Resume alert |
Resumes 21 - 30 of 108 |
Quezon City, Philippines
... 30, 2018 Daewoo E&C (Safi Independent Power Plant) Coal Power Plant 1,350 Megawatts,Safi-Morocco Position: QA/QC Civil /Architectural Engineer/Inspector Duties and Responsibilities Reviewed approved designed drawing, specification, method of ...
- 2022 Feb 14
Quezon City, Philippines
... Offshore Jetty, precast production installation and erection, construction of elevated in-situ concrete, Petrochemical Plant, Air Base Facilities, Energy and Power 3x55MW Coal Fired Thermal Power Plant. Experience: 37 years Professional Registration ...
- 2021 Dec 06
Del Remedio, Laguna, Philippines
... POWER PLANT ELECTRICIAN July2002- December 2005 Semirara Mining Corporation 15MW Coal fired Thermal Power Plant Semirara Island, Caluya, Antique, Philippines Duties and Responsibilities: -Cut-in/ Cut-out and earthlings of 34.5 KV HV switchgear. ...
- 2021 Nov 15
Binan, Laguna, Philippines
... Harmony Initial material take off of components from equipment layout Manual sketch for pipe for project estimate JG Summit Coal Fired Power Plant Model of equipment and structure using AutoPant 3D Routing of pipe based on P&ID and equipment layout ...
- 2021 Oct 19
Quezon City, Philippines
... Piping Engineer Project Involved: EPC for Pagbilao 420 MW Unit-3 Coal Fired Power Plant (Pagbilao, Quezon Philippines) Team Energy Corporation / Aboitez Group Company Duties & Responsibilities: Responsible to reviewing design contractor ...
- 2021 Sep 27
Antipolo, Rizal, Philippines
... Point Load Test, and Schmidt Hammer Project: Standard and Seismic CPT Testing for Pipeline and Foundation Extension of Semirara Coal Plant at Calaca Batangas · Supervised and performed standard and seismic CPT (Cone Penetrator Test) operation in the ...
- 2021 Sep 10
Quezon City, Philippines
... CONSUNJI, INC (2012-2014) Makati City, Philippines Designation: Planning Manager Projects: 2x150 MW CFB Coal Fired Power Plant-Calaca, Batangas 1x135 MW CFB Coal Fired Power Plant-Calaca, Batangas 1x15 MW CFB Coal Fired Power Plant-Aklan, ...
- 2021 Aug 22
Quezon City, Philippines
... - Island Creek Coal Company Alpine Preparation Plant, Bayard West Virginia, U.S.A. State Compensation Insurance Fund, Oxnard California, U.S.A. Alex M. Vengua - Page 6 of 8 Firms Jan 2018 - Present PHESCO, Inc., Q.C., Philippines Dec 2013 - Mar 2016 ...
- 2021 May 31
Santa Rosa, Laguna, Philippines
... 13, 2008 Plant Visit – Building Management Systems Ayala Property and Management Corporation Tower One and Exchange Plaza, Makati City August 4, 2001 Plant Visit – Calaca Coal Power Plant Calaca, Batangas City December 2003 Engineering Operations M. ...
- 2021 May 28
Quezon City, Philippines
... steel, flour, feeds etc.), Energy Development Sectors (Coal-Fired Power Plants), Industrial Sectors, Transport/Heavy Equipment, Construction Companies. Maintained supplier-client relationships - Update clients regarding current status of their ...
- 2021 May 17