Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Visakhapatnam, Andhra Pradesh, India
Posted:
November 10, 2020

Contact this candidate

Resume:

CURRICULAM VITAE

R. SITARAMASOMARAJU

Phone: +91-984*******

: +91-790*******

Email: adhqeu@r.postjobfree.com

adhqeu@r.postjobfree.com

CAREER PROFILE:

Analytically-minded Quality professional with an advanced detail-focused approach to perform quality control inspections. Logically based approach to reading and interpreting blueprints and product specifications as well as testing and measurement of equipments and instruments. Fourteen years of experience as a Site/Shift Engineer/Supervisor in large construction facilities and 2x150MW Power plant Operation & Maintenance with excellent understanding of statistics.

Highly motivated professional and dedicated person with strong communication and leadership skills responds well under pressure with a proven ability to liaise in a confident and articulate manner at all levels.

PERSONAL DETAILS:

Father Name : R.PatteswaraRao

Date of Birth : 19th February 1984

Nationality : Indian

Religion : Hindu

Res Tel : 0091 984-***-****

Tel : 0091 790-***-****

E-Mail : adhqeu@r.postjobfree.com

Contact Address : #LIG-314

AUTONAGAR

BHPV POST

VISAKHAPATNAM-530012

INDIA.

PASSPORT DETAILS:

Passport No : S9279084

Place of Issue : VISKHAPATNAM

Date of Issue : 27.03.2019

Date of Expiry : 26.03.2029

EDUCATIONAL QUALIFICATIONS:

Bachelor of Technology in Electrical and Electronics Engineering with an aggregate of 55.32% from Jawaharlal Nehru Technological University, Hyderabad, Andhra Pradesh, India in the year 2010.

Diploma in Electrical and Electronics Engineering with an aggregate of 64% from State Board of Technical Education, Hyderabad, Andhra Pradesh, India in the year 2002.

Secondary School Certificate with an aggregate of 63% from Board of Secondary Education, Hyderabad, Andhra Pradesh, India in the year 1999.

KEY EXPERIENCE

Prioritize and plans work activities, plan for additional resources, organizes and schedules daily tasks, develops realistic plans and man power management, Billing.

Operation and Maintenance of Substations, Power Plant and Oil & Gas industries. Involved in various activities like Installation, Testing, Operation and Maintenance of various Electrical Equipment’s. And Man Power Management.

Experience in 6.6kV, 400V Switch Gear Operations and 330kV Switch Yard Operation With SCADA in 2x150MW Coal Fired Power Plant.

Experience in Thermal power plant, Execution of Electrical works in Plant Construction like Ear thing Rods Laying, Pump House, Buildings, and Sub Station Installation Works Etc. And Township Works like wiring, conduit laying and light, power fitting in large Buildings, Cable lying. Small substation Erection (i.e. 11/.440 kv) and ware house.

Experience in Installation, Testing and Commissioning in Construction & Electrical Periodic, Preventive and Breakdown Maintenance of Refinery Plant and Oil and Gas Plant. Tracking and consolidation information for engineering, construction, materials, reports preparation for projects heads and Clients.

Extensive experience in Operation and Maintenance of various Equipment’s used in 132/33KV Substation.

WORK EXPERIENCE:

Working as an SITE SUPERVISION (2x600 MW Power Plant) Electrical Maintenance in S.K. ENTERPRISES at Mooser Baer Power Plant (HINDUSTAN POWER) 2X600MW Thermal Power Plant Jaithri, Anuppur, Madhya Pradesh. From 16.04.2018 to Till the Date.

Worked as an ELECTRICAL ENGINEER (Operation & Maintenance) in SMECH ENGINEERING SERVICES ZAMBIA LIMITED. At MAAMBA COLLIERIES LIMITED, (2X150MW Coal Fired power plant) Maamba, Zambia From 27-03-2016 to 04.04.2018

Worked as an ELECTRICAL ENGINEER in ABIR INFRASTRUCTURE PVT. LTD. at East Coast Energy Private Limited, (2X660MW Thermal power plant) BTPP, Tekkali, A.P. From 01-07-2012 to 15-03-2016

Worked as an ELECTRICAL ENGINEER in ABIR INFRASTRUCTURE PVT. LTD. at NOCL CUDDLORE OIL REFINARY PROJECT, T.N. From 07-02-2011 to 30.06.2012

Worked as a DIPLOMA SHIFT in M/S G.B.R. CONSTRUCTIONS (‘A1’ Grade Electrical Contractor) at 132/33 KV SUBSTATION, A.P. TRANSCO, KASIMKOTA. From 01-09-2007 to 31.01.11.

Worked as a DIPLOMA SHIFT in M/S SAI ELECTRICALS (‘A1’ Grade Electrical Contractor) at 132/33 KV SUBSTATION, A.P. TRANSCO, KASIMKOTA. From 01-06-2005 to 31-08-2007.

Worked as a DIPLOMA SHIFT in M/S N.SURYANARAYANA (‘A1’ Grade Electrical Contractor) at 132/33 KV SUBSTATION, A.P. TRANSCO, and KASIM KOTA. From 10-02-2004 to 31-05-2005.

Worked as a DIPLOMA APPRENTICE TRAINEE in E.P.D.C .OF A.P LTD. at Nandigam Section, Tekkali Division. From 03-02-2003 to 03-02-2004.

Worked as SITE SUPERVISOR in M/S SRI DURGA METAL WORKS (HSL Contractor) at Visakhapatnam. From 19-07-2002 to 31-01-2003.

PROFESSIONALSKILLS:

Experience in Execution of Electrical works like wiring, conduit laying and light, power fitting in large Buildings, Switch Houses and ware house.

Installation and maintenance of complete Earthling system consisting of Earth Electrodes, Earth Inspection Pits, Earth cables and Measurement of Earth resistance.

330kV Switch Yard Operation with SCADA System and 6.6kV, 400V Switch Gear Operation in 2x150MW Power Plant.

Works within department budget, develops and implements cost saving measures, contributes to profit and revenue.

Possess basic knowledge of all power distribution system, lighting, fire detection, low current systems, controls and building Management system.

Study and review of all construction drawings and equipment data sheets, preparation of ITP, IMIR documents, coordinating with vendors and other disciplines/contractors/ subcontractors.

Preparing day to day job planning, execution & implementing preventive maintenance of all electrical equipments like transformers, circuit breakers, current transformers, potential transformers, auxiliary transformers, lightning arrestors, power factor correction capacitor banks.

Carrying out installation in substations of 132KV/33KV/11KV as per design data.( Transformers (oil/ dry), circuit breakers (SF6/VCB/ ACB), CT’s, PT’s, lightning arresters, Control panels, cable laying, Earthingsystem, capacitor banks.

Laying, testing, termination of control cables, lighting cables in cable trenches and cable trays.

Installation, Repair/Maintenance of indoor and outdoor Lighting fixtures.

Maintenance of UPS system consisting of UPS panels, Battery banks etc.

Attending to Breakdown maintenance & Preventive maintenance in Shifts.

Remains knowledgeable of safety policies and procedures and performs assigned duties in a safe manner, and while supervising others, has responsibility for their safety and ensures that they comply with established safety policies and procedures and practice safe work habits.

Minimizing/Reducing the Equipment Breakdown time and Recurrence of Breakdown through Breakdown Analysis.

Responsible for overall dept. activities in the absence of substation In Charge- Electrical.

COMPUTER SKILLS AND TRAINING:

Having good working knowledge of MS Word, Excel & Power Point.

Extra activities reading technical literature & computer literacy of internet research.

Certified to work on AutoCAD 2006.

COMMITMENT TO ORGANIZATION:

Given an opportunity I will be able to fit into the slot applied for the organization with excellent communication skills along with high motivation and exceptional leadership qualities. I will be able to achieve targets set with very ease and with profitability to the organization.

Awaiting your favourable response.

R.SITARAMA SOMARAJU



Contact this candidate