SUMMARY OF QUALIFICATION
College graduate with degree in Electrical Engineering experienced in engineering and quality improvement of electrical components and instructional documentation. Excellent at multi- tasking with proven ability to handle diverse electrical, mechanical and IT duties. Computer literate.
EDUCATIONAL ATTAINMENT
Bachelor of Science in Electrical Engineering (March 29, 2008) Golden Gate Colleges
Batangas City, Philippines
I. PROFESSIONAL EXPERIENCE
BK GULF WLL – ENGINEERNG AND CONSTRUCTION
Design & Build of Lusail Palace
Semaisma, Doha Qatar
June 9, 2019 up to Present
Position: Electrical QA/QC Engineer
Duties and Responsibilities:
• Preparation and Submission of Electrical & Fire Alarm, Small Power, PAVA and Method Statement.
• Conduct Inspections for all Incoming Material Inspection (IMI) to ensure that all materials and equipment delivered to project are as per approved material submittals and project requirements.
• Prepare a detail list of Material Delivery to Site together with their supporting documents such as Delivery Notes, Country of Origin, Test Certificates, Approved Material Submittal and relevant approved Shop Drawings (if required) as part of Attachment and Reference for Request for Inspections for to be submitted to Client for their witnessing, verification and approval.
• Lead and Conduct Incoming Material Inspection with the Client and Consultant and get approval prior to issuing materials or equipment for site installations.
• Conduct internal inspections and testing of every successful completion/finished electrical works together with the respective engineers or supervisor in-charged to check that installations was done correctly prior to preparation and submission of Request for Site Inspection (RSI) to Client or Consultant for their inspection and approval. ROSANO E. INANDAN
Al Thumama, Doha Qatar
Qatar no.: 33923656
Email Address: ****************@*****.***
• Carryout, Coordinate and Lead Site Inspections to ensure that IMI and RSI are inspected in timely manner, satisfaction and approval of Client/Consultant are met.
• Maintain a detail log of Incoming Material Inspection (IMI), Request for Site Inspection
(RSI) and Non-Conformance Report (NCR).
• Prepare QA/QC Report as part of HSEQ Monthly Report which included in Monthly Progress Report of the Project.
• Ensuring that all information/drawings issued to Site Operatives as stamp Issued for Construction in proper manner and details produced follow approved project specification requirements.
BK GULF WLL – ENGINEERNG AND CONSTRUCTION
National Museum of Qatar Project
Doha Qatar
February 17, 2014 up to June 8, 2019
Position: Electrical QA/QC Engineer
Duties and Responsibilities:
• Acting as Management Representative (MR) to prepare the Internal Audit schedule, conducting internal audits and responsible for implementation of QMS as per ISO 9001:2008 to its full extent
• Identifying the non-conformances, addressing in Non-conformance report (NCR) and resolving them with proper corrective & preventive actions. Maintain the NCR logbook and follow-up to close NCR's.
• Preparation of inspection and test plan (ITP) and work method statements for job execution.
• Analyze shop drawings, monitor and supervise the execution of all MEP requirements for Electrical Systems: HV/LV/MV Distribution Systems, Small Power & Lighting Systems, Earthing & Lightning Protection Systems, Fire Alarm/FM 200 Systems, Emergency Lighting & Central Battery Systems, BMS & ENMS. Data, CCTV & Security Access Control Systems, AV Systems, etc.
• Participating in site coordination, design and progress meetings
• Verifying site installation of MEP services as per Project specifications & international standards
• Looking after construction installation & field coordination and resolving problems arising during installation
• Interacting with:
o Contractors & consultants for carrying out specific engineering tasks o Procurement Department for the delivery of materials.
• Generating project progress, inspection schedule & pending activities reports and communicating directly with the management
• Ensuring that all information/drawings issued to Site Operatives as stamp Issued for Construction in proper manner and details produced follow approved project specification requirements.
HYUNDAI – ENGINEERNG AND CONSTRUCTION
National Museum of Qatar Project
Doha Qatar
October 10, 2012 to October 10, 2013
Position: Electrical Site Engineer
Duties and Responsibilities:
• Reviewed the contract drawings and revised the power single line diagram as per client requirements.
• Implemented the procedures related to the requirements of the contract documents and applicable codes
• Detailing of materials, correspondence and coordination with other groups in relation with the on-going and proposed projects
• Site supervising and implementation
• Monitored sub-contractor performance with respect to all aspect of electrical works and documentation records to ensure compliance with approved drawings, specification and quality system
MERALCO INDUSTRIAL ENGINEERING SERVICES CORPORATION Meralco South Design
Sta. Rosa, Laguna, Philippines
May 2012 to September 2013
Position: Electrical Engineer
Duties and Responsibilities:
• Conducts engineering field surveys for the private and government clients to check and verify the existing Meralco facilities and the needed design concepts
• Preparation of engineering design (i.e., designing transmission line in different voltages from 34.5kv -4.8kv) through Auto Cad and in accordance with MERALCO standards of designing.
• Preparation of engineering calculation such as voltage drop computation, sizes of wires, transformer, height and type of poles, insulators and other protective devices and instruments to be used and more engineering enhancements to produce a resolution necessary for the design
• Detailing of materials, correspondence and coordination with other groups in relation with the on-going and proposed projects
• Monitors progress and developments of projects through Work Order Management Systems (WOMS) and database.
• Coordinate hand-in-hand with Right-of-Way Staff with City/Municipal government officials, developers, DPWH and other government and private entities as regards with data requirements, right-of-way permits, and other pertinent information related to the design.
• Prepares Bill of Materials (BM) i.e., total project cost for every MERALCO application through Work Order Management System (WOMS).
SIEMENS INCORPORATED
500 MW San Lorenzo Combined Cycle Power Station
Alabang, Philippines
November 2009 to December 2011
Position: Site Engineer
Duties and Responsibilities:
• Responsible in the preparation of materials take-off based from the construction’s drawings.
• Monitor progress and supervise the installation of cable trays, fittings and supports for electrical lighting and small power project.
• Supervise cable pulling, cable dressing, loop checking, meggering, cable glanding and termination of electrical cables.
• Prepare work schedules and plans for electrical works in coordination with the Electrical Planning Department.
• Prepared and coordinated with clients regarding field action request and technical queries for clarification and information.
• Prepared field instruction requests to the clients and inspectors for the acceptance of various electrical works.
• Coordinated with clients regarding outstanding items for site installation and completion.
• Assisted in project commissioning.
SHIMIZU PHILIPPINE CONTRACTORS, INC.
Engineering & Construction Works
People’s Technology Center, Carmona, Cavite, Philippines April 2008 to June 2009
PROJECT ASSIGNED:
• New Rohm Apollo Semiconductor Philippines Inc. Factory (NRASPI Factory) Position: Project Site Engineer
Duties and Responsibilities:
• Responsible for the review of the electrical drawings submitted by the subcontractors for the purpose of construction
• Supervise and monitors the installation progress of the subcontractors
• Monitors and prepares project entity quotations (cost breakdown, summary and quotation cover); request of purchase (RP) for construction materials in and outside site premises and its equivalent invoice; the billing of quantity (BOQ) for the different entity project of NRASPI Factory; the local and international transmittal of specified work for the project
• Monitors the daily manpower of NRASPI Factory
• Take-charge of replenishing action for the revolving cash entitled to NRASPI Factory project
• Supervises the outgoing and incoming transaction of the project II. ON–THE–JOB TRAININGS
PHILIPPINE LONG DISTANCE TELEPHONE (PLDT)
June 2003 – October 2003
Site Address: PLDT Batangas Business Zone
Business Area, Bauan, Batangas
• Perform surveys for PLDT’s clients/ customers
• Perform jumper to provide/ enhance clients application for telephony
• Replacement of defective drop wires, CBK, and telephone units
• Reprogramming of telephone booth
• Provide assistance for customers’ inquiries
BABCOCK – HITACHI (PHILIPPINES) INC.
November 2003 – April 2004
Plant Address: San Roque, Bauan, Batangas
Operations Department – Maintenance Group
• Perform general plant maintenance works such as replacement of battery and oil for the plant generators, cleaning various mechanical machines and devices, dismantling of office’s air-conditioning units for maintenance purposes, painting steel brackets and supports, etc.
• Fabricate and weld several steel supports for plant’s structures and offices. SIEMENS POWER OPERATIONS, INC.
August 2004 – October 2004
Site Address: First Gas Power Plant
Santa Rita, Batangas City
Electrical Maintenance Department
• Perform general plant maintenance works such as replacement of defective and busted lamps for smokestacks, repairing CCTV system, inspection and troubleshooting of plant’s Transformers and generator brush gears, replacement of defective exhaust fans for motors, changing of bearings of generators, cable pulling, etc.
• Perform housekeeping for the workshops
• Perform technical documentation and filing of the maintenance department EE&R MARINE – INDUSTRIAL SERVICES
November 2004 – March 2005
Main Office Address: San Miguel, Bauan, Batangas
• Perform general electrical and mechanical maintenance works such as rewinding of motors, replacement of defective outlets, troubleshooting of electrical motors, repairing electrical wirings, dismantling parts of machines and air-conditioning units for maintenance purposes, cable pulling
• Perform housekeeping for the plant
III. SEMINARS ATTENDED
• Symposium in Pneumatics
Philippine Instrumentation and Controls Society
Batangas State University
Alangilan, Batangas City
October 8, 2003
• 9th Annual National Mega Seminar
7th Annual National Student Convention
Institute of Integrated Electrical Engineers of the Philippines, Inc. Council of Student Chapters
Technological Institute of the Philippines, Quiapo, Manila January 25 – 27, 2006
Energy Conservation
Distribution Management
Project Estimating & Costing
Introduction to Equipment & Maintenance
Transient Voltage & Grounding Solution
Overview of Philippine Grid & Distribution
PEC 1: Motor Circuits
Simplified Fault Calculation
• Power Plant Operation (Hydro – Electric Plant)
Binga Hydro-Electric Plant
Itogon, Benguet Mountain Province
February 25, 2006
IV. PERSONAL DETAILS
Date of Birth : May 26, 1985 Passport No. : EC5606670 Years of Age : 33 Date Issued : 06 October 2016
Civil Status : Married Valid Until : 05 October 2020 Nationality : Filipino Placed of Issue: PE Doha