|
Resume alert |
Resumes 21 - 30 of 1442 |
Al Farwaniyah, 80, Kuwait
... Eg: Query related to Job location/ Joining Bonus/ Project allocation/ Laptop allocation etc. 6) Post Joining: • Keep joiner’s tracker updated and inform the Recruitment Head SPOC about the Joiner sharing details, resumes and feedback forms to ...
- Feb 04
Qibla, Kuwait
... 4, Perform for installation of board fillings and sheet fillings along the river side at the bridge project or job site area Using a Liebherr crawler crane equipment Model:LR843HD, with using also a diesel hydraulic air and vibratory hammers for ...
- Jan 29
Qibla, 14, Kuwait
... NCPI (National Chemical & Petroleum Industries), for Joint Operation Project (KOC-JO), Wafra, Kuwait. Preparing daily chemical consumption reports, accountability report, manpower reports, etc. Administration works, Invoice preparation, Gate pass ...
- Jan 28
Qibla, 14, Kuwait
... (3/9/20008 to 2/12/2008) Professional/Social: Teamwork, Project- Management, Communication, Leadership, Organization, Problem-solving etc. Languages: Nepali( Native ), Hindi ( Advance), English (Intermediate) EDUCATION 2008 Diploma (12 passed) ...
- Jan 26
Qibla, 14, Kuwait
... Work with staff to project future needs for kitchen supplies, goods, and cleaning products. Maintain regular inventory of all needed supplies. Identify methods our restaurant can use to cut waste, decrease costs, and improve revenue. Manage the work ...
- Jan 23
Qibla, 14, Kuwait
... Dealing with emergencies, unplanned problems and repairs MAHARASHTRA BOILER & TUBING CORPORATION (GURGAON, HARYANA) PROJECT / SITE ENGINEER June 2011 - July 2012 Worked at M/S METAL FAB a unit of MAHARASHTRA BOILER & TUBING CORPORATION, progressed, ...
- Jan 15
Qibla, 14, Kuwait
... BNCC work is done by reputable, experienced Engineers, Craftsmen - Electricians, plumbers, carpenters - to complete project improvements or additions to make your Project just the way you want it. BNCC deputed me for the Project “Arabian Gulf ...
- Jan 14
Qibla, 14, Kuwait
... in Acid Stimulation Project as Oil & Gas Operations Researcher (Drilling/Production) from Mar 1st 2011 to Nov 30th 2012 keeping abreast of my duties as Drilling Operations Engineer. • Attended training abroad: “Drilling Mud Cake Damage Removal” (Lab ...
- Jan 13
Qibla, 14, Kuwait
... • Gathered required materials, selected appropriate methods and optimized assembly sequences to carry out project work. • • Performed test runs to assess quality of finished products. Inspected construction supplies, removing sub-standard material ...
- Jan 11
Qibla, Kuwait
... Develop and implement the project HSE MS, Review, evaluate, and analyze contractors/Subcontractors’ work environments and procedures to control, eliminate, and prevent injury, ill-health. Direct the preparation and timely issue of all HSE reports ...
- Jan 06