|
Resume alert |
Resumes 11 - 20 of 50 |
Raipur, Chhattisgarh, India
... POWER VENTURES LIMITED, SINGRAULI since June 2011 Boiler Desk Engineer (Engineer) (Commissioning and Operation in 2x660 MW Super Critical Power Plant Boiler & Turbine Make: L&T MHI) • Responsible for Boiler Operation, hot & cold start-up of boiler; ...
- 2020 Sep 12
Raipur, Chhattisgarh, India
... Manager (2X135MW CFBC Boiler) Job Profile : Working as Asst. Manager (Electrical) in 2x135MW TPP and handle the operation, maintenance and Techno commercial activities. RESPONSIBILITIES: Planning/Scheduling of periodic and major maintenance / ...
- 2020 Sep 04
Raipur, Chhattisgarh, India
... Company Profile:- OPERATIONAL ENERGY GROUP INDIA LIMITED at the Site of AMBUJA CEMENT LIMITED UNIT BHATAPARA (C.G.) A 63MW of Thermal Power plant having 3 units respectivaly 33MW& 15*2MW, AFBC Boiler (2*80TPH, 70 TPH) and 135TPH of CFBC Boiler . ...
- 2020 Sep 02
Raipur, Chhattisgarh, India
... Key Responsibilities: - My Job responsibility is overall maintenance of field instruments and calibration of control valves, motorized valves, pneumatic valves & plc system of 12MW Thermal Power Plant having coal AFBC CVPL make Boiler, and SIEMENS ...
- 2020 Aug 06
Raipur, Chhattisgarh, India
... Bhilai Shri Rawatpura Sarkar Institute Of Technology Raipur (CG) 74.3% 2013 WORKING EXPERIENCE 1 Year Working Experience As a GET (85 MW Power Plant-Boiler Operation/Maintenance) In SKS Ispat & Power Ltd, Raipur (CG) From January 2014 to December ...
- 2020 Aug 05
Raipur, Chhattisgarh, India
... com Objective: Chemistry-related working experience & good knowledge with a preference for large power plant water steam cycle management, operational power plant chemistry and water treatment in Large Power plant Boiler (High Pressure Boiler). ...
- 2020 Jul 29
Raipur, Chhattisgarh, India
... Executive 23/01/2012 to Present Boiler Operation 2 DVC Raghunathpur Thermal Power Plant (RTPP) Raghunathpur (WB) Executive January 2014 Boiler Commissioning 3 Rosa Power Supply Company Limited (RPSCL) Shahjahanpur (UP) Junior Executive Trainee 12/03 ...
- 2020 Jul 21
Bhilai, Chhattisgarh, India
... In CPP(Captive Power Plant): Worked in 20 MW Captive Plant using AFBC (Atmospheric Fluidized Bed Combustion) Boiler. Knowledge of bearing block, gear box & coupling condition. Preventive maintenance of coal crusher & vibrating screen. In CCS(CLU ...
- 2020 Jul 09
Raipur, Chhattisgarh, India
... Co-ordination with boiler inspector office govt. of Chhattisgarh for boiler registration & other IBR related work. From May 2005 to July 2007 Chhattisgarh Electricity Company Limited Siltara, Raipur (C.G) Overall responsible for shift operation of ...
- 2020 Jun 29
Raipur, Chhattisgarh, India
RESUME DEEPAK KUMAR SAHA BOILER INCHARGE Operation and maintenance department e-mail: adcwic@r.postjobfree.com CAREER OBJECTIVE: - An opportunity is sought to enhance the skill and knowledge through learning Ans use my ability and perseverance in ...
- 2020 Apr 21