Post Job Free
Sign in

Electrical Engineer

Location:
Doha, Qatar
Posted:
July 26, 2020

Contact this candidate

Resume:

PERSIDIS EMMANUEL JIJOE.

Correspondence address: Tel. Phone Number: +974********

Mr. PERSIDIS K. JIJOE E-mail address: ********@*****.***

C/O P.O. Box 19389, QDVC Date of birth: 27 November 1968

Doha, Qatar. Nationality: Ghanaian

OBJECTIVE.

As a goal- oriented individual with more than a decade proven-records in oil and gas industry as Instrumentation and electrical (E/I) commissioning overall supervisor and with more than 7years experience in GCC countries in process control and electrical supervisor in MEP team, I am ready and willing to work effectively and efficiently in any multi-national company to achieve its set-targets in a safe, healthy, challenging and competitive environment with full dedication, enthusiasm and co-operation with other team players in the field .

WORK EXPERIENCE

INTERNATIONAL MANAGEMENT CONSORTIUM (IMAC) DOHA, QATAR Lusail LRT Project March 2018 till date. POWER SWITCHING ENGINEER (P.S.E). Responsible of over-head catenary switch and other type of electrical panel’s isolation and energisation.

QATAR DIAR VINCI CONSTRUCTION (Q.D.V.C) DOHA, QATAR

Lusail LRT Project March 2015 till March 2018.

Electrical supervisor in charge of MAR 03.

Responsibility includes checks and supervision of all electrical activities required to be

Performed by the sub-contractor are executed according to the approved drawings issued for the installation. Some of these activities include:

A) Installation of LV containment.

B) Installation of ELV containment.

C) Revision of detail design drawing (DTD).

D) Site coordination with all other MEP services.

E) Recommendation to technical department for all site modification in terms of Site installation to be implemented in SHD as as-built drawing.

F) Other activities include LV and ELV cables and wires pulling, installation of all electrical panels with testing of ACB, MCCB and other electrical protection system supervision.

G) Full support to testing and commissioning team during interface testing mostly fire

detection system, while focussing on the cause and effect matrix table.

QATAR DIAR VINCI CONSTRUCTION (Q.D.V.C) DOHA, QATAR SHERATON CAR PARK PROJECT (SPP Project) October 2014- March 2016

a)Testing and commissioning activities of all electrical installation.

b)In charge of lock-out/ tag-out system.

c)Coordination with all other MEP services for faultless start-up.

d)Responsible in issuing all work permit during testing and commissioning stage.

e)Verification and resetting of all pumps and level trip settings

QATAR DIAR VINCI CONSTRUCTION (Q.D.V.C) DOHA, QATAR

Pumping Station 70 (PS 70) January 2012- June 2012

A) January- June 2012: construction and commissioning activities.

Instrument commissioning supervisor responsible to manage E&I team. The main objective of this responsibility is to make sure all instrument activities are followed up according to design and procedures from installation to start-up. Encourage good progress from all the team members and make sure all test forms have been signed by the client. All signed form is recorded and updated in the instrument follow-up table.

Good knowledge in pumping analysis, Rotor actuated valves and UPS.

Pumping Station 70 (PS 70)

B) June 2012 till date: Preservation and maintenance activities.

i)Daily routine-check of all instrument and electrical devices in the facility.

This requires verification and operational status of devices on site. Corrective

maintenance is required to ascertain the integrity and the reliability of all ins-

trument and electrical equipment during start-up and full operation.

ii)Monthly and hourly running of all centrifugal pumps in the facility.

This consists of running all the pumps for an hour each with clean water. In this operation, all the process variables such as vibrations, temperatures, flow and pressure values are monitored. Each pump has it print-out, report from SCADA for report and performance purposes.

iv) All Rotork actuated valves and penstocks are operated once monthly to check if

there is any mechanical problem.

iii)Removal / cleaning of all air filters for ventilation system is also done once

month. Greasing of all rotating equipment is always done to avoid rusting and break down.

WEST AFRICAN GAS PIPELINE COMPANY ( W.A.G.P.CO ) LAGOS, NIGERIA.

Project Number 51399. December 2009- January 2012.

Instrument commissioning / construction technician: the responsibility includes safe and good practice in the handling of all instrumentation devices and make, if necessary, suggestions and recommendation to client for modification of design which cannot be implemented as regards to site condition. Also all instrument test form from installation to commissioning are duly signed by the client and handed over to documentation department for reference.

This project joins four countries in West Africa by gas pipeline laid along the coast of the Atlantic Ocean and stretched over 678km between Nigeria, Rep. of Benin, Rep. of Togo and Ghana. The end of this project offered me a maintenance contract (preventive and corrective) of all the instrument and electrical equipment in all the facilities in the various countries forming the company. The goal is to make sure all the devices are reliable and work efficiently.

Also in my line of duty, I have the responsibility to commission and start all the gas heaters in the RM stations.

Assist Solar Turbine vendor in the maintenance and troubleshooting of defective instrument devices to be replaced during operation.

HUNDAY HEAVY INDUSTRY (H.H.I) ESCRAVOS, NIGERIA

Escravos Gas Project Phase 3: E.G.P 3 April-December 2009.

Instrument foreman: I have the duty to verify and confirm that all instruments correspond to the requirement of the process design and fit for operation. I also liaise to other disciplines to safely and harmoniously work together without causing injury or accident to the personnel or the equipment. To these responsibilities are added the fire and gas system in all the substations to be commissioned and put into operation.

NIGERIA LIQUEFIED NATURAL GAS (N.L.N.G) N.L.N.G, TRAIN 6

Bonny Train6 OSBL Project. January-2007 to April-2009

Commissioning technician with the task of overseeing the activities of different working team. I assist also in solving some technical issues such as modification of field installation devices which in drawing are approved but not practicable in the field. The devices are finally accepted as built and approved.

I engage in field calibration exercise by helping the working groups to avoid making mistake in the calibration of control valves, differential pressure and flow transmitters, temperature

transmitters, hydrostatic and ultrasonic level measurement devices, and testing of fire and gas loops. With the system engineer on the SCADA system, I was in charged to supervise the activities of the testing groups in the field and to monitor on PLC that all signal and command are aligned up to the SCADA system during simulation and functional tests.

EXPRO GROUP / SUNFYNE DYNAMICS Ltd. WARRI, NIGERIA

Chevron Dibi Early Production Platform ( Swamp Queen ) July-September 2006

I/E foreman in charge all cable routing and glanding / termination to their designated panels.

Also ensure that all instruments are calibrated according to data sheet before installation. Also, I look to the testing of all cables and loop check / loop test.

TOTALELFINA OFON PLATFORM

D.B.N: wellhead revamping and upgrading. June 2006

Instrument fitter in charge of calibration pneumatic pressure transmitters.

EXXONMOBIL / TECHNIP OIL AND GAS RECOVERY PLATFORM.

Amec Spie Nig Ltd, East Area Project June- August 2005.

Project number: 5292B.

I am in charge of instrument cable trays, pulling of instrument cables (power, signal and control cables), including their testing followed by the onsite calibration of the installed instruments.

Also, I liaise with the client in the signing of all instrumentation related activity forms such as: installation forms, cable test forms, calibration forms, digital /analog input and output test forms.

EXXONMOBIL / TECHNIP REVAMPING OF U-BIT PLATFORM

Amec Spie Nig Ltd, East Area Project December 2004 to April 2005.

I play the role of instrument technician in the fabrication of new instrument cable tray support, running of instrument tubing and modification of pneumatic control panel for the testing of the deluge system in case of fire occurrence.

ENTREPOSE CONTRACTING /DELATTRE BENZONS Nig. Ltd (D.B.N) WARRI REFINERY.

Turn Around Maintenance: T.A.M July 2002 to September 2004.

On this project, I act as instrument technician. Here I need to plan and participate in the removal of the obsolete instrument devices and replaced them with new ones (all kind of instruments). This happened in all the various unit of the refinery including the alkylation plant. At this time, I have to coordinate the collection and movement of all materiel needed to the warehouse for storage.

Also I assist the client in the commissioning during the start-up of the various units of plants after the turn- around -maintenance period.

ENRON /TTS / DELATTRE BEZONS Nig. Ltd Egbin Power Barges, Lagos.

Installation of 225MW (9 225MW) November 2001 to July 2002.

I assume the task of instrument lab technician in charge of all instrument calibration and preparation of the forms to be signed by the client. The scope includes all the gas system work, the demineralization and the deionization.

EDUCATION

1. Niveau Bac2, serie D.

2. Electrical and Electronic technician Certificates: T1, T2, T3 with CITY and GUILD of London INSTITUTE

3. Apprenticeship Certificate in electronics.

4. First school leaving certificate.

ADDITIONAL COMPETENCE

Electrical Habilitation certification for Electricians Operating in LV and HV, APAVE trained.

Advance Process Control Knowledge.

Different safety training courses.

Extensive skill to organise team workers for fast progress.

Capability to work with different nationals.

Also fluent in French language (spoken and written).

Extensive knowledge in MS EXCEL and WORD.

REFREES

1. Mr Michel TRAORE

Electrical Site Manager

LRT Project- Underground Works.

Tel: +974-********.

2.Mr Mathieu Ribeiro.

VINCI GRANDS PROJETS/ ENTREPOSE CONTRACTING.

Electrical and Instrument Superintendent.

Tel: +336********.



Contact this candidate