Resume alert |
Resumes 71 - 80 of 245 |
Visakhapatnam, Andhra Pradesh, 530026, India
... Completed project on Slag Treatment Plant, Converter Lubrication System includes the instrumentation and constructional power of shop floor includes Erection, Maintenances of power trunk, PSB, PDB. Complete rising of procurement and Service Purchase ...
- 2020 Nov 21
Visakhapatnam, Andhra Pradesh, India
... In addition to this I am also having experience in maintenance of 100 KWp PV-Wind Hybrid power plant which is installed on the roof top Gayatri Vidya Parishad College for Degree & PG Courses (A),Rushikonda, Visakhapatnam from 01/08/2014 to till date ...
- 2020 Nov 19
Visakhapatnam, Andhra Pradesh, India
... Blenders and Drier Machines EXPERIENTIAL LEARNING (SUMMER INTERNSHIP PROGRAM) Company Name : - Vizag Steel Plant (RINL). ... IT PROFICIENCY Auto CAD CATIA (learning) Microsoft Office Word, Microsoft Office Excel, Microsoft Office Power Point. ...
- 2020 Nov 18
Visakhapatnam, Andhra Pradesh, India
... quantity of plant process piping (almost-1100K”Ø, qty.=107500J) of UG-piping plus AG-piping (heavy wall CS, LTCS, SS, Inco-lay, Alloy steels). Total ‘8’ no’s Storage Tanks construction, Installation of vessels, equipment’s, steam generators, power ...
- 2020 Nov 16
Visakhapatnam, Andhra Pradesh, India
... Fourteen years of experience as a Site/Shift Engineer/Supervisor in large construction facilities and 2x150MW Power plant Operation & Maintenance with excellent understanding of statistics. Highly motivated professional and dedicated person with ...
- 2020 Nov 10
Visakhapatnam, Andhra Pradesh, India
... Having expertise in various plant processes which includes engineering design support, construction, formulation and ... Allocation of duration and resources or man power for that bustle depending on quantum of work. Monitoring and controlling ...
- 2020 Nov 08
Visakhapatnam, Andhra Pradesh, India
... Civil works like Piling and for TG building, boiler, coal handling plant, ash handling plant, raw water pipeline & reservoir, cooling tower, silos, pipe racks, etc. Total execution responsibility for 5MW, 30MW, 50MW and 22MW Solar power projects at ...
- 2020 Nov 06
Visakhapatnam, Andhra Pradesh, India
... and Distribution of Electrical systems Duration: 6 months NPTI (NATIONAL POWER TRAINING INISTIUTE) (1/8/2013-31/3/2014) Description :Power sector (worldwide) • Thermal power plant & Generation • Power Transmission Lines engineering, O&M • Live Line ...
- 2020 Oct 31
Visakhapatnam, Andhra Pradesh, India
... Co-Curricular Activities: ● Took part in plant training on ELECTRICAL OPERATIONS in NATIONAL THERMAL POWER PLANT from 14-11- 2018 to 21-11-2018. ● Participated in EMBEDDED SYSTEMS (Internet of Things) conducted by APSSDC held from 30-11-2017 to 02 ...
- 2020 Oct 26
Visakhapatnam, Andhra Pradesh, India
... Skills Systems knowledge: good & skilled in MS (word, excel), SAP, ORACLE, PMD, HSE & other plant related functions. ... Consists of: Repair or replace wiring equipment, or fixtures, using hand tools or power tools. Test electrical systems or ...
- 2020 Oct 25