|
Resume alert |
Resumes 101 - 110 of 232 |
Al Dafna, Qatar
... Transformer shed for the storage (MOC-2032) A transformer shed (33mx8m) is designed and detailed with removable roof for the storage of transformer. Responsible for all civil & structural deliverables. Site survey conducted for all work orders to ...
- 2020 Aug 20
Al Dafna, Qatar
... : Setting-out design position and level of transformer pit, primary and secondary duct bank interconnecting from pit to pit. : Involved in setting-out centerline and edges of runway, taxiways and exit taxiway by fixing steel pin on the ground at ...
- 2020 Aug 19
Al Dafna, Doha, Qatar
... beams, roof beams, monorails, chequered plates etc) and erection of equipments (pumps, storage tanks & boiler) • Installation of Transformer explosion prevention system for Kahramaa S/S at Ras Girtas Power Plant, Ras Laffan – contract value: QAR. ...
- 2020 Aug 09
Al Dafna, Doha, Qatar
... ELV manhole Cable Pulling, Responsible for the monitoring of KAHRAMAA Works and its subcontractor for 11kV Cable laying, 11kV Cable Jointing, MV Switchgear Erection and Jointing, Transformer installation, LV Switchgear erection and jointing, etc. ...
- 2020 Aug 04
Doha, Qatar
... • Transformer Oil filtration & Testing of Die-Electric strength. (BDV) • Attend all testing of power transformer & distribution transformer. • Have gained good experience in trouble shooting of all types of electrical equipment in shutdown works. • ...
- 2020 Jul 26
Fereej Ibn Dirhem, Qatar
... GI piping, trucking, cable tray, data cable, mounting all the related panels Prepares Coordination drawings for all MEP works at the site Cabling, grading and termination for secondary and primary field of 11kv transformer at the sub-station. ...
- 2020 Jul 25
Fereej Ibn Dirhem, Qatar
... to erection, testing commissioning and maintenance services for all types of projects R05,R15,R34 Towers (2B+G+9F) Transformer – 3 nos (1600 kVA), LV Panel – 3 nos (2500 A),Generator- 500kVA-3No's) Proposed Hotel Apartment (B+G+5P+17+2PH) ...
- 2020 Jul 19
Fereej Ibn Dirhem, Qatar
... • Preparation of engineering calculation such as voltage drop computation, sizes of wires, transformer, height and type of poles, insulators and other protective devices and instruments to be used and more engineering enhancements to produce a ...
- 2020 Jul 19
Fereej Ibn Dirhem, Qatar
... Works End User Qatar Petroleum QP 5 Designer Energo Projekt Entel (EPE) Design Coordinator: Sep 2008 – Jan 2011 Key Responsibilities: Coordination of all kinds of and services equipment with design structure and size such as" transformer bays, GIS. ...
- 2020 Jul 18
Fereej Ibn Dirhem, Qatar
... October 24, 1997 5.1 Variable Speed Drives and Controllers for Motors 5.2 Automatic Transfer Switches (ATS) 5.3 Transformer Test Equipment 6.0 COMPUTER AIDED DRAFTING AND DESIGN (CADD) Crescent Technologies Institute, 24 April, 1995 – 11 May ...
- 2020 Jul 17