PERSONAL DETAILS
NAME : WAN AHMAD WAZIR AFANDY
BIN MOHD SANI
ADDRESS : NO 11 TAMAN ATIKAH,
BATU RAKIT,
TERENGGANU DARUL IMAN.
PHONE : 019-*******
Date of birth : 19 November 1983 Sex : Male
Nationality : Malaysian Race : Malay
Marital status : Married Religion : Islam
Height/Weight : 1.65 m/ 58 kg Age : 33 years old
E-mail : ***********@*****.*** IC. Number : 831***-**-**** BSP B/CODE : A53824 BRUNEI IC : 51-290496
BOSET CERT : M-BR324332/14 LINKEDIN : Wazir Afandy EDUCATIONAL BACKGROUND
Highest Education
Level : Bachelor’s Degree
Field of study : Mechanical Engineering
Major : Manufacturing and Production
University : University Tun Hussien Onn Malaysia Graduate Date : 2007 (March) Second Highest Education
Level : Executive Diploma
Field of study : Piping Engineering for Processing Plant Major : Oil & Gas (Petroleum)
University : University Tun Hussien Onn Malaysia (UTHM) collaborate with Octagon Petroleum Technology Sdn Bhd.
Graduate Date : 2007 (Sept)
Key Courses : Petroleum Engineering, Piping and Plant layout development, Petroleum Facilities, Quality, Health, Safety & Environment (QHSE), project management and asset management.
Coursework
2006 Bachelor Degree’s Final Year Project
“Improve The Structure of Existing Scissor Jack” (Used DFMA Method) 2007 Executive Diploma Final Project
1. Petaling Gas Field Development Project (conceptual Design) 2. Biodiesel Plant for UTHM Project
Experiences
Company Name : ARMADA TPCE SDN. BHD
Position Title : SENIOR PIPING ENGINEER / PMT
Position Level : Executive
Industry : Engineering / Design / FSO
Duration : 2015 - Present
Company Name : INTERNATIONAL OIL DESIGN & CONSTRUCTION (IODC) Position Title : LEAD MECHANICAL & PIPING ENGINEER Position Level : Executive
Industry : Engineering / Design / Refinery
Duration : 2015 - 2015
Company Name : HALLIBURTON BAYAN PETROLEUM SDN. BHD. (HBP) Position Title : MECHANICAL & PIPING ENGINEER (PMT) Position Level : Executive
Industry : Operator (Partnership with Petronas) / EPCIC / Wellhead-Infill Duration : 2014 - 2015
Company Name : LABUAN SHIPYARD ENGINEERING SDN. BHD. Position Title : PIPING ENGINEER / PDMS ADMINISTRATOR / PMT Position Level : Executive
Industry : Engineering / Fabrication / Platform / Jacket Duration : 2013 - 2014
Company Name : PUSB ENGINEERING SDN. BHD.
Position Title : PIPING ENGINEER
Position Level : Executive
Industry : Engineering / Design / Refinary / Platform / Chemical Plant Duration : 2011 - 2013
Company Name : RNZ INTEGRATED (M) SDN. BHD. (KLHO & MDO) Position Title : PIPING ENGINEER / PDMS DESIGN ENGINEER Position Level : Executive
Industry : Engineering / Design / Offshore Platform Duration : 2007 - 2011
Experience summary : - Involved in engineering construction, hook-up & commissioning.
- Involved in engineering design, project execution and procurement.
- Involved in various stages of design such as Conceptual, FEED, Detailed Design, Independent Design Assessment for Green Fields and Brown Fields.
- Familiar with a range of proprietary software including PDMS and AutoCAD, AutoPlan and familiar with relevant international codes and standards including ASME, ANSI, and API.
Professional Affiliation : Board of Engineer Malaysia (reg. no. : 56150A) ARMADA TPCE PROJECT INVOLVEMENT
No Project Responsibilities
1 PROVISION OF DETAILED
ENGINEERING DESIGN
FOR AN FSO FACILITY
FOR FULL FIELD
DEVELOPMENT FFD.
(HESS-E.A.Technique)
- Prepare Specialty Item Datasheet.
- Prepare Specialty item Specification.
- Checker for Manual Valve Datasheet.
- Checker for Valve Specification.
- Checker for Piping Specification.
- Checker for Piping Isometric (Upper Deck, Engine Room & Pump Room).
- Checker & reviewer for PDMS Design for the whole FSO.
- Project Management Support (PMS) at MMHE Yard
during demolition works.
IODC PROJECT INVOLVEMENT
No Project Responsibilities
1 ABADAN REFINERY
UPGRADING PROJECT
(NATIONAL IRAN OIL &
GAS COMPANY-NIOEC)
-Study Iranian Petroleum Standard (IPS), NIOEC Standard & Project Standard to familiarize and implement in a project.
-Prepare Piping Deliverable such as Line List, Critical Line List, Material Take-Off & Plot Plan.
-Prepare Mechanical deliverable such as, Engineering Drawing, Datasheet, Specification & Requisition,
-Coordinate designer & drafter to align work progress and work quality.
-Review & comment 3D model & drawing prepared by
Designer before issue to client.
-Interface with other department (Process, Electrical & Instrument) to minimize all technical issue.
HBP PROJECT INVOLVEMENT
No Project Responsibilities
1 BAYAN DECK EXTENSION
& INFILL PROJECT
(PCSB & HBP.)
-Study Project General Instruction, Exhibit & Project Guide.
-Interface with EPCIC Contractor, Petronas SKO team, PCSB Operation Team, PCSB Line Department Team, Halliburton Drilling Team, Halliburton Production Enhancement Team, Rig Contractor (NAGA4), Mech/Piping Vendor & Current Modification Contractor to ensure all work has well plan.
-Review & Verify EPCIC document such as Isometric Drawing, Mechanical Layout Drawing, Mech/Piping Drawing,
Mech/Piping Report, Mech/Piping Datasheet, Mech/Piping Specification, Vendor Drawing, Vendor Data, Purchase Order, Workpack, Jobcard, Test Packages & etc.
-Conduct PDMS Review to Halliburton Top Management.
-Coordinate Mechanical / Piping Engineering Drawing & Document Deliverable.
-Coordinate Mechanical / Piping Procurement Document Deliverable.
-Coordinate Mechanical / Piping Construction, Hook-Up & Commissioning.
-Involve in HAZID, HAZOP, PDMS Review & LDR
Review.
-Involve in Construction Risk Assessment (CRA).
-Involve in SIPROD & SIMOPS preparation.
-Involve in SITCOM discussion.
- Project Management Support Team at Tebrau Yard.
LSE PROJECT INVOLVEMENT
No Project Responsibilities
1 PERMAS DEVELOPMENT
PROJECT
(MURPHY OIL CORP.)
- Organized meeting with related consultant who prepared a PDMS design.
- Transfer PDMS raw file into our server.
- Setup PDMS Admin menu to create access for our PDMS operator. Then setup each personal computer to make sure they can access a file.
- Dealing with AVEVA for any enquiries and related licence.
- Produce Isometric Drawing, Plot Plan Drawing, Pipe Support Detail Drawing, Pipe Support Arrangement Drawing,
Electrical & Instrument Cable Ladder Drawing and etc.
- Re design in PDMS for any changes.
- Prepared PDMS Review File and Conduct PDMS review meeting.
- Prepared Piping List, Spool & Joint List, Ship loose Item List, Material Take Off, Workpack List, Hydrotest List, Hydrotest Check Sheet, Punch list and etc.
- Prepared Hydrotest Package.
- prepared all Hydrotest material & equipment list for offshore usage.
- Involve in lifting plan and procedure.
- Attend Jacket Top Panel Lifting.
- Monitor Bouyancy Tank Fabricate & Lifting.
- Monitor Mud Mat Preparation and installation.
- Attend Jacket Load Out onto Barge.
- Attend Crane installation on Cellar Deck.
- Prepared all Piping List & MTO for Hook-Up work.
- Prepared all Piping Work including segregated spool, Pipe support and Open Tray.
- prepared Job Card & Test pack for piping work at offshore.
- Monitor / supervise lifting work for all piping equipment & material from LSE yard onto working barge & from working barge onto Permas Platform.
- Monitor /supervise all piping work include pipe support on Permas Platform from installation until testing.
- Prepared & conduct related testing for piping. Including Hydrotest, Leak Test, Flood Test, Flushing & Blowing.
- Prepared all commissioning document related to piping. Include Commissioning Test Procedure (CTP), Test Package, Inspection Test Report (ITR), Mechanical Completion Certificate (MCC), Construction Completion Certificate(CCC)
& System Handover (SH).
PUSB PROJECT INVOLVEMENT
No
1
Project
PROVISION FOR
CONSTRUCTION
WORKPACK ASSISTANCE
(SKS WOOD)
Responsibilities
- Prepare a Sketch, Isometric, Spading, Isolation Limit, Material Take-Off, Assmbly List and Torquing as per Client request base on Anomaly Report..
- Prepare drawing using AUTOCAD & AUTOPLAN
software.
2 AS-BUILT PROJECT
DRAWING (BRUNEI SHELL
PETROLEUM)
- Check & Incorporate PDMS as per latest isometric & latest P&ID from PUSB Brunei.
- Prepare site visit report.
- Register all status of each drawing in deliverables.
- Generate Isometric drawing from PDMS software.
- Checker for each drawing before issue to IDC.
3 BLNG EVACUATION PLAN-
FIRE FIGHTING & SAFETY
EQUIPMENT LAYOUT
(BRUNEI SHELL
PETROLEUM)
- Take full responsible to prepared site visit report, review drawing and checking drawing before sign-off.
- Study and apply Work instruction for “AUTOCAD
Engineering Design Office”, “Drawing Management
System” and “Standard on Fire Safety Symbols”.
4 NGCP-TRA1/2/3 SUCTION
FILTER IMPROVEMENT
PROJECT (NATURAL GAS
CORPORATION PLANT)
- Take responsible to handle the project from site visit until AFC package.
- Prepare Scope Of Work, Isometric, Tie-in Schedule, Bulk Mto, GA Drawings, Insulation list, Pipe Support Detail and Drawing list using Vendor datasheet, Vendor Drawing and input from Site Visit findings.
- Interface with other department to solve any issue and directly discuss with client and vendor for the same purpose. 5 SCHEDULE TURN-AROUND
(STA) 2013-(BRUNEI
METHANOL COMPANY
(BMC) )
- Perform site visit to survey the equipment condition, check access to the equipment, a scaffolding space, lifting method, and take a picture for referance.
- Prepare site visit report and workpack to the client.
- 2nd phase for this project is to make a replacement or adjustment at certain area in plan to improve plant process based on comment from Plant workers.
- Make a 2nd site visit to review a situation and try to solve the problem. Process Requirement, no “pocket” allow in pipe routing.
6 LAYOUT OF FIRE WATER
PIPING SYSTEMS &
LOCATION OF HYDRANT
(BRUNEI LIQUID & GAS-
BLNG SDN BHD)
- Calculate maximum range of Hydrant base on system pressure, line size and flow rate.
- Determine the suitable location of hydrant to make sure it will cover maximum area base on maximum range.
- Take full responsible to prepare site visit report, review drawing and check drawing before sign-off.
7
SCOT REJUVENATION
PHASE III: TANK
BLANKETING PROJECT.
(BRUNEI SHELL BERHAD)
- Take responsibality to prepared site visit report, Plot Plan and drawing request.
- Ascertain the availability of spare nozzles on all the identified tanks intended for tank blanketing gas service as stipulated in the project scope of work ;
- Locate suitable location of pressure reducing station
(PRS) required for the tank blanketing gas service ;
- Establish preliminary route of fuel gas header that supplies gas for tank blanketing service to enable process Design (hydraulic) to take place.
- Prepared Material Requisition of Strainer and Relief Valve.
- Report progress status to Brunei Office and prepared Comment Response Sheet.
- Involve in HAZOP Workshop/Meeting.
- Arrange 2nd site visit to meet new client requirement, “No hot work during installation work”. So we find out location for pipe support n pipe routing to avoid hot work and use Lindapter type Support.
8 MAHARAJA LELA SOUTH
PROJECT
(TOTAL E&P BORNEO)
- Assist PDMS team in Kuala Belait (Head Office).
- Complete all Mechanical and Piping works using PDMS design.
- Convert all PDMS Design into 2D Draft.
- Prepare & Issue Isometric, Piping Plan & Equipment Layout using PDMS and Autocad.
9 DETAIL DESIGN OF
REPLACEMENT LEVEL
GUAGE (BRUNEI LIQUID &
GAS-BLNG SDN BHD)
- Take responsible to handle the project from site visit until AFC package.
- Prepare Scope Of Work, Isometric, Tie-in Schedule, Bulk Mto, GA Drawings, Insulation list, Pipe Support Detail and Drawing list using Vendor datasheet, Vendor Drawing and input from Site Visit findings.
- Prepare Material Requisition (MR) and Datasheet for missing Level Gauge.
- Work with other department to solve any issue and directly discuss with client and vendor for the same purpose. 10 CONTROL VALVE &
RELIEF VALVE
ENGINEERING AND
DETAIL DESIGN
(BRUNEI LIQUID & GAS-
BLNG SDN BHD)
- Take responsible to handle this project from site visit until AFC package.
- Prepare Valve list using Vendor datasheet, Vendor Drawing and input from Site Visit findings.
- Prepare Scope Of Work, Isometric, Tie-in Schedule, Bulk Mto, GA Drawings, Insulation list, Pipe Support Detail and Drawing list.
- Interface with other department to solve any issue and discuss with client and vendor for the same purpose. 11 SCOT AS-BUILT PACKAGE
2 & 3
(SERIA CRUDE OIL
TERMINAL-SCOT)
- Assign as Project engineer. Update weekly progress report
& monthly manhours report.
- Handling Mech/Piping Department, Electrical Dept. and C&A Dept.
12 BMC STA 2013 SCOPE- CIN
WORKPACK
PREPARATION AND SUMP
PUMP DETAIL DESIGN.
(BRUNEI METHANOL
COMPANY (BMC) )
- Prepare site visit checklist and site visit report.
- Prepare sketch drawing of isometric and pipe support based on site visit input and guide Drafter to CAD it.
- Responsible to determine pipe routing, pipe support Location and Elevation base on P&ID and client requirement.
- Prepare Material Requisition (MR) and Datasheet to purchase Sump Pump base on current recommendation.
13 CONSULTANCY,
ENGINEERING, DESIGN
AND WORK SUPERVISION
FOR PLANT 1 JETTY
REINSTATEMENT
(PETRONAS CHEMICALS
LABUAN)
- Prepare Site visit Checklist for Mechanical / piping site visit team.
- Prepare Pipe stress analysis calculation and report for pipe to determine pipe support location along the jetty.
- Prepare stress analysis calculation and report for vertical gas separator Pressure vessel to make sure a saddle still good enough to support a vessel during Hydrotesting.
- Prepare stress analysis calculation and report for Horizontal Drain Pot Pressure Vessel to make sure a saddle still strong enough to support a vessel during Hydrotesting.
- Prepare calculation, drawing and report of new Foam Fire Monitor using Projectile Motion Theory. The result from calculation are used to determine a suitable location of new Foam Fire Monitor to cover Equipment on Jetty and Manifold on Tank Ship.
- Prepare calculation and report for Airconditioning in a new Control Room base on Temperature at plant, room area, person in room, heat of each equipment inside room and all others related basis to get suitable Horse Power of New Air-conditioning system.
RNZ PROJECT INVOLVEMENT
No Project Responsibilities
1 CPOC (MDA, JKA, MDB,
MDC)
- EPCC For WHP Jacket And
Deck, QP, Jacket Pre-
commissioning and
Commissioning.
- Incorporate client’s comments on piping’s isometric and Pipe support detail. Organize all the deliverables and make sure it is tally with the design data and PDMS model.
- Produce piping isometric and pipe support detail. 2
TOPAZ
(Conceptual design)
- Model the structure of the TOPAZ Drilling Platform for client’s review using PDMS software.
3
TBCP / TBDR / MLDP /
LHDP
- Provision of Detail Design
For Tangga Barat Cluster
Development Project.
- Incorporate client’s comment of piping isometric and pipe support detail. Organize all the deliverables and make sure its tally with the design data and PDMS model.
- Study / Model the HVAC ducting system for the living quarters and control room. Study the sizing of the ducting to meet the design criteria and space constrain.
- Produce/generate piping isometric and pipe support detail Using PDMS software.
4 KNPGB / KNJTC
- Detail Design Services
Kinabalu NAG Development
Project.
- Model the HVAC ducting system for the living quarters and control room. Study the sizing of the ducting to meet the design criteria and space constrain.
- Incorporate checker’s comment and re-generate the pipe support detail. Organize all the deliverables and make sure its tally with the design data and PDMS model.
- Study & Model package equipment based on vendor data and equipment layout. Make sure all the equipments / design are updated. Communicate with the equipment engineer to confirm the nozzle orientation and its meet the design criteria.
5
SOGT
- Detail design of Sabah Oil &
Gas Terminal (refinery).
- Study & Model the tank based on Piping GA and tank detail drawing.
- Locate a nozzle as per vendor and piping routing requirement.
6
EWDP-A/ EWG-A
-Concept refinement, detailed
design and engineering services
for revisit, Erb West
Development Project.
- Model the dummy structure of the EWDP-A Platform For mechanical part and pipe routing location purpose.
- Study / model the actual size for all mechanical equipment based on vendor data. Study the nozzle orientation and height for pipe routing.
- Study the safety layout & model all the safety deliverable, such as escape route, walkway, fire monitor, fire
extinguisher.
7 AGRS
- Provision of Acid Gas
Removal System And Related
Services For Tangga Barat
Cluster Development Project.
- Piping isometric check.
- Prepare & model the PDMS catalogue for instrument valve and Mechanical Equipment based on Vendor Drawing.
8
PETRODAR
-Petrodar Operating Company
(A CNPC/PCOSB/SUDAPET/
AL-THANI joint venture
company
- Check and incorporate the piping isometric to meet the clients requirement and make sure no technical error before submitting the deliverable.
9
BUMI, BULAN & SURIYA
-Bumi, Bulan & Suriya Gas
Field Development. By Carigali
Hess Operating Company Sdn
Bhd
- Check and incorporate the piping isometric to meet the clients requirement and make sure no technical error before submitting the deliverable.
10 CAKERAWALA GAS
FIELD DEVELOPMENT
(CARIGALI HESS )- AS
BUILT WORK
- Check and incorporate the piping isometric against P&ID & site visit info to meet the clients requirement and make sure no technical error before submitting the deliverable. 11 TANGGA BARAT
CLUSTER, WELL
PLATFORM, MELOR
- Wellhead design as per vendor (SOLAR ALERT) drawing. 12 DETAIL ENGINEERING
SERVICES FOR RC3/RC1
DRAGON FIELD
DEVELOPMENT PROJECT
- Prepare HVAC ducting for the whole Platform using PDMS software.
13 KINABALU PHASE 2
DEVELOPMENT PROJECT
- Prepare specification and Data Sheet for monorail trolley hoist & nitrogen bottles rack.
- Prepare HVAC Design including AHU, CU, and Ducting in PDMS.
- Prepare Design for Wellhead, Including Wellhead 10K psi and 15K psi system.
14 FEED THANG LONG LAM
SON
- Prepare Mechanical Equipment based on P&ID & Vendor data.
- Design Single and Dual Wellhead as per Vendor (Solar Alert) Drawing.
15
AS-BUILT PROJECT
DRAWING (SHELL MDO)
-RNZ MDO
- Prepare Site Visit Plan.
- Prepare Checklist.
- Prepare Site Visit Report.
- Register all status of each drawing in Deliverables.
- Checking Drawing before issue to IDC, IFC & Sign-Off.
- Prepare Client review Form before Sign-Off.
16 DETAILED DESIGN FOR
SAFETY FACILITIES
UPGRADING AT BAKP-B
SHELTER (PCSB-SKO) –
RNZ MDO
- Prepare Site Visit Plan.
- Prepare Checklist.
- Prepare Site Visit Report.
- Prepare Specification & Datasheet for “Water Curtain” and “Sprinkler”.
17 PROVISION FOR
CONSTRUCTION
WORKPACK ASSISTANCE
(SKS WOOD)
-RNZ MDO
- Reading a Anomaly Report to get info.
- Prepared a Skatch, Isometric, Spading, Isolation Limit, Material Take-Off, Assmbly List and Torquing.
- Issue the bundle Worpack to Client.
TRAINING ATTENDED
-PDMS Piping Catalogue and Specification, organized by AVEVA on July 2009.
-BOSET Training organized by SMTC Global Miri on October 2013.
-CIDB MOCA (Oil & Gas) organized by CIDB Kota Kinabalu on September 2013.
-BOSET Training Organized by SEQU Offshore Safety August 2014.
-PTW Assessment-Organized by PCSB-PMO September 2014. COMPUTER SKILL
Software Years of experience Proficiency
Microsoft office (word, excel, power point) >15 Advance PDMS 9 Advance
AutoCAD, AutoPlan 7 Advance
OTHERS
Career Ambition: To gain employment with a company where I can contribute my experiences and knowledge, especially in the area of mechanical/ Piping including design stage, construction stage & hook-up and Commissioning.
Willing to Travel : Yes Possess Own Transport: Yes Willing to Relocate : Yes
Availability : One (1) Month Notice
REFERENCES
1. Name : Ir Saladin Jaszle Jasmin
Company : Halliburton Bayan
Petroleum Sdn. Bhd
Position : Project Manager
Telephone : -
H/P : 013-*******
3. Name : Ir. Mat Zaini Surip
Company : RNZ Integrated Sdn. Bhd.
(Petrofac)
Position : Mech / Piping Manager
Telephone : 03-42642600
H/P : 019-*******
5. Name : Hisham Moh
Company : Sapura Acergy
Position : Hook-Up Manager
Telephone : -
H/P : 012-*******
7. Name : Sulaiman Jaafar
Company : Armada TPCE MDO
Position : Senior Project Engineer
H/P : 016-*******
2. Name : Ir. Ashari Ebrahim
Company : Petronas Carigali Sdn.
Bhd. (SKO)
Position : Engineering Manager
Telephone : -
H/P : 013-*******
4. Name : Aasimudin Shamaan
Company : Brooke Dockyard &
Engineering
Position : Head Of Technical /
Engineering Service
Telephone : -
H/P : 017-*******
6. Name : Anthony Stephen Hodder
Company : Murphy Oil Corp
Position : HUC Manager / CSR
Telephone : -
H/P : 017-*******
8. Name : Norikhsan Hj. Annuar
Company : Petrokon Utama Sdn. Bhd.
Position : Piping / Mechanical Lead
Engineer
H/P : 016-*******