RESUME
PERSONAL INFORMATION
Full name : MUHAMMAD AL-ZULFIKAR BIN MUHAMMAD AL-AMIN
Ic no. : 931***-**-**** D.O.B. : 01/11/1993
Gender : Male Marital status : Single
E-mail : ***********@*****.*** No. (HP) : 011-**-***-***
Address : NO. 28, LORONG IM 15/30,
BANDAR INDERA MAHKOTA,
25200 KUANTAN,
PAHANG.
EDUCATION
2006 – 2010 Sijil Pelajaran Malaysia (S.M.K. Tok Sera)
• Obtained distinction in Mathematics, Malay Language, Agriculture Science, Visual Arts Education, Islam Education.
WORK EXPERIENCE
PFCE Engineering Sdn. Bhd .
Project involved:
Paka GPP3 Project (July 2012 – Dec 2012)
- As a Semi Skill Worker and also as a Gas Detector.
Newwin Engineering (M) Sdn. Bhd.
Project involved:
BASF Chemicals Petronas, Gebeng (Shutdown) (Jan 2013 – Mar 2013)
- As a Helper for welder.
MTBE, Gebeng (Project) (Sep 2013 – Dec 2013 & July 2014 – Aug 2014)
- As a Defector in a Defect Team.
BASF Chemicals Petronas, Gebeng (Shutdown) (Mar 2014 – May 2014 & Mar 2015 – May 2015)
- As a Fire Watcher.
RWNA Engineering Sdn. Bhd.
Machinist & Technician (Dec 2012 – Present)
On-site machining work at several projects and shutdowns. As a machinist for 3 years, I have been involved in three type field of work, which is:
* Split Frame Cold Cutting Machine (from 2" to 72" pipe)
* Resurface Flange Facing Machine (from 1" to 72" flange or valve)
* High Torque Wrench (HTW)
* High Bolt Tensioning (HBT)
Project involved:
1) Air Product Project, Tanjung Langsat.( Dec 2012 – Jan 2013 )
* To perform Circumferential Cold Cutting and Bevelling using Split Frame Machine (from 16” to 32”)
2) Shutdown Optimal, Paka. ( Mar 2013 – May 2013 )
* To perform High Torque Wrench(HTW) from size (40” to 110)
* To perform Resurface Flange Facing from (10” to 48”)
3) TCOT Project, Paka ( Feb 2014 – Mar 2014 )
* To perform Circumferential Cold Cutting Bevelling using Split Frame Machine (24” to 32”)
4) Eversendai Lumut Project, Lumut. (Aug 2014 – Sept 2014)
* To perform Circumferential Cold Cutting,Bevelling & Tapper 30 Degree for Welding Preparation using Split Frame Machine (from 16” to 24”)
5) Polyplastic Project. ( May 2015)
* To perform Resurface Flange Facing from size ( 1” to 4”)
6) Dynac Project, Pasir Gudang. ( May 2015 – May 2015)
* To perform Resurface Flange Facing size (20” to 24”)
7) Petra Project, Shah Alam. ( May 2015 – May 2015 )
* To perform High Torque Wrench(HTW) size 110” Flange 12 Join
8) Carimin Project, Kemaman. ( June 2015 – June 2015 )
* To perform Circumferential Cold Cutting,Bevelling & Tapper 30” Degree using Split Frame Machine size 24”
9) Petra Project,Shah Alam. (June – June 2015 )
* To perform High Torque Wrench(HTW) size 110mm Flange 12 Join
The fact Assistant Project Engineer ( 20 June 2015 – 17 June 2016 ))
RWNA Engineering Sdn. Bhd. (Lumut Branch)
No.9, PT 344316, Jalan Acheh B, Taman Acheh Bestari, Kampung Acheh, 32000 Setiawan, Perak
As an assistant for Project Engineer, I have been involved in both office and site work such as documentations work (office), machining job to assist engineers and technicians and also dealing with clients (site).
Project involved:
Wheatstone Project (June 2015 – 13 June 2016 )
On-site machining work at Sapura Kencana Petroleum Lumut, Perak. The project is about to construct oil and gas plants for Bechtel Australia which is under Chevron Australia. On-site machining job that have been involved:
*Circumferential Cold Cutting & Beveling for Welding Preparation using Split Frame Machine (from 1" to 72" pipe)
*Resurface Flange Facing using Flange Facing Machine (from 1" to 72" flange/valve/spacer)
Fast Track 3A Project,TNB Jana Manjung 5 (Dec 2015 – Febuary 2016)
On-site machining work at Stesen Janakuasa Sultan Azlan Shah, Manjung Perak. The project is about to construct a 1000MW coal fired power plant (Janamanjung 5) by Daelim Korea for Tenaga Nasional Berhad. It is the fifth power plant in Stesen Janakuasa Sultan Azlan Shah after Janamanjung 4. On-site machining job that have been involved:
*Circumferential Cold Cutting & J-Beveling with Internal Tapper for Welding Preparation using Split Frame Machine with Bridgeslide (from 1" to 20" pipe)
Shutdown TNB Jana Manjung 4 (Feb 2016 – April 2016 )
On-site machining work at TNB Jana Manjung 4, Stesen Janakuasa Sultan Azlan Shah, Manjung Perak. The period of the shutdown is one month. On-site machining job that have been involved:
* Circumferential Cold Cutting & 3 Steps of Internal Beveling for Header Weld Socket Surface Preparation using Split Frame Machine and Drilling Machine (1 " pipe)
* Resurface Flange Facing using Split Frame Machine with Bridgeslide (16" & 18" Flange)
* Drilling and Rethreading holes inside Bowl Mill using Drilling Machine (total of 90 holes
Project TNB Jana Manjung 5 (April 2016 – 17 June 2016)
On-site machining work at TNB Jana Manjung 5,Stesen Janakuasa Sultan Azlan Shah,Manjung Perak. To perform Cold Cutting,Bevelling & Internal Tapper services.
*Circumferential Cold Cutting,Bevelling & Internal Tapper 30 Degree for Welding Preparation using Split Frame Machine (from 16” to 20”)
Project Petra Fabricator Sdn Bhd ( 21 June –Present )
On-site machining work at Petra Fabricator Sdn Bhd Syeksyen 15 Shah Alam Selangor. To perform High Torque Wrench (HTW),High Bolt Tensioning (HBT) and Flange Facing
* High Torque Wrech (HTW) size 105mm & 115mm
* High Bolting Tensioning (HBT) size 115mm
* Resurface Flange Facing size 4” using Machine 300e
SKILLS / STRENGTH
• Responsible, good leadership and a good team player.
• Can work full-time, if necessary.
• Able to work independently and under tight schedule.
• Excellent interpersonal and communication skills.
• Can operate all machine for Cold Cutting,Flange Facing & HighTorque Wrench (HTW)
OTHER INFORMATION
Langugages (Spoken/Writing) : Fluent in Malay and English
REFERENCES
YOGESWARAN A/L RASIAH
Senior Service Development Engineer,
Lumut Branch.
No.9, PT 344316, Jalan Acheh B, Taman Acheh Bestari, Kampung Acheh, 32000 Setiawan, Perak.
Phone No: 016-*******
Office No: 05-6642575