PROFESSIONAL SYNOPSIS
Associated with JINDAL SOUTH WEST STEEL LIMITED (JSW), Karnataka (largest integrated steel plant) as Jr. Manager (E&I) in 4 MTPA SMS-1(BOF) Dept.
Handling Shift as Shift In charge and Expertise in Process Management, Cost Optimization, Trouble Shooting, Maintenance, relationship management and team management.
Hands on experience in Erection, Testing & Commissioning of Electrical equipments such as LT & HT Panels, LT & HT Motors up to 2.2MW, PLC (SIEMENS (S7-300 & 400, SCHNEIDER Modicon 340), SCADA WINCC, VIGEO CITECT & AC Drives (ABB, SIEMENS, AGE) in project.
Responsible for Permit to work, 5S implementation, safety work practises during isolation and also participating in various programmes for optimising power losses and consumption.
Looking after 5No.of Substations which includes LT & HT breakers of complete power system of Converter, CCP & cranes and minimising power losses during operation.
Proven competencies in analyzing the existing processes, evaluating the areas of improvements and accordingly implementing process modifications.
Hands on Experience with SAP on job training (SAP-MM,PM)
Worked with Electrosteel Steels Ltd., in Green field project of 2.2MTPA as Electrical Engineer (2x60Ton BOF & 5X2 Strand Billet Caster) in SMS.
Experienced in handling projects for Steel Industry.
PROFESSIONAL EXPERIENCE
COMPANY
DESIGNATION
PERIOD
JINDAL SOUTH WEST STEEL LIMITED (JSW), Karnataka
Largest Integrated Steel Plant (12 MTPA)
Jr.Manager
Dec 2014 to till date
ELECTROSTEEL STEELS LIMITED, Jharkhand
Green Field Integrated steel Project (2.2 MTPA).
Electrical Engineer
Sep’2011 to Dec’2014
MADHU CONSTRUCTIONS Pvt. Ltd, Visakhapatnam
Site Engineer
Jun’2010 to Sep’2011
PROFESSIONAL TRAINING ON SAP
Electrical Material Codification (creation, modification) & Maintenance in SAP on a regular Basis Maintaining of all technical information’s regarding the equipment’s as per make & model.
Creating (PR) Material Procurement, Service requisition for Project, Operation & Maintenance.
Undergoing training in SAP PM Module for Plant Maintenance in SAP.
JINDAL SOUTH WEST STEEL LIMITED (JSW):-
Experience in the field of Electrical Operation & maintenance in BOF dept., Steel making shop (SMS)
Working as Shift In charge looking after 3x135 Ton BOF Converter, 3 No’s of LHF, 3No’s OF HMDS unit & secondary steel system includes all AUTOMATION(SIEMENS, SCHNIDER ELECTRICS & ALLEN-BRADLEY), systems, AC (SIEMENS,ABB) & DC (NELCO,SCHNIDER) drives, LT & HT motors UPTO 2.2MW, switchgears, Ladle transfer cars, Sub lance system for auto sampling .
Handling 5No.of Substations and controlling power losses and attending breakdowns and shutdown works of LT, HT & Transformers upto 25MVA.
Monitoring & trouble shooting of Sub lance & lance system for oxygen blowing, calcium carbide injection, argon purging which includes encoders & limit switches for safety concern.
Minimizing the delay time & finding quick solution for problem solving or any alternate way to avoid sequence breakdown.
Mentoring/ guiding apprentice and juniors on various trouble shooting & maintenance matters and products to guide them towards successful outcomes and attainment of business objectives.
Proactively identifying areas of obstruction/breakdowns and take steps to rectify the equipments
Planning & implementing the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipments & machinery.
Maintaining of proper Documentations of Spares, damaged parts in shop floor and creating Service PR in SAP and follow up with vendors, and properly maintaining the equipment’s.
ELECTROSTEEL STEELS LIMITED (ESL):-
PROJECT NAME: 2X 60 TON BOF CONVERTER & 5X2 STRAND BILLET CASTERS:-
To prepare proper document of project scheduling & Purchase Requisition for material and services in SAP for Testing and Commissioning of various equipments involved in project.
Study of Detailed Electrical Project Drawings / Planning for lying of Cable Trays, Power and Control Cables/ testing of cables and their terminations.
Identification of necessary equipment’s for project including preparation of project schedule, required for execution and completion of project.
PROJECT HANDLED
Involved in Erection, Testing and commissioning of MCC/PCC/PLC panels of pump house and their cabling and responsible for day to day maintenance works, which are controlled by AGE drives and S7-400 PLC’s
E&A Project In charge of Converter, Mixer, Under Ground Bunker De dusting includes Erection & commissioning of MCC, PLC Panels, HT motors of 900KW, HT Cable laying, LT motors, JB’S, LCB, pulse valves, and carried out all electrical activities.
Erection, Testing, Commissioning of 60 ton converter areas such as BMCS, FACS, TILT Drives(AGE), and aux areas in converter.
Erection, Testing, Commissioning and Maintenance of Ladle Regenerative Pre-Heater Control Panel of 11 nos. which consists of multiple Electrical and Instrument accessories which are controlled by Siemens S7-200 PLC in SMS.
Completed project on Slag Treatment Plant, Converter Lubrication System includes the instrumentation and constructional power of shop floor includes Erection, Maintenances of power trunk, PSB, PDB.
Complete rising of procurement and Service Purchase Requisitions of line-2 Project for SMS with all proper technical documentation of the equipment’s.
Preparing of BOQ and to procure material as per site condition and coordinate with supplier.
Also Assistance in various Field Instrument used in this areas which includes CO Gas Detector, Thermocouple, RTD, Electromagnetic and Electro pneumatic valves, Flow Transmitters, Control Valves, Motorized Valves, Solenoid Valves, Ultra Sonic Level Transmitter and Ultra-Violent Sensors.
EDUCATIONAL QUALIFICATION:
DEGREE
NAME OF THE SCHOOL/COLLEGE
DURATION
B.Tech
Electrical & Electronics
Saint Theressa Institute of Engineering and Technology, Vizianagaram
2007-2010
Diploma
Electrical & Electronics
Thandra Paparaya Polytechnic, Bobbili
2003-2006
SSC
Sri Saraswathi Vidya Vihar School, Visakhapatnam
2002 – 2003
PROJECT WORKS:
Study project on 132/33kv substation at Bobbili.
Study project on Thermal Power Plant, Gas Expansion Turbine in Visakhapatnam steel plant.
Live project on Regenerative braking on 3 Phase induction motor
SOFTWARE SKILLS:
BASIC knowledge in MS Office / AutoCAD / Hardware
BASIC knowledge in SAP MM & PM
PERSONAL DETAILS
Name : RAJESH PALLA
Father Name : APPARAO PALLA
DOB : 06 June 1988
Sex : Male
Marital Status : Married
Nationality : Indian
Languages known : English, Hindi, Telugu.
Permanent Address : 7-16-63/1, Pallavari Veedhi, Old Gajuwaka
Visakhapatnam-530026.
DECLARATION
I hereby declare that the information given above is true to the best my knowledge.
Rajesh Palla