Facility and Project Management / Procurement and Logistics Management Graduate of Electrical Engineering

Mapua Institute of Technology - SY 2004

Address: B19L7 Avida Village – Nuvali, Sta. Rosa, Laguna Email: admr3k@r.postjobfree.com

Phone: +63-945-***-****

Skype: amalejandro

JOB HISTORY:

1) Depot Manager (Philippines Region)

Mabe Integra S.A. DE C.V. (General Electric Co. Partner) 100 Paseo De Las Palmas, Col. Lomas De Chapultepec I Seccion Mexico City - Miguel Hidalgo; Federal District of Mexico City – 11000 Project Involvement:

GE Appliances (Home and Kitchen Appliances)

Mabe Appliances (Home and Kitchen Appliances)

Duties and Responsibilities:

Manage quality operations in the Philippines.

Involve in the Research & Development Division in Mexico for product improvements.

Investigate product defect and determine epidemic failure.

Create and plan solutions on existing product failures.

Coordinate with factories in Asia Region and North America Region.

Propose plans for company improvements and increase of sales.

2) Project Manager

Eastern Retail Fashion Ltd.

P.O. Box 12595 Dammam 31432 K.S.A.

August 9, 2014 – July 11, 2015

Project Involvement:

Red Tag Concept Showrooms

Twenty4 Concept Showrooms

Duties and Responsibilities:

Direct reporting to Country Manager

Performed site visit inspection for proposed future projects.

Designed 3D with rendering of showroom concept for presentation of new projects.

Designed AutoCAD drawing bubbles of surveyed new project sites and sent to Dubai Head office for Shop drawings.

Studied and analyzed shop drawings from Dubai Head office for accuracy and possible revisions.

Revised shop drawings, designs and arrangement of concept design as per Country Manager Requirements.

Conduct site and office meeting for bidding Contractors to identify and discuss possible occurring problems during shop fittings.

Prepare detailed budget costing of new projects.

Prepare bid analysis data from bidding Contractors.

Prepare Legal Binding Contracts to the winning bidding Contractor for signing.

Signed and approved Local Purchasing Order (LPO) for current and on-going projects.

Prepare presentation of monthly projects plans and progress report.

Managed and Supervised 4 Engineers Site Supervisor in my team and mobilized them on current and new projects.

Weekly visits and inspection of site projects for progress report and conducts meeting with the Contractors.

Conducts actual site inspections of Electrical Systems, I.T. System, CCTV’s Systems, Fire Fighting Systems, Facility and HVAC Equipment’s, and component to identify hazards, defects, and the need for adjustment or repair, and to ensure compliance with company’s codes and guidance’s.

Hand over finish projects and documents to respective shops Managers.

File project documents.

3) Regional Shopfit Manager (Western Region, K.S.A.) (job promoted) November 2012 – January 2014

Facility and Maintenance Manager (job promoted)

August 2012 – October 2012

Maintenance Supervisor

June 28, 2011 – August 2012

Arabian Centres, Inc.

P.O. Box 100604 Jeddah 21311 K.S.A.

June 28, 2011 – January 25, 2014

Project Involvement:

Al Salaam Mall Jeddah (Jeddah, K.S.A.)

Aziz Mall (Jeddah, K.S.A.)

Mall of Arabia (Jeddah, K.S.A.)

Haifaa Mall (Jeddah, K.S.A.)

Makkah Mall (Makkah, K.S.A.)

Al Noor Mall (Makkah, K.S.A.)

Al Hokair Academy for Business (Jeddah, K.S.A.)

Duties and Responsibilities:

As Maintenance Manager

Conducting regular inspections and ensuring the upkeep and maintenance of all areas of a facility.

Maintains the safety and full operational of Mall Electrical Facilities and Equipment’s (e.g. Electrical Rooms, Pump Room, Generator Room, Transformer Room, CCTV’s, Firefighting Systems, etc…).

Maintains full operational of system components parts, equipment’s and facility components (e.g. lightings, HVAC, alarms, plumbing, electrical panels, etc…).

Ensuring the proper working of all electrical units and systems in the facility.

Leading a team of 30 engineers and delegating work areas to them.

Keeping a record of all the day-to-day maintenance and service activities undertaken in a facility.

Evaluating the performance of the subordinates.

Placing orders for spare parts and equipment’s for replacement and ascertaining the proper documentation of the same.

Synchronizing work processes with other divisions of the establishment.

Complying with all corporate policies and the Occupational Safety and health administration rules

(OSHA) while carrying out maintenance functions.

Performs a daily monitor of electrical consumption and plan on how to save more power yearly for annual budget.

Prepare Annual budget.

Plan a weekly monitoring guidelines on preventive maintenance for equipment.

Revised for improvements for renewal of warranty services for facilities equipment’s.

Prepare monthly reports of the Facility and Equipment’s status.

Proposed new projects for improvements of Facility.

Prepare annual appraisal and grading of maintenance team. Compose of 30 engineers and Technicians. As Shopfit Manager

Under the directions and direct reporting to the office of the Director for Operations.

Gives final approval of Concept and MEP drawings for every new store project at the mall and if they follow the Mall Guidelines.

Gives final approval of HVAC drawings if complies with the mall allowable tonnages/BTU per sq.m.

Gives final approval Electrical Power supplies and system components (e.g. Electrical cables, load balance calculation, circuit breakers, junction boxes, etc…) for every store projects if complies with the Mall Guidelines.

Gives final approval for new tenants to mobilize and start shop fittings.

Gives final approval to stop or continues showroom under fittings for any possible violation of the Rules and Regulations of the Mall.

Informed and Educate new and old tenants for Malls current concept store and provide them details and drawing for guidelines.

Conducts daily inspection of new showroom under fittings for possible violation of Mall Safety Rules and Guidelines. And if contractors are aligned in occupational safety environment.

Keeping a record and filling of all the day-to-day shop inspections undertaken during stores construction

(e.g. revised drawings, hand over documents, final opening approval letter, payments receipts, etc…).

Provide continues development of Mall Tenant Guidelines for all Al Hokair Malls for improvements.

Gives final approval before allowing new showrooms to open.

Prepares detailed monthly report of ongoing showrooms under fittings.

Gives inspection report of newly constructed facilities as per advice of Director for Operations office.

Coordinates with the Mall Management for proper operations of showroom under fittings.

Handover of newly finished showroom to the Mall Management for operations. 4) Procurement and Logistics Head

A.G. Araja Construction and Development Corp.

A.G.A. Bldg. Jaguar St. Mercado Village, Sta. Rosa City, Laguna Oct. 6, 2009 – Feb. 16, 2010

Project Involvement:

On Semi Conductor Philippines Inc. (Expansion)

Diosdado Macapagal International Air Port (Expansion) Duties and Responsibilities:

Direct reporting to Assistant Vice President for Operations.

Lead and Manage Purchasing Team

Create Procurement and Logistic Business Process.

Create Procurement Plan Schedule for current project.

Create Procurement Monitoring.

Reviews offers to Supplier/subcontractor and verify project/specifications compliance considering scope, quality, etc.

Collect necessary technical information, monitor supplier performance and maintaining records of non- conformance.

Track deliveries and shipping the items to the project site.

Monitor Warehouse supplies and inventories.

Lead and guide purchasing staff for companies Code of Conduct.

Lead and delegate works of purchasing staff for every projects. 5) Procurement Officer

Leighton Contractors (Philippines) Inc.

7/F L.V. Locsin Bldg. Makati Ave., cor. Ayala Ave., Makati City July 14, 2008 – Jan. 16, 2009

Project Involvement:

Masbate Power Plant

NLEX Phase 2 Segment 8.1 (tendering stage)

Duties and Responsibilities:

Direct reporting to Procurement and Commercial Manager.

Ensure specifications and drawings are reviewed and clarified on related materials.

Propose material source/suppliers and subcontractors in compliance with project requirements.

Reviews offers to Supplier/subcontractor and verify project/specifications compliance considering scope, quality, etc.

Prepare Supplier/Subcontractor Assessment sheet and advise Project/Procurement Mngr. of best options and ensure senior management approval before submission to the client.

Prepare Purchased Order for the materials approve by the senior management.

Collect necessary technical information, monitor supplier performance and maintaining records of non- conformance.

Update of supplier/subcontractor database.

Assist in the preparation of payment applications as well as analyzing the costs.

Track deliveries and shipping the items to the project site. 6) Material Engineer

Empire East Land Holdings Inc.

The World Center Bldg. 330 Sen. Gil Puyat Ave. Makati City July 1, 2007 – July 14, 2008

Project Involvement:

Governor’s Hills Subdivision

Sunrise Hills Subdivisions

Sta. Rosa Heights Subdivision

Sta. Rosa Hills Subdivision

Suntrust Adriatico Gardens Condominium

Cybergreens Subdivision

Laguna BelAir Subdivision

Empire East Land Holdings and Empire East Suntrust office supplies Duties and Responsibilities:

Check and review materials specification needed/requested at the Project site.

Prepare canvas sheet of suppliers offer for senior management approval.

Prepare Purchased Order for the materials approve by the senior management.

Track and Monitor the items to the project site.

Record all the Purchased Request and Purchased Order for monitoring purposes.

Collect necessary technical information, monitor supplier performance.

Assist in the preparation of payment as well as analyzing the costs. Skills and Expertise:

AutoCAD 2D & 3D with rendering

Google Sketchup 3D with rendering

Architectural Design Plan

Electrical Design Plan and Calculations.

Adobe Light Room

Adobe Photoshop

Adobe Premier

MS Project

MS Office

Automation Studio (Pneumatic and Hydraulic

Design System)

MultiSim (Electronic Circuits Design System)

Advertising Designs and Printing

Seminars Attended:

Microsoft Project 2013 Advanced

ExecuTrain Bldg. P.O. Box 26977 Dubai, U.A.E.

June 1, 2015

Solid Waste and Energy Conservation

LCPI Hall Ayala Ave., Makati City

August 30, 2008

Occupational Health and Safety Procedures Training LCPI Hall Ayala Ave., Makati City

July 19, 2008

CHEOPS Training

LCPI Hall Ayala Ave., Makati City

August 22, 2008

First Aid Training for Office Employees

Upper Pent House, Prince Plaza II, Makati City

September 13, 2008

Basic Life Support Adult CPR Training For Lay

Rescuers

Upper Pent House, Prince Plaza II, Makati City

September 13, 2008

Plant Visit – Building Management Systems

Ayala Property and Management Corporation

Tower One and Exchange Plaza, Makati City

August 4, 2001

Plant Visit – Calaca Coal Power Plant

Calaca, Batangas City

December 2003

Engineering Operations

M. I. T. - Intramuros, Manila

November 15, 2003

Academe and Technical Sales

M. I. T. - Intramuros, Manila

November 15, 2003

Sales and Marketing

M. I. T. - Intramuros, Manila

November 15, 2003

Character References:

1. Brian Parsons (Commercial and Procurement Manager) Tel# 841-0998 Leighton Contractors (Phil’s.) Inc.

2. Christine Marvilla (HR Manager) Tel# 841-0998

Leighton Contractors (Phil’s.) Inc

3. Jessica Gayotin (HR Manager) Tel# 867-8351

Empire East Land Holdings, Inc.



Contact this candidate