Power Plant Industrial Training

Location:
Raipur, Chhattisgarh, India
Posted:
August 06, 2020

Contact this candidate

Resume:

AJAY SINGH YADAV

Phone: 090********(M),

E-Mail: ade41c@r.postjobfree.com

PROFESSIONAL SNAPSHOTS

A result oriented professional with more than 8 years of proven success in Power Plant

Maintenance, Control, Planning and Scheduling, of field Instruments, & DCS.

Expertise in leading large work force to complete job assigned within time schedule and with highest quality, maintaining safety throughout.

1. Serving as Engineer (Control & Instrumentation-Power Plant) with ANJANI STEEL & POWER LTD. RAIGARH since Aug.2012 to Till Date.

ORGANIZATIONAL EXPERIENCE

Since Aug.2012 Serving ANJANI STEEL & POWER LTD. RAIGARH. (Control & Instrumentation-Power Plant).

Key Responsibilities: -

My Job responsibility is overall maintenance of field instruments and calibration of control valves, motorized valves, pneumatic valves & plc system of 12MW Thermal Power Plant having coal AFBC CVPL make Boiler, and SIEMENS make turbine and ABB Compact HMI 800 (System Version 8.2) .

Effectively Shooting the Technical problems at site.

Planning & implementing the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipments & machinery.

Ensuring proper operation & maintenance of field instruments for Power Plant.

Monitoring & Follow up of Shutdown/ Breakdown Activities.

Control, Planning and Scheduling, of field Instruments & DCS.

Effectively Shooting the Technical problems at site.

Breakdown analysis and implementation of corrective action.

Coordinating with local vendors to ensure the smooth operation of all facility equipments.

Maintaining documents as per ISO Standard.

JOB KNOWLEDGE AND RESPONSIBILITIES

Calibration and Maintenance of All types of Instruments

like Transmitters, Control Valves, Dampers, Thermocouple & RTD.

Calibration and Maintenance of Pressure & Temperature Gauges.

Calibration of Level, Pressure, Flow & Temperature Transmitter Make – ABB,

Rosemount.

Setting Rising & Falling Point of Pressure Switch Make – Indfos & Switzer.

Installation & Setting of Instrument for measuring Vibration, Speed & Axial Shift of Rotor.

DCS panel Module assembling and control wiring in ABB.

O & M of electrical systems for 35 TPH, 67Kg /cm2 water tube Boiler & Turbine auxiliaries.

PLC panel assembling & control wiring in ALLEN BREDLY & DELTA

Education

Technical Qualification : Diploma (66.2%) 2012 Passed out

Branch : Electronics & Instrumentation Engg.

College : National Institute of Research management & technology

Schooling:

Class X from UP Board (2006)

Class XII from UP Board (2008)

Industrial Training --:

(1).Have done Industrial training at CETPA INFOTECH PVT. LTD. Lucknow (U.P).

Knowledge Preview :

Boiler & Turbine protection systems.

Create purchase indent.

Create Material issue Voucher.

Hard working, confident, ability to blend & learn.

Go-getter attitude with strong desire to excel & achieve.

Flare for interaction & teamwork.

DECLARATION:

I hereby, declare that the above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.

Ajay Singh Yadav Signature of applicant

Place- Raigarh Dated:-



Contact this candidate