of Material take off for the air fin cooler Structures.

Preparation of estimation and BOQ list.

Project: HYDROGEN GENERATION UNIT, GGSR, INDIA Client: GURU GOBIND REFINERY PROJECTS, BATHINDA, INDIA. HPCL-MITAAL ENERGY LTD.

Analysis and Design of technological Structures.

Preparation of Material takes off for the technological Structures.

Preparations of combined Material take off for the HGU unit.

Preparation of Basis of estimation and BOQ list.

Project: HYDROGEN GENERATION UNIT, MRPL, INDIA. Client: MANGLORE REFINERY & PETROCHEMICALS LTD, INDIA

Analysis and Design of equipment foundations and reformer area foundation Structures.

Preparation of Material takes off for the above foundation Structures.

Project: SULPHUR RECOVERY UNIT GUJARAT. Client: INDIAN OIL CORPORATION LIMITED

Structural analysis and designing of structures.

Coordination of drawing preparation and review the drawings.

To prepare the design of structures by using STAAD PRO software.

Coordinate with other discipline specialists like piping, equipment, electrical, process control

And obtains input necessary to perform the structural design

Based on loads and soil profile to desire the foundation type.

Code checking shall be performed using Indian code IS 800 and British code BS5950.

Attend Project Progress meeting

Review the 3D model of structures by using the soft ware’s Navis works and smart plant review to check the clashing and constructability.

2007 – 2008

C.R. NARAYANA RAO ARCHITECTS AND ENGINEERS, MUMBAI, MAHĀRĀSHTRA, INDIA

Structural Design Engineer

GENTRAL MOTORS INDIA Car Plant Structure at Talegaon – PUNE Client: GENTRAL MOTORS INDIA

Review the design calculation and drawings which was done by other consultants.

Analysis and design of structures which was not outsourced.

Coordination to prepare design calculation.

Checking of all structural detailed drawings.

Site inspections and discussion with contractors & clients. If alternate solutions given in site itself.

Coordinate with other discipline peoples and obtain input necessary to perform the structural design.

Code checking shall be performed using Indian code IS 800-2007.

Attend the project progress meeting

2006 – 2007

VICI ENGINEERS AND CONSULTANTS PRIVATE LTD., CHENNAI, TAMIL NADU, INDIA

Infrastructure - Industrial Facilities

Structural Design Engineer

Project: TATA INDIGO/INDICA CAR PLANT STRUCTURE AT PUNE Client: TATA- KUKA – DURR, GERMAN

Analysis and Design of hanging Structures

Documentation of design basis and analysis.

Preparation of design document, loading diagram and load data document.

Preparation and Checking of structural detailed drawings.

Site inspections and discussions with fabricator/ client to clarify of all doubts in designs and drawings.

Project: U.S DUCT PROJECT (CLIENT ALSTOM-Delhi)

Analysis and Design of duct supporting structures.

Preparation of design basis and documentation of analysis reports.

Coordination for structural drawing preparation.

Project: U.S PROJECT ELETRO STATIC PRECIPITATOR REBUILDS (ESP) Client: ALSTOM-Delhi

Analysis and design of hot and cold roof structures.

Design of beams for hot and cold roof.

Preparation of design basis and documentation of analysis reports.

Years of Experience

15 years

Years with SNC-Lavalin

9+ years

Key Positions

Engineer - Civil

Engineer - Structure

Field Engineer

SME from End user

Languages

English

Tamil

Hindi Basic

Site Experience

India

Qatar

Computer Applications

STAAD Pro

Autocad

CIRCLY

MAT 3D

Visa Status

NOC available

Qatar driving license available



Contact this candidate