Post Job Free
Sign in

Manager Engineer

Location:
Fereej Ibn Dirhem, Qatar
Posted:
July 18, 2020

Contact this candidate

Resume:

- * -

ALI SALMAN HIJAZ Mobile: +974********

E-mail:***.*****@*****.***

Civil Engineer with 14 years of varied experience, highly skilled Project Engineer/ Site Manager, working on Site in Qatar.

CONSTRUCTION MANAGER–CIVIL (CONSTRUCTION)

Infrastructure,400KV Substations,Bridges,

Roads, Buildings and Residential tower,Airports,

ASPIRING A SUITABLE POSITION IN AN ESTEEMED ORGANIZATION THAT GIVES ME AN OPPORTUNITY TO EXPLORE MYSELF AND CONTRIBUTE TO THE DEVELOPMENT OF THE ORGANIZATION. AREAS OF EXPERTISE

UPDA Grade B.

Full site coordination & supervision

Infrastructure

Define major activities

International Construction Standards

Technical Work Instruction

Lead and Supervise of construction

team

Actual Planning

Resources Definition

Critical Path

Assigning resources and present needs

to PM/CM

Follow the two weeks look ahead

Work alignment with team on site

On Site Cost Control

Str. Calculation notes

Methods Statement

High Capacity to lead and assign

groups per activity needs

Team Leadership & Management

Autocad 2020 2D/3D

Sap2000 Knowledge

Primavera P6 Knowledge

MS project knowledge

Technical Coordination

Site Managing

Design Coordination

Procurement

Tendering & Estimation

RMDK, Doka & Peri Formwork Systems

PROFESSIONAL SYNOPSIS

Lead and Supervise of construction team on site including site engineers, Forman, lead man and labors.

Define major and critical activities and tackle any kind of delays with the team.

Assigning resources and present needs to PM/CM.

Instructions on daily bases follow up on the coming details and critical path activities that might affect the forecast planning.

Follow the two weeks look ahead.

One-day look ahead under daily construction meetings

Full site coordination & supervision with QA, QS, QC and topographical fields. Interlocution between site and Design.

Work alignment with miscellaneous teams on site.

Modification processes taking into Contractual and Financial nature for the modified matters.

Operate AutoCAD program of all versions (Advanced 2D&3D specially 2016 Renderings and Materials Interior and Exterior Designs), Urgent Designs, Urgent Approvals.

Operate Primavera Project Planner (Oracle P6) Planning and progress updating in coordination with Management.

Operate MS Project Planner and Progress Updating.

Operate Sap2000 Program for major and minor calculation notes and urgent calculations needed for approvals.

Import BBS/couplers from Drawings necessary for RC structures including take off-ordering and delivery of steel.

Provision of Technical support for Procurement on specs and quality

Familiar with all versions of Windows and all versions of MS Office especially Word and Excel (Applying Links, Formulas, Visual Basic, Create Functional and useful spread sheets in order to simplify Calculations, Follow-up Progress, Reports, Document Controlling, Evaluations, Alerts, Critical Activities, Professional Reports, Long lead Items, Invoices…etc.

Estimation of new tendered projects.

Familiar with All types of structural calculation notes using Orion14, stad, sep2000, etaps, Robot.

Commenting design drawings, material submittals and method of statements.

Assuring adherence to client specifications, standards and HSE Risk assessment. 2

EXPERIENCE SUMMARY

Project Engineer: August 2018 – Present

Key Responsibilities:

Estimation:

Renovation at Amiri Hangar DIA Under HIA supervision:

Current Job Leading as project Manager at Amiri Flight Base Under Renovation of Amiri Hangar contract including Roofing, Floor Tiles, Gypsum Board, Painting and decorations. Over 6-7 months working at estimation and Tendering department reporting to Technical Director. Bridge Project East Industrial Area (1.8KM Two Ways Bridge):

Responsibility for execution one of the of biggest bridges in the State of Qatar Under Ministry of Works Ashghal.

Evaluation of construction teams and selections of productive manpower specially rentals

Coordinate and solve of logistics, delivery of material activities and solving the problems that can affect the needed targets in the plan On Daily Basis with strong management presence.

Attend Client & Consultant Meeting to update on progress and solve any issue that might affect the quality and HSE of the works.

Supervise and follow up on the production teams for shuttering and concreting of the major concrete project.

Professional Experience with professional teams in execution Heavy duty shutter formwork like Doka/RMDK/Profimax/Akro/Peri.

Construction of huge Bridge footings

Construction for underpass bridge execution.

Construction of Piers with height up to 18 m.

Shoring of 90m length with various heights for spans from 8 to 14m high.

Construction of Bridge Deck with all details including Abutments Diaphragms bottom deck webs and top deck with construction joints.

Installation of Bridge bearing pads and all details for Bridge Supports including monolithic and hinged supports.

Expansion joints Detailing and execution

Post-tensioning Bridge Experience from A to Z.

High Management Experience in cost controlling and resource preference and estimating for activities.

Working under high safety requirements and procedures.

Handing Over

Key Project:

Project P017 East Industrial Road Bridge

Duration Dec2017-october 2019

Client Ashghal Qatar

Main Contractor Tekfen Construction/Aljaber Engineering Sub-Contractor Builders Advanced

Consultant Parsons

Value 180MQRS

EXPERIENCE SUMMARY

Project Engineer/Shift Site Manager: May 2017 – August 2018 Key Responsibilities:

Arrange planning with team.

Progress with reporting to PM/CM and follow daily with activities and needs.

Coordinate and solve of logistics.

Delivery of material activities and solving the problems that can affect the needed targets in the plan. 3

Execution 20 Nos of 70x20x3m thick raft, heavy concrete works,1to 3m walls thicknesses with height varies from 6m to 13m, suspended slabs including walls and partition walls, columns, strut beams. Etc.

Technical Support for the project team

Ordering of material as per approved vendor

Checking of invoicing to the client.

Team leading on site group of 300 workers with general Forman, Forman and lead men, hold on heavy civil jobs together with construction team on site, delegate activities to the team to reach the main focal target from the team works.

Coordination with QA/QC and Follow up with the inspections and accelerate the procedure of inspections prior to concrete, rectify any urgent detail on site.

Supervise major concrete activities (3000 to 4000 cum of concrete per one item) and assure the good quality and finishing by the team.

Key Project:

Project DESIGN & CONSTRUCTION OF CP07B- LUSAIL PLAZA INFRASTRUCTURE, LRT STATION, PUBLIC CAR PARK AND LANDSCAPE

Duration May 2017 – February 2018

Client Lusail Real Estate Development company,

Doha, State Of Qatar.

Main Contractor QD-SBG CONSTRUCTION

Sub-Contractor BUTEC, QATAR

Consultant DORSCH, QATAR

Project Villaggio Rain Water Project

Duration February 2018 – May 2018

Client Villaggio Real State.

Main Contractor BUTEC W.L.L

Consultant Salfo Qatar

Project Engineer/Shift Site Manager: June 2015 – May 2017 Key Responsibilities:

Responsibility of planning & Progress and reporting to PM/CM and follow daily with activities and needs.

Coordinate and solve of logistics, delivery of material activities and solving the problems that can affect the needed targets in the plan.

Attend Client & Consultant Meeting to update on progress and solve any issue that might affect the quality and HSE of the works.

Technical Support for the project team, delivery of material, Ordering of material as per approved vendor, invoicing to the client, Team leading on site, hold on heavy civil jobs together with construction team on site, delegate activities to the team to reach the main focal target from the team works.

Supervise and follow up on the production teams for shuttering and concreting of the major concrete project.

Construction of 200x100x9m height Reservoir including all accessories (Ras Abu Funtas Area-RAF A3 Desalination Plant).

Construction of 13 Nos MCC stations.

Construction of 5 Elevated water Tanks with 15m height from ground.

Execution of GRP pipe lines

Finishing Works

Planning

Invoicing

Procurement follow up

Key Projects:

Project Ras Abu Funtas Desalination Plant Qatar RAF A3 Duration June 2015 – April 2016

Client Kahramaa

Contractor Acciona Aqua, ToyoThai (TTCL) and Mitsubishi developer partnership Subcontractor BUILDERS ADVANCED ENGINEERING AND CONSTRUCTION Consultants Fitchner

Value 350 Million QR

Project GTC 499/2012- REHABILITATION OF Six(6) NOS. WELL FIELD STATIONS Duration April 2016–May 2017

Client Kahramaa

Contractor Schlumberger

4

Subcontractor BUILDERS ADVANCED ENGINEERING AND CONSTRUCTION Consultants Medad Engineering Consultant WLL

Value 130 Million QR

Senior Civil Engineer: April 2012 – June 2015

Key Responsibilities:

Technical Coordinator

Arrange Detailed Design for Civil, architectural and Utilities installation related to district cooling plant 90000RT details with our partner ADC and our approved design consultant (AEB).

Reporting to PM/CM and follow daily with activities and needs.

Coordinate and solve of all Design & Construction problems and or updates that can affect the needed targets in the plan

Attend Client & Consultant, subcontractor technical Meetings to update on progress and solve any issue that might affect the progress of the works

Technical Support for the project team, delivery of material, ordering of material as per approved vendor, Quantity Surveying for urgent and long lead items.

Renovation

Procurement

Quantity Surveying.

Estimation of projects.

Key Projects:

Project Marina District Cooling Plant

Duration 2014- June 2015

Client Marafiq Qatar

Contractor BUTEC-ADC JV.

Value 75 Million Qrs

Project CP69 HIA Qatar (Hamad International Airport) Duration April 2012–Dec 2014

Contractor BUTEC-JOHNSON CONTROLS JV.

Consultant OBI Bechtel Overseas

Value 200 Million QRS

Consultant: Jan 2011 – April 2012

Key Responsibilities:

Structural Design

Municipality follow ups

Ministry Follow ups

Design review for contractors submittals

Material review for contractor submittals

Design criteria and analysis

Sap2000

Tedds

Key Projects:

Client Kahramaa

Position Consultant

Scope Design, Method statements& Material Review from different contractors. Contracts GTC/318/2009, EZD-SE-01/2009.

Consultant Energo Projekt Entel (EPE)

Client Galfar Almisnad (QP Scope)

Position Structural Designer and Drafting Works

End User Qatar Petroleum QP

5

Designer Energo Projekt Entel (EPE)

Design Coordinator: Sep 2008 – Jan 2011

Key Responsibilities:

Coordination of all kinds of and services equipment with design structure and size such as" transformer bays, GIS. System and MEP.

All drafting work, as built drawings, urgent designs, topographic data, All Civil quantity surveying "Concrete, reinforcement Steel, louvers, tiles, structural steel, grating, paint.

Assurance that all works in compliances with client specification.

Coordination Procurement.

Experience with the design office “Qatari Engineering and Associates (QEA)” in understanding all types of structural calculation notes”, and comparing all the calculation with the design drawing.

Assure optimized designs to maintain quality and quantity of material used in the design.

Value Engineering

Key Projects:

Project UMM BIRKA SUBSTATION “400/220/132/11KV” CONTRACT No. GTC / 144A / 2006 Duration Sep 2008-Jan 2011

Client Kahramaa

Contractor Areva T&D.

Consultant Energo Projekt Entel (EPE)

Value 128 Million Qrs

CEC Lebanon Part of MCE USA

Structural Engineer: Sep 2005 – Sep 2008

Key Responsibilities:

Structural design of timber materials, projects located in LA City USA.

Handled all drafting works.

Developing a system "program" of spread sheets for all kinds of calculations and following all updates. Total number of sheets is 40 done on the same work book and linked all together. e.g. seismic analysis, wind analysis, gravity calculation loads…etc

Total number of projects done in 2 years is about 500 structures including commercial centers, Luxurious Houses and so on.

CREDENTIALS

Education

Bachelor of Civil Engineering–LebaneseUniversity – 2006.

UPDA Grade B Qatar.

Computer Skill

AutoCAD- Version 2017

Microsoft Word, Excel & Internet Access.

Primavera project planner Version 6.

Sap 2000 Modeling and analysis

3D Max

6

PERSONAL PARTICULARS

Date of Birth :23-march-1984

Languages Known : English, Arabic

Nationality :Lebanese-Colombian

Passport No. : RL 0876789

Marital Status : Married

Visa Status : Work Visa with NOC

REFERENCES

Mr. Sarkis Moawad

AREA MANAGER

BUTEC

+00974.66598234

Mr. Amin Ashkar

Operations Director(Owner)

Builders Advanced Engineering &

construction

+00974.55599342

Mr. Talal Alhamra

Project Manager

P017 East Industrial Road Bridge

Builders Advanced

+00974.33652360

Mr. Thomas Ikonomou

Senior Construction Manager

Builders Advanced Engineering &

construction

+00974.33696341

Mr. Momcilo Mevric

Energoprojekt Entel

Area Manager

+00974.44478571

Mr. Elie Houbieka

Business Development Manager

QDVC

+00974.55599342

7



Contact this candidate