Post Job Free

Resume

Sign in

Piping Engineer

Location:
Shah Alam, Selangor, Malaysia
Posted:
June 20, 2016

Contact this candidate

Resume:

PERSONAL DETAILS

NAME : WAN AHMAD WAZIR AFANDY

BIN MOHD SANI

ADDRESS : NO 11 TAMAN ATIKAH,

BATU RAKIT,

***** ***** **********,

TERENGGANU DARUL IMAN.

PHONE : 019-*******

Date of birth : 19 November 1983 Sex : Male

Nationality : Malaysian Race : Malay

Marital status : Married Religion : Islam

Height/Weight : 1.65 m/ 58 kg Age : 33 years old

E-mail : acvbra@r.postjobfree.com IC. Number : 831***-**-**** BSP B/CODE : A53824 BRUNEI IC : 51-290496

BOSET CERT : M-BR324332/14 LINKEDIN : Wazir Afandy EDUCATIONAL BACKGROUND

Highest Education

Level : Bachelor’s Degree

Field of study : Mechanical Engineering

Major : Manufacturing and Production

University : University Tun Hussien Onn Malaysia Graduate Date : 2007 (March) Second Highest Education

Level : Executive Diploma

Field of study : Piping Engineering for Processing Plant Major : Oil & Gas (Petroleum)

University : University Tun Hussien Onn Malaysia (UTHM) collaborate with Octagon Petroleum Technology Sdn Bhd.

Graduate Date : 2007 (Sept)

Key Courses : Petroleum Engineering, Piping and Plant layout development, Petroleum Facilities, Quality, Health, Safety & Environment (QHSE), project management and asset management.

Coursework

2006 Bachelor Degree’s Final Year Project

“Improve The Structure of Existing Scissor Jack” (Used DFMA Method) 2007 Executive Diploma Final Project

1. Petaling Gas Field Development Project (conceptual Design) 2. Biodiesel Plant for UTHM Project

Experiences

Company Name : ARMADA TPCE SDN. BHD

Position Title : SENIOR PIPING ENGINEER / PMT

Position Level : Executive

Industry : Engineering / Design / FSO

Duration : 2015 - Present

Company Name : INTERNATIONAL OIL DESIGN & CONSTRUCTION (IODC) Position Title : LEAD MECHANICAL & PIPING ENGINEER Position Level : Executive

Industry : Engineering / Design / Refinery

Duration : 2015 - 2015

Company Name : HALLIBURTON BAYAN PETROLEUM SDN. BHD. (HBP) Position Title : MECHANICAL & PIPING ENGINEER (PMT) Position Level : Executive

Industry : Operator (Partnership with Petronas) / EPCIC / Wellhead-Infill Duration : 2014 - 2015

Company Name : LABUAN SHIPYARD ENGINEERING SDN. BHD. Position Title : PIPING ENGINEER / PDMS ADMINISTRATOR / PMT Position Level : Executive

Industry : Engineering / Fabrication / Platform / Jacket Duration : 2013 - 2014

Company Name : PUSB ENGINEERING SDN. BHD.

Position Title : PIPING ENGINEER

Position Level : Executive

Industry : Engineering / Design / Refinary / Platform / Chemical Plant Duration : 2011 - 2013

Company Name : RNZ INTEGRATED (M) SDN. BHD. (KLHO & MDO) Position Title : PIPING ENGINEER / PDMS DESIGN ENGINEER Position Level : Executive

Industry : Engineering / Design / Offshore Platform Duration : 2007 - 2011

Experience summary : - Involved in engineering construction, hook-up & commissioning.

- Involved in engineering design, project execution and procurement.

- Involved in various stages of design such as Conceptual, FEED, Detailed Design, Independent Design Assessment for Green Fields and Brown Fields.

- Familiar with a range of proprietary software including PDMS and AutoCAD, AutoPlan and familiar with relevant international codes and standards including ASME, ANSI, and API.

Professional Affiliation : Board of Engineer Malaysia (reg. no. : 56150A) ARMADA TPCE PROJECT INVOLVEMENT

No Project Responsibilities

1 PROVISION OF DETAILED

ENGINEERING DESIGN

FOR AN FSO FACILITY

FOR FULL FIELD

DEVELOPMENT FFD.

(HESS-E.A.Technique)

- Prepare Specialty Item Datasheet.

- Prepare Specialty item Specification.

- Checker for Manual Valve Datasheet.

- Checker for Valve Specification.

- Checker for Piping Specification.

- Checker for Piping Isometric (Upper Deck, Engine Room & Pump Room).

- Checker & reviewer for PDMS Design for the whole FSO.

- Project Management Support (PMS) at MMHE Yard

during demolition works.

IODC PROJECT INVOLVEMENT

No Project Responsibilities

1 ABADAN REFINERY

UPGRADING PROJECT

(NATIONAL IRAN OIL &

GAS COMPANY-NIOEC)

-Study Iranian Petroleum Standard (IPS), NIOEC Standard & Project Standard to familiarize and implement in a project.

-Prepare Piping Deliverable such as Line List, Critical Line List, Material Take-Off & Plot Plan.

-Prepare Mechanical deliverable such as, Engineering Drawing, Datasheet, Specification & Requisition,

-Coordinate designer & drafter to align work progress and work quality.

-Review & comment 3D model & drawing prepared by

Designer before issue to client.

-Interface with other department (Process, Electrical & Instrument) to minimize all technical issue.

HBP PROJECT INVOLVEMENT

No Project Responsibilities

1 BAYAN DECK EXTENSION

& INFILL PROJECT

(PCSB & HBP.)

-Study Project General Instruction, Exhibit & Project Guide.

-Interface with EPCIC Contractor, Petronas SKO team, PCSB Operation Team, PCSB Line Department Team, Halliburton Drilling Team, Halliburton Production Enhancement Team, Rig Contractor (NAGA4), Mech/Piping Vendor & Current Modification Contractor to ensure all work has well plan.

-Review & Verify EPCIC document such as Isometric Drawing, Mechanical Layout Drawing, Mech/Piping Drawing,

Mech/Piping Report, Mech/Piping Datasheet, Mech/Piping Specification, Vendor Drawing, Vendor Data, Purchase Order, Workpack, Jobcard, Test Packages & etc.

-Conduct PDMS Review to Halliburton Top Management.

-Coordinate Mechanical / Piping Engineering Drawing & Document Deliverable.

-Coordinate Mechanical / Piping Procurement Document Deliverable.

-Coordinate Mechanical / Piping Construction, Hook-Up & Commissioning.

-Involve in HAZID, HAZOP, PDMS Review & LDR

Review.

-Involve in Construction Risk Assessment (CRA).

-Involve in SIPROD & SIMOPS preparation.

-Involve in SITCOM discussion.

- Project Management Support Team at Tebrau Yard.

LSE PROJECT INVOLVEMENT

No Project Responsibilities

1 PERMAS DEVELOPMENT

PROJECT

(MURPHY OIL CORP.)

- Organized meeting with related consultant who prepared a PDMS design.

- Transfer PDMS raw file into our server.

- Setup PDMS Admin menu to create access for our PDMS operator. Then setup each personal computer to make sure they can access a file.

- Dealing with AVEVA for any enquiries and related licence.

- Produce Isometric Drawing, Plot Plan Drawing, Pipe Support Detail Drawing, Pipe Support Arrangement Drawing,

Electrical & Instrument Cable Ladder Drawing and etc.

- Re design in PDMS for any changes.

- Prepared PDMS Review File and Conduct PDMS review meeting.

- Prepared Piping List, Spool & Joint List, Ship loose Item List, Material Take Off, Workpack List, Hydrotest List, Hydrotest Check Sheet, Punch list and etc.

- Prepared Hydrotest Package.

- prepared all Hydrotest material & equipment list for offshore usage.

- Involve in lifting plan and procedure.

- Attend Jacket Top Panel Lifting.

- Monitor Bouyancy Tank Fabricate & Lifting.

- Monitor Mud Mat Preparation and installation.

- Attend Jacket Load Out onto Barge.

- Attend Crane installation on Cellar Deck.

- Prepared all Piping List & MTO for Hook-Up work.

- Prepared all Piping Work including segregated spool, Pipe support and Open Tray.

- prepared Job Card & Test pack for piping work at offshore.

- Monitor / supervise lifting work for all piping equipment & material from LSE yard onto working barge & from working barge onto Permas Platform.

- Monitor /supervise all piping work include pipe support on Permas Platform from installation until testing.

- Prepared & conduct related testing for piping. Including Hydrotest, Leak Test, Flood Test, Flushing & Blowing.

- Prepared all commissioning document related to piping. Include Commissioning Test Procedure (CTP), Test Package, Inspection Test Report (ITR), Mechanical Completion Certificate (MCC), Construction Completion Certificate(CCC)

& System Handover (SH).

PUSB PROJECT INVOLVEMENT

No

1

Project

PROVISION FOR

CONSTRUCTION

WORKPACK ASSISTANCE

(SKS WOOD)

Responsibilities

- Prepare a Sketch, Isometric, Spading, Isolation Limit, Material Take-Off, Assmbly List and Torquing as per Client request base on Anomaly Report..

- Prepare drawing using AUTOCAD & AUTOPLAN

software.

2 AS-BUILT PROJECT

DRAWING (BRUNEI SHELL

PETROLEUM)

- Check & Incorporate PDMS as per latest isometric & latest P&ID from PUSB Brunei.

- Prepare site visit report.

- Register all status of each drawing in deliverables.

- Generate Isometric drawing from PDMS software.

- Checker for each drawing before issue to IDC.

3 BLNG EVACUATION PLAN-

FIRE FIGHTING & SAFETY

EQUIPMENT LAYOUT

(BRUNEI SHELL

PETROLEUM)

- Take full responsible to prepared site visit report, review drawing and checking drawing before sign-off.

- Study and apply Work instruction for “AUTOCAD

Engineering Design Office”, “Drawing Management

System” and “Standard on Fire Safety Symbols”.

4 NGCP-TRA1/2/3 SUCTION

FILTER IMPROVEMENT

PROJECT (NATURAL GAS

CORPORATION PLANT)

- Take responsible to handle the project from site visit until AFC package.

- Prepare Scope Of Work, Isometric, Tie-in Schedule, Bulk Mto, GA Drawings, Insulation list, Pipe Support Detail and Drawing list using Vendor datasheet, Vendor Drawing and input from Site Visit findings.

- Interface with other department to solve any issue and directly discuss with client and vendor for the same purpose. 5 SCHEDULE TURN-AROUND

(STA) 2013-(BRUNEI

METHANOL COMPANY

(BMC) )

- Perform site visit to survey the equipment condition, check access to the equipment, a scaffolding space, lifting method, and take a picture for referance.

- Prepare site visit report and workpack to the client.

- 2nd phase for this project is to make a replacement or adjustment at certain area in plan to improve plant process based on comment from Plant workers.

- Make a 2nd site visit to review a situation and try to solve the problem. Process Requirement, no “pocket” allow in pipe routing.

6 LAYOUT OF FIRE WATER

PIPING SYSTEMS &

LOCATION OF HYDRANT

(BRUNEI LIQUID & GAS-

BLNG SDN BHD)

- Calculate maximum range of Hydrant base on system pressure, line size and flow rate.

- Determine the suitable location of hydrant to make sure it will cover maximum area base on maximum range.

- Take full responsible to prepare site visit report, review drawing and check drawing before sign-off.

7

SCOT REJUVENATION

PHASE III: TANK

BLANKETING PROJECT.

(BRUNEI SHELL BERHAD)

- Take responsibality to prepared site visit report, Plot Plan and drawing request.

- Ascertain the availability of spare nozzles on all the identified tanks intended for tank blanketing gas service as stipulated in the project scope of work ;

- Locate suitable location of pressure reducing station

(PRS) required for the tank blanketing gas service ;

- Establish preliminary route of fuel gas header that supplies gas for tank blanketing service to enable process Design (hydraulic) to take place.

- Prepared Material Requisition of Strainer and Relief Valve.

- Report progress status to Brunei Office and prepared Comment Response Sheet.

- Involve in HAZOP Workshop/Meeting.

- Arrange 2nd site visit to meet new client requirement, “No hot work during installation work”. So we find out location for pipe support n pipe routing to avoid hot work and use Lindapter type Support.

8 MAHARAJA LELA SOUTH

PROJECT

(TOTAL E&P BORNEO)

- Assist PDMS team in Kuala Belait (Head Office).

- Complete all Mechanical and Piping works using PDMS design.

- Convert all PDMS Design into 2D Draft.

- Prepare & Issue Isometric, Piping Plan & Equipment Layout using PDMS and Autocad.

9 DETAIL DESIGN OF

REPLACEMENT LEVEL

GUAGE (BRUNEI LIQUID &

GAS-BLNG SDN BHD)

- Take responsible to handle the project from site visit until AFC package.

- Prepare Scope Of Work, Isometric, Tie-in Schedule, Bulk Mto, GA Drawings, Insulation list, Pipe Support Detail and Drawing list using Vendor datasheet, Vendor Drawing and input from Site Visit findings.

- Prepare Material Requisition (MR) and Datasheet for missing Level Gauge.

- Work with other department to solve any issue and directly discuss with client and vendor for the same purpose. 10 CONTROL VALVE &

RELIEF VALVE

ENGINEERING AND

DETAIL DESIGN

(BRUNEI LIQUID & GAS-

BLNG SDN BHD)

- Take responsible to handle this project from site visit until AFC package.

- Prepare Valve list using Vendor datasheet, Vendor Drawing and input from Site Visit findings.

- Prepare Scope Of Work, Isometric, Tie-in Schedule, Bulk Mto, GA Drawings, Insulation list, Pipe Support Detail and Drawing list.

- Interface with other department to solve any issue and discuss with client and vendor for the same purpose. 11 SCOT AS-BUILT PACKAGE

2 & 3

(SERIA CRUDE OIL

TERMINAL-SCOT)

- Assign as Project engineer. Update weekly progress report

& monthly manhours report.

- Handling Mech/Piping Department, Electrical Dept. and C&A Dept.

12 BMC STA 2013 SCOPE- CIN

WORKPACK

PREPARATION AND SUMP

PUMP DETAIL DESIGN.

(BRUNEI METHANOL

COMPANY (BMC) )

- Prepare site visit checklist and site visit report.

- Prepare sketch drawing of isometric and pipe support based on site visit input and guide Drafter to CAD it.

- Responsible to determine pipe routing, pipe support Location and Elevation base on P&ID and client requirement.

- Prepare Material Requisition (MR) and Datasheet to purchase Sump Pump base on current recommendation.

13 CONSULTANCY,

ENGINEERING, DESIGN

AND WORK SUPERVISION

FOR PLANT 1 JETTY

REINSTATEMENT

(PETRONAS CHEMICALS

LABUAN)

- Prepare Site visit Checklist for Mechanical / piping site visit team.

- Prepare Pipe stress analysis calculation and report for pipe to determine pipe support location along the jetty.

- Prepare stress analysis calculation and report for vertical gas separator Pressure vessel to make sure a saddle still good enough to support a vessel during Hydrotesting.

- Prepare stress analysis calculation and report for Horizontal Drain Pot Pressure Vessel to make sure a saddle still strong enough to support a vessel during Hydrotesting.

- Prepare calculation, drawing and report of new Foam Fire Monitor using Projectile Motion Theory. The result from calculation are used to determine a suitable location of new Foam Fire Monitor to cover Equipment on Jetty and Manifold on Tank Ship.

- Prepare calculation and report for Airconditioning in a new Control Room base on Temperature at plant, room area, person in room, heat of each equipment inside room and all others related basis to get suitable Horse Power of New Air-conditioning system.

RNZ PROJECT INVOLVEMENT

No Project Responsibilities

1 CPOC (MDA, JKA, MDB,

MDC)

- EPCC For WHP Jacket And

Deck, QP, Jacket Pre-

commissioning and

Commissioning.

- Incorporate client’s comments on piping’s isometric and Pipe support detail. Organize all the deliverables and make sure it is tally with the design data and PDMS model.

- Produce piping isometric and pipe support detail. 2

TOPAZ

(Conceptual design)

- Model the structure of the TOPAZ Drilling Platform for client’s review using PDMS software.

3

TBCP / TBDR / MLDP /

LHDP

- Provision of Detail Design

For Tangga Barat Cluster

Development Project.

- Incorporate client’s comment of piping isometric and pipe support detail. Organize all the deliverables and make sure its tally with the design data and PDMS model.

- Study / Model the HVAC ducting system for the living quarters and control room. Study the sizing of the ducting to meet the design criteria and space constrain.

- Produce/generate piping isometric and pipe support detail Using PDMS software.

4 KNPGB / KNJTC

- Detail Design Services

Kinabalu NAG Development

Project.

- Model the HVAC ducting system for the living quarters and control room. Study the sizing of the ducting to meet the design criteria and space constrain.

- Incorporate checker’s comment and re-generate the pipe support detail. Organize all the deliverables and make sure its tally with the design data and PDMS model.

- Study & Model package equipment based on vendor data and equipment layout. Make sure all the equipments / design are updated. Communicate with the equipment engineer to confirm the nozzle orientation and its meet the design criteria.

5

SOGT

- Detail design of Sabah Oil &

Gas Terminal (refinery).

- Study & Model the tank based on Piping GA and tank detail drawing.

- Locate a nozzle as per vendor and piping routing requirement.

6

EWDP-A/ EWG-A

-Concept refinement, detailed

design and engineering services

for revisit, Erb West

Development Project.

- Model the dummy structure of the EWDP-A Platform For mechanical part and pipe routing location purpose.

- Study / model the actual size for all mechanical equipment based on vendor data. Study the nozzle orientation and height for pipe routing.

- Study the safety layout & model all the safety deliverable, such as escape route, walkway, fire monitor, fire

extinguisher.

7 AGRS

- Provision of Acid Gas

Removal System And Related

Services For Tangga Barat

Cluster Development Project.

- Piping isometric check.

- Prepare & model the PDMS catalogue for instrument valve and Mechanical Equipment based on Vendor Drawing.

8

PETRODAR

-Petrodar Operating Company

(A CNPC/PCOSB/SUDAPET/

AL-THANI joint venture

company

- Check and incorporate the piping isometric to meet the clients requirement and make sure no technical error before submitting the deliverable.

9

BUMI, BULAN & SURIYA

-Bumi, Bulan & Suriya Gas

Field Development. By Carigali

Hess Operating Company Sdn

Bhd

- Check and incorporate the piping isometric to meet the clients requirement and make sure no technical error before submitting the deliverable.

10 CAKERAWALA GAS

FIELD DEVELOPMENT

(CARIGALI HESS )- AS

BUILT WORK

- Check and incorporate the piping isometric against P&ID & site visit info to meet the clients requirement and make sure no technical error before submitting the deliverable. 11 TANGGA BARAT

CLUSTER, WELL

PLATFORM, MELOR

- Wellhead design as per vendor (SOLAR ALERT) drawing. 12 DETAIL ENGINEERING

SERVICES FOR RC3/RC1

DRAGON FIELD

DEVELOPMENT PROJECT

- Prepare HVAC ducting for the whole Platform using PDMS software.

13 KINABALU PHASE 2

DEVELOPMENT PROJECT

- Prepare specification and Data Sheet for monorail trolley hoist & nitrogen bottles rack.

- Prepare HVAC Design including AHU, CU, and Ducting in PDMS.

- Prepare Design for Wellhead, Including Wellhead 10K psi and 15K psi system.

14 FEED THANG LONG LAM

SON

- Prepare Mechanical Equipment based on P&ID & Vendor data.

- Design Single and Dual Wellhead as per Vendor (Solar Alert) Drawing.

15

AS-BUILT PROJECT

DRAWING (SHELL MDO)

-RNZ MDO

- Prepare Site Visit Plan.

- Prepare Checklist.

- Prepare Site Visit Report.

- Register all status of each drawing in Deliverables.

- Checking Drawing before issue to IDC, IFC & Sign-Off.

- Prepare Client review Form before Sign-Off.

16 DETAILED DESIGN FOR

SAFETY FACILITIES

UPGRADING AT BAKP-B

SHELTER (PCSB-SKO) –

RNZ MDO

- Prepare Site Visit Plan.

- Prepare Checklist.

- Prepare Site Visit Report.

- Prepare Specification & Datasheet for “Water Curtain” and “Sprinkler”.

17 PROVISION FOR

CONSTRUCTION

WORKPACK ASSISTANCE

(SKS WOOD)

-RNZ MDO

- Reading a Anomaly Report to get info.

- Prepared a Skatch, Isometric, Spading, Isolation Limit, Material Take-Off, Assmbly List and Torquing.

- Issue the bundle Worpack to Client.

TRAINING ATTENDED

-PDMS Piping Catalogue and Specification, organized by AVEVA on July 2009.

-BOSET Training organized by SMTC Global Miri on October 2013.

-CIDB MOCA (Oil & Gas) organized by CIDB Kota Kinabalu on September 2013.

-BOSET Training Organized by SEQU Offshore Safety August 2014.

-PTW Assessment-Organized by PCSB-PMO September 2014. COMPUTER SKILL

Software Years of experience Proficiency

Microsoft office (word, excel, power point) >15 Advance PDMS 9 Advance

AutoCAD, AutoPlan 7 Advance

OTHERS

Career Ambition: To gain employment with a company where I can contribute my experiences and knowledge, especially in the area of mechanical/ Piping including design stage, construction stage & hook-up and Commissioning.

Willing to Travel : Yes Possess Own Transport: Yes Willing to Relocate : Yes

Availability : One (1) Month Notice

REFERENCES

1. Name : Ir Saladin Jaszle Jasmin

Company : Halliburton Bayan

Petroleum Sdn. Bhd

Position : Project Manager

Telephone : -

H/P : 013-*******

3. Name : Ir. Mat Zaini Surip

Company : RNZ Integrated Sdn. Bhd.

(Petrofac)

Position : Mech / Piping Manager

Telephone : 03-42642600

H/P : 019-*******

5. Name : Hisham Moh

Company : Sapura Acergy

Position : Hook-Up Manager

Telephone : -

H/P : 012-*******

7. Name : Sulaiman Jaafar

Company : Armada TPCE MDO

Position : Senior Project Engineer

H/P : 016-*******

2. Name : Ir. Ashari Ebrahim

Company : Petronas Carigali Sdn.

Bhd. (SKO)

Position : Engineering Manager

Telephone : -

H/P : 013-*******

4. Name : Aasimudin Shamaan

Company : Brooke Dockyard &

Engineering

Position : Head Of Technical /

Engineering Service

Telephone : -

H/P : 017-*******

6. Name : Anthony Stephen Hodder

Company : Murphy Oil Corp

Position : HUC Manager / CSR

Telephone : -

H/P : 017-*******

8. Name : Norikhsan Hj. Annuar

Company : Petrokon Utama Sdn. Bhd.

Position : Piping / Mechanical Lead

Engineer

H/P : 016-*******



Contact this candidate