|
Resume alert |
Resumes 21 - 30 of 46 |
Patna, Bihar, India
... Thermal Energy Audit.( Boiler, Furnace,cooling tower etc). Energy Audit Report Preparation. Business Development Energy Audit, Marketing of Energy Audit. Energy audit Report preparation & presentation. PREVIOUS ORGANIZATIONS: SWAPAN K DUTTA PE ...
- 2021 Mar 01
Patna, Bihar, India
... INDUSTRIAL TRAINING Title: Summer Training Organization: Patratu Thermal Power Station, Jharkhand Duration: 30 days Key Learnings: Gained knowledge of boiler, cooling tower, turbine, coal crusher and of complete power generation process. IT SKILLS ...
- 2021 Feb 07
Patna, Bihar, India
... Liaison with statutory/regulatory authority for getting statutory approvals: Boiler, Chlorine storage, chief electrical inspector, labor license from labor commissioners etc. Deal with labor force and handle Industrial relations and other related ...
- 2020 Nov 26
Patna, Bihar, India
... of 1*65 TPH CFBC BOILER,1*50TPH AFBC,2*10TPH WHRB experience of BOILER DCS Operation with Boiler Light up Currently working as DCS Engineer in Boiler DCS Operation at SALASER STEEL & POWER Ltd. RAIGARH (C.G.) Capable of defining and enforcing ...
- 2020 Nov 15
Patna, Bihar, India
... I am working as survey in charge on TG Building Boiler,Esp,cooling tower, Chimney & different structure . PROJECT 5:- Employer : L&T Limited. Position held : survey engineer(civil) Project Details: “Bheramara ccpp(360MW) PROJECT 6:- Employer : L&T ...
- 2020 Nov 15
Patna, Bihar, India
... TRAININGS PROJECTS Summer training on study of BOILER and TURBINE at KANTI THERMAL POWER PLANT. Summer training at INDIA GLYCOL LIMITED Final year Project:-FABRICATION OF ABRASIVE JET MACHINE Training in SAP MM MY STRENGHTH:- Quick Learner Problem ...
- 2020 Nov 02
Patna, Bihar, India
... • Responsible for installation of Cable Tray in cable vault, Boiler, TG Building, ESP, CHP, WTP, AHP • Responsible for cable laying & termination of all HT & LT drives like FD & ID Fan, Cooling tower Motor, Stacker reclaimer, CC pump at boiler, ...
- 2020 Sep 19
Patna, Bihar, India
... Duration – 15 Feb 2013 to 14 Feb 2014 Description - 660MW super critical boiler pressure parts. JOB PROFILE: I am proficient in : Boiler Pressure Parts. JOB RESPONSBILITY: Planning, Site execution. Personal Details FATHER’S NAME : RAM PRAVESH PRASAD ...
- 2020 Aug 26
Patna, Bihar, India
... d)Static & Rotary Equipment Installation like Waste Heat Boiler,Steam superheater, Pressure vessel,Flue gas stack, Primary Reformer,Loop waste heat boiler. e) Pipe spool Fabrication of Reformer. f)C.A Duct fabrication & erection. g) Refractory work ...
- 2020 Aug 17
Patna, Bihar, India
... R.S.Singh Jan '19- Ongoing WGC(Weighted Geometric Center) approach for PID tuning of Industrial Boiler An arbitrary inverse model of Boiler was build using Simulink. WGC for different derivative gain were calculated. Unit Step Response of Closed ...
- 2020 Aug 16