To focus upon emerging technologies and trends in industry and acquire expertise to deliver high quality products and services for end-user satisfaction by utilizing consulting skills.

ACADEMIC QUALIFICATION:-

a) Madhyamik (10th ) passed from W.B.B.S.E. with (1st division) in 1997.

b) Higher secondary (10+2) passed from W.B.C.H.S.E. with (2nd division) in 2000.

TECHNICAL QUALIFICATION:-

Diploma in Mechanical Engineering (3years) from Murshidabad Institute of Technology

( W.B.S.C.T.E.)with 1st class in 2005.

CERTIFICATION COURSE:-

ASNT- SNT-TC-1A, Level-ll, MPT,PT,RT&UT From Dona World Technical Training and Certification, Kolkata in 2020 .

TRAINING EXPERIENCE:-

Training in The Bhagirathi Co-op Milk Producers Union Ltd. Feeder Dairy, Berhampore,

Dist-Murshidabad, W.B, Training Duration 01.10.2004 to 15.10.2004(15days).

WORKING EXPERIENCE:-

PRESENT EXPERIENCE :

Presently I am working in L&T Hydrocarbon Engineering Limited Construction Services (LTHE) From 16/04/2019 to till now as Senior Engineer (Mechanical) and my posting is HURL- Sindri Project Site,Jharkhand.

Project Description: It is a consortium EPC project with Technip France and LTHE .Capacity of the Fertilizer Plant is 2200 TPD Ammonia & 3850 TPD Urea. Client-Hindustan Urvarak & Rasayan Limited (HURL) a joint venture by CIL, NTPC, IOCL,FCIL &HFCL.

And PMC is PDIL.

Project Value:2000 Crore

Resposibilities:

a)Supervison of Structure Fabrication, Module Fabrication,Its assembly of REFORMER Area as per L&T Quality Standards.

b)Monitoring Srtucture Grit Blasting & Painting activities.

c)Reformer Area Erection planning & its Executing of Reformer as per our Safety norms & procedures.

d)Static & Rotary Equipment Installation like Waste Heat Boiler,Steam superheater, Pressure vessel,Flue gas stack, Primary Reformer,Loop waste heat boiler.

e) Pipe spool Fabrication of Reformer.

f)C.A Duct fabrication & erection.

g) Refractory work supervision of WHR section and chamber.

PAST EXPERIENCE:

I was working in McNally Bharat Engineering Company Ltd. as an Engineer

Execution (Construction-Mechanical) from 10/12/2009 to 13/04/2019.

COMPANY PROFILE:

McNally Bharat is an EPC Company and its doing Prestigious Project like Material Handling, RMHS, Integrated Steel plant, Process plant, Cement plants, Thermal Power Plants (CHP,AHP),Water Treatment plant, Oil& Gas, Refinery etc in all over India and Abroad.

2nd Project: My 2nd posting is NTPC Bongaigaon, Assam,(3x250 MW Thermal Power Plant, Client-NTPC) in Coal Handling Plant(CHP),Gypsum Handling Plant(GHP)& Lime Handling Plant(LHP) Project.

Project Value:488 Crores.

Responsibilities:

a)Fabrication & Erection of Structures like Crusher House, Transfer Houses, Conveyor Galleries, Structural Silo etc as a Team Leader.

b)Erection of Coal Sampling Unit of Coal Crusher House.

and erection & commissioning of Stacker cum Reclaimer, Wagon Tippler,Tripper Conveyor.

c)Erection &Commissioning of Belt Feeders, Samplers,Chutes,Ring Granulator(Coal Crusher),Vibrating Screen,Gear box, Fluid Coupling and its Motors etc.

d)Erection & Commissioning of DE System Steel Structure and its Equipment like Scrubber, Recirculation Tank, ID Fan etc and its proper alignment and Installation of Ventilation system including ducting, Centrifugal Fan,Exhaust Fan and its commissioning.

e)Site Fabrication of Water Pipe Line for Utility and the areas are CW PipeLine, DS Pipe Line, DFDS Pipe Line,WTDS PipeLine,SPDS PipeLine,Service Water Pipe Line,Flange fitting,Valve Fitting and Its Erection.

f)Installation and Erection of All Pumps and its alignment in Pump Houses.

g)Erection of Technological Structures(Conveyors),its alignment and finally Belt Laying, belt joint and its alignment.

h)Planning of Erection day to day, Proper Manpower Handling of Contractors as per schedule.

i)Checking of Contractor Bill as per executed at site.

j)Making of Measurement Sheets, and RA Client Bills .

k)As project is going on my responsibilities are increases as per Planning.

l)And also take part in Commissioning,Operation & maintenance of CHP.

1st Project: My first posting was S.K.Mines,Rajasthan, Pb-Zn Beneficiation Process Plant(Capacity-2Mtpa),Client- VEDANTA(Formerly Hindustan Zinc Ltd.)

Project Value:281 Crores

Responsibilities:

a) Fabrication of Structures like Colums,Beams,Crane Girders, Conveyor Galleries, Transfer House Structures, Pipe Racks,Tanks etc.

b)Inspection of Fabricated Structures as per drawing, Complete Fabrication as per Planning &Proper Manpower Handling of Contractor.

c) Erection of Structures,Columns, Platforms, Crane girders,Galleries, etc.

d)Erection of Conveyors, Feeders, Chutes .

e)Erection of Equipments like Ball Mill, Rod Mill, Flotation Cells, Cyclones, Installation of Pumps, Motors, Tanks .

f) Doing work in Tailing Disposal pipe line and in Plant Job i.e. Fabrication of Pipes with flanges, Bends, and its erection work.

g) Checking of Contractor Bill as per site executed.

h) And also play role in Commissioning team. At S.K.Mines I was posted there 10/12/2009 To 12/02/2011.

A) I was working as a Project Executive in THERMAL ASSOCIATE PVT LTD from 1st September 2008 to November 2009.

Responsibilities:

a) Site Fabrication of Structures and supply of Accessories.

b)Structure Erection, Equipment installation and commissioning of plant and equipment like industrial Boiler, Thermic Fluid Heater(Thermax Ltd Made).

c) Pollution control equipment like Bag Filter, Dust Collector and its accessories like ID Fan,FD Fan, Centrifugal Fans Installation & commissioning in many Chemical Plants, Plywood Factory, Agro& Beverages .

d) Erection of Structures, Columns, Economiser Structures, Circular Duct,Boiler Drum of two unit . of WHRB Boiler OF 40MW(CHEEMA BOILER LTD. MADE) in BENGAL ENERGY LTD (A Hard Coke Plant) Kharagpur,West Bengal.

Project Value: 20 Crores

B) I was working in Manaksia Ltd,Silvassa Division 3Yrs. as a Junior Engineer in Project Cell from Nov2005 to July 2008.

COMPANY PROFILE:

COMPANY:MANAKSIA LIMITED (An ISO Organisation) Division Crowns, Silvassa. A prime Crown Cap and LDPE supplier of COCA-COLA INDIA, UNITED BREWERIES & other reputed breweries in India.

Responsibilities:

a) Fabrication Steel Structure, Duct,Tanks,Cells,Pipeline and its Erection.

b)Erection of Bag Filter and maintain its running condition.

c)Maintenance of Boiler, Boiler Feed pumps, Heat Exchangers (Thermopac,Thermax Ltd. Made) .

d)And Boiler Shutdown, Overhauling, Steam & Fuel Pipe Line, Water pipe line, valves fittings, erection& maintenance and its associates Equipments for Utility services.

SKILL SETS:

Operating System :- Windows98 & 2000

Software Tools :- Autocad 2006, MS-Word, MS-Excel

PERSONAL DETAILS:

Fathers Name :- Late Mr. Hiren Kumar Das

Date of Birth :- 05. 01. 1981

Nationality :- Indian

Sex :- Male

PERMANENT ADDRESS:

Vill-Guripara, P.O. Azimganj

Dist Murshidabad, Pin-742122,West Bengal (ARNAB DAS)



Contact this candidate