|
Resume alert |
Resumes 91 - 100 of 117 |
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
... Engineer Specialization / Client : Nur Power Plant Client Industry / Project : Demineralization Water Storage Tank Duration : Jan 2015 – Jun 2015 Work Description: 1. Daily Activities * Attendance briefing for work info, HSE update info and ...
- 2016 Oct 05
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
... Road works, infra, utilities i.e water (300mm-900mm dia.), sewer (300mm-900mm dia.), telecommunication, power cable (LV-33kv ... Design and Build of 100,000 PE Module 1 Sewerage Treatment Plant (STP) in Senai Airport City, Senai, Johor Bahru, Johor.(RM ...
- 2016 Sep 14
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
... The project is about to construct a 1000MW coal fired power plant (Janamanjung 5) by Daelim Korea for Tenaga Nasional Berhad. It is the fifth power plant in Stesen Janakuasa Sultan Azlan Shah after Janamanjung 4. On-site machining job that have been ...
- 2016 Jun 25
Shah Alam, Selangor, Malaysia
... - Prepare calculation and report for Airconditioning in a new Control Room base on Temperature at plant, room area, person in room, heat of each equipment inside room and all others related basis to get suitable Horse Power of New Air-conditioning ...
- 2016 Jun 20
Petaling Jaya, Selangor, Malaysia
... purchasing-payables, sales & receivables, treasury, property, plant & equipment and payroll cycles to ensure accuracy, ... Skills Advanced Microsoft Excel, Microsoft Word, Microsoft Power Point, Typing, UBS Accounting System, MYOB Accounting ...
- 2016 Jun 08
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
... Alstom Power Asia Pacific Sdn Bhd Position : Department Secretary Specialisation : Secretarial Industry : Consulting (engineering & power plant) Date Joined : Feb 99 Date Left : Mar 02 Reason for Leaving : Dad was in hospital and needed to be taken ...
- 2016 May 05
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
... Optical power meters, Oscilloscope, Spectrum analyzer, Logic analyzer, Signal & Pattern generators, Multimeters & LC meters. ... to end product development from components level to Product assembly to product testing & Product shipment from the plant. ...
- 2016 May 04
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
... Head Riser Platforms and Central Processing Plant Platforms for all Static Equipment using RBI software known as Galiom. ... Good in using Microsoft Office, Microsoft Excel and Microsoft Power Point. REFERENCES John Steward Nadarajan Position : ...
- 2016 May 03
Batu Caves, Selangor, Malaysia
... March 2006 –August 2007 Buyer for Project Name: Powertron Teluk Salut Power Station 190 MW Combined Cycle Conversion Project ... Good Received Note to record and tabulate on all material/plant/equipment back charges to ensure that payment to suppliers ...
- 2016 Feb 06
Selangor, Malaysia
... Kimanis 300mw, Sabah) Lead QA/QC Engineer (Site Consultancy) Responsibilities and achievements: •Key role in monitoring a power plant in Kimanis 300 MW/combined cycle heat and power generation as consultant for Owner Kimanis power Sdn Bhd (KPSB) a ...
- 2016 Feb 05