Name: NARAYANASETTI SURYA KUMAR

Ph. No.: +919*********

Current Location: Visakhapatnam

Email: *************@*****.***

PERSONAL STATEMENT:

Seeking a challenging position in a progressive organization that can give me the right exposure to exploit my potential and capabilities to the fullest, whereby I could contribute my talent not only for gaining work satisfaction but also procuring the growth of the company. PROFISSIONAL EXPERIENCE:I have 7 years experience in Construction & Project handling of Substation & transmission lines on site and also experience in LPG bottling plant. SRUJANA ENGINEERING

WORKS

(1/6/2012-31/7/2013)

Project name: 33/11KV Substation construction

Procedure: Installation and commissioning of equipments in substation Duration: 6 months

Customer: APTRANSCO

Team size : 100

Role : Daily planning for work,Site handling

Project name: 220KV Transmission towers Construction Procedure: Installation and commissioning of new tower lines Duration: 6months

Team size : 120

Role : Daily planning for work,Site handling

Training: Operation and Maintenance of Transmission and Distribution of Electrical systems

Duration: 6 months

NPTI (NATIONAL

POWER TRAINING

INISTIUTE)

(1/8/2013-31/3/2014)

Description :Power sector (worldwide)

• Thermal power plant & Generation

• Power Transmission Lines engineering, O&M

• Live Line Maintenance

• Substation Planning & Engineering

• Load Dispatch & Grid management

• Communications

• Power Distribution

• Distribution Metering

• Energy Audit

• Power System Planning

• High Voltage Testing

• HVDC

• Simulator

• Smart Grid

• Distribution Automation

Curriculum Vitae

RAMELEX PVTLTD

(10/9/2014-31/01/2016)

Project name: 220KV/132KV Substation maintenance

Duration:4 months

Customer: MSETCL

ROLE : Tender searching,Project planning . project execution on site, Site handling,Bill follow up

Project name: 400kv New tower installation & commisioning Duration:4 months

Customer : POWER GRID

ROLE : Tender searching,Project planning, project execution on site, Site handling,Bill follow up

Project name: Cold line washing for 220/400KV tower lines and substation equipments

Duration:2 months

Customer : MSETCL

ROLE : Tender searching,Project planning,project execution on site, Site handling

Project name: 400kv substaion consturuction and maintenance Duration:8 months

Customer: POWER GRID VIZAG

ROLE : Tender searching,Project planning, project execution on site, Site handling,Bill follow up

Project name: Puncher Insulator and detection test for 220/400KV HT LINES Duration:1 month

Customer : TATA POWER

ROLE : Tender searching,Project planning, project execution on site, Site handling,Bill follow up

Project name: Hot line washing of 400kv transmission line Duration: 1 month

Customer : JSW POWER

ROLE : Tender searching,Project planning, project execution on site, Site handling,Bill follow up

ROLE : Operation & maintenance of LPG bottling plant RESPONSIBILITIES :

Planning, execution, installation, testing and commission of electrical and mechanical machinery

O & M of diesel generator (250 KVA, 500 KVA) set with AMF panel and plant lightening

Hindustan

Petroleum

Corporation

O & M of transformer ( 11 KV / 400 V )

Maintenance checking of VCB breakers, MCC panel, HT/LT motors, HT/LT cables Drive units, pump, and diesel engines.

Limited

LPG BOTTLING

Capable of leading the electrical maintenance team and implementing the maintenance strategy for the plant

PLANT

(Through Aaravi encon

pvt ltd )

Condition monitoring and predictive maintenance of critical equipment and corrective action to avoid break down

(10/2/2016-present) Planning for resources and man power for planned shutdown of the plant and execution including start up and Daily power monitoring, calculations, and reporting monthly basis.

Coordination with consultant for the tendering and finalization of the contract for electrical and mechanical systems

Conducting safety audits with in the departments and ensuring the complaints from all the employees and workers and updating the checklist and audit reports ACADEMIC PROJECTS

P.G Project

Title : Distribution automation

Objective: to study the extension of intelligent control over electrical power grid functions to the distribution level and beyond.

Tools Used: Microsoft PowerPoint, Microsoft word

Benefits to the company/society: Decreased overhead costs, increase in productivity, consistency, reliability and accuracy, high volume production, increase in safety

B.TECH Project

Title: Control of non-linear systems using fuzzy-PID controller. Objective: This project presents the comparison of tracking performance of fuzzy PI and fuzzy PD controllers with conventional PI and conventional PD controllers. Scope: We simulated the circuit for parallel combination of fuzzy PI-PD controllers and conventional PI-PD controllers and the results demonstrate that parallel combination of fuzzy PI-PD controller is much better than conventional PI-PD controller.

Tools Used: MATLAB r2010

Benefits to the company/society: Fuzzy controllers can be used instead of conventional PID controllers as they provide cost effective and better responses compared to conventional PID controllers.

KEY

SKILLS

E1- Beginner, E2 – Intermediate, E3 - Expert,E4 – Master 1

PLANING,PROJECT EXECUTION,PROJECT

MANAGEMENT

E3

2

THERMOSCANNING SUBSTATION

MAINTENANCE

E3

3 TOWER LINE MAINTENANCE E3

4 TRANSMISSION LINE SURVEY,SITE HANDLING E3

5 STRING REPLACEMENT FOR EHV LINES E3

6 CABLE TERMINATION E2

7 THERMOSCANNING E2

8 CRIMPING, ERRECTION E2

9 CORONA DETECTION E2

10 TESTING OF ELECTRICAL EQUIPMENTS E2

11 HOT AND COLD LINE WASHING E3

12 Microsoft excel E3

13 Microsoft outlook, PowerPoint, Word E3

EDUCATIONAL QUALIFICATIONS

Examination Board/University

Year of

Passing

%

PGDC NATIONAL POWER TRAINING INSTITUTE 2014 76.73

B.E. (E.E.E)

JAWAHARLAL NEHRU TECHNOLOGICAL

UNIVERSITY,KAKINADA

2012

71.65

12th IPE-ANDHRA PRADESH 2008 91.9

10th SSC 2006 81.06

EXTRA-CURRICULAR ACTIVITIES, AWARDS AND MEMBERSHIPS

• Bagged Second Prize for a presentation on “ELECTRIC CARS “in KIET TECH FEST-2k10.

• Secured First Prize for a presentation on “Smart Grid” in Resonance-2k12 held at BVC Engineering College..

• National level tech fest act as a leader in our department activities. PERSONAL DETAILS

Name : SURYA KUMAR NARAYANASETTI

Date of Birth : 10-06-1991

Sex : Male

Nationality : Indian

Languages Known : English, Hindi and Telugu.

Permanent Address : Urlam (village post), narasannapeta (mandalam), Srikakulam (District), Andhra Pradesh -532425

PASSPORT DETAILS

Passport number : P1723548

Place of issue : Visakhapatnam

Date of issue : 13/10/2016

Date of expiry : 12/10 /2026

Place: Visakhapatnam Signature of the applicant

Date: (N.SURYA KUMAR)