A passionate & dynamic leader with over ** years of experience in achieving business targets around tough business situations using innovative strategy and business acumen. Possesses excellent communication, Business development, Project maintenance & Operation and demonstrated project management skills. Professionally qualified with extensive knowledge in Execution of Rural Electrification Project, Substation up to 400 KV, Thermal Power Plant Cabling & Lighting packages. An inspiring and motivational team person with interpersonal skills, ability and passion to develop the vision of company. Ability to push performance improvement whilst at the same time delivering growth.
• Process optimization
• Cost control
• Strategic Planning
• Inventory management
• Staff development
• Quality assurance
• Policy Improvement
• Team Leadership
• Performance Reviews
November 2019 – Current
DGM (3 Projects under DDUGJY, Bihar -750 Cr)
Jakson Ltd
Patna, Bihar
• Optimize site process to ensure high team performance.
• Determined the project schedule which included the sequence of all construction activities.
• Define employee functions and keep individuals on task.
• Determine areas of improvement for cost control and initiate changes.
• Implement safety policies to reduce or eliminate incidents. October 2018 – October 2019
Execution Head of SAUBHAGYA, UP under MVVNL of 3 District (Badaun, Bareilly &Pilibhit) -621 Cr) Bajaj Electricals Ltd
Bareilly, UP
• Maximize efficiency of administrative process by completing paper work in a timely manner.
• Work with team members to increase individual performance and set realistic improvement goals.
• Reduce expenses by minimizing waste and allocating staff levels correctly.
• Provided safety kits to all construction personnel which compiled with safety protocols for the job site.
• Conducted routine quality audits to ensure that the work was progressing per the specifications and initiated corrective actions.
August 2017 – September 2018
Chief Project Manager (DDUGJY 12th plan inclusive of 11 Nos new and 16 Nos Augmentation PSS under SBPDCL-179 Cr) Bajaj Electricals Ltd
Gaya, Bihar
• Reviewed plans & specs during the schematic design of pre-construction. DGM
Phone:+917*********/+919*********
Email:***********@*****.***
SNEHASIS MAITY
PROFILE
SKILLS
WORK EXPERIENCE
• Performed regular job site observations to provide direction for all general contractor personnel.
• Conducted weekly contractor meetings, which facilitated stronger communication and the ability to resolve the critical issues.
• Determined the project schedule which included the sequence of all construction activities.
• Provided safety kits to all construction personnel which compiled with safety protocols for the job site.
• Conducted routine quality audits to ensure that the work was progressing per the specifications and initiated corrective actions.
• Implemented systems to improve process efficiency and reduce the project duration. September 2014 – July 2017
Senior Manager (DDUGJY 12th plan inclusive of 8 Nos PSS under PGCIL-167 Cr) Bajaj Electricals Ltd
Kushinagar, Uttar Pradesh
• Accountable for the planning, organizing, control and execution of various project activities with micro level to macro level Planning at all levels of Project.
• Performed regular job site observations to provide direction for all general contractor personnel.
• Conducted weekly contractor meetings, which facilitated stronger communication and the ability to resolve the critical issues.
• Determined the project schedule which included the sequence of all construction activities.
• Provided safety kits to all construction personnel which compiled with safety protocols for the job site.
• Conducted routine quality audits to ensure that the work was progressing per the specifications and initiated corrective actions.
January 2012 – August 2014
Project Manager (Electrification of 5 Km radius at NTPC Kahalgaon under NTPC-23 Cr) Bajaj Electricals Ltd
Kahalgaon, Bihar
• Responsible for implementation of Project plan & ensure logical sequencing of plan based on resources.
• Planned resources, Arrangement & Allocation of resources as per project plan. Monitored Construction schedule & highlight anticipated delays/ deviations in advance. Conducted Progress Review meetings at fixed interval.
• Handled Mobilization & Management of Manpower, Material & Machinery as per Management guidelines.
• Accountable for the planning, organizing, control and execution of various project activities with micro level to macro level Planning at all levels of Project.
• Ensured Zero Lost Time Injury at sites by giving safety awareness to the contractors.
• Supervised & managed overall project activities from execution and overall coordination; efficient in project scheduling and resource allocation to maximize operational efficiency; identifying key milestones and forecasting completion timeline.
• Formulated plan to ensure effective construction management, including the control of site progress, resolutions of site problems, control of site meetings etc.
October 2008 – December 2011
Zonal Manager (RGGVY 10th PLAN under NTPC-230 Cr)
Bajaj Electricals Ltd
Murshidabad, West Bengal
• Actively involved in directing Project Management initiatives like defining technical specifications, reporting and documentation, budgeting and cost estimates, commissioning the entire Project under the guidance of Project Manager.
• Ensured optimal utilization of available resources while controlling overhead costs and enhancing productivity.
• Set rates, bills, final bills, payments schedules v/s work schedules, disputes, written communication, with all working contractors and agencies.
• Ensured Zero Lost Time Injury at sites by giving safety awareness to the contractors. August 2007 – September 2008
Project Engineer (Lighting package-1x210 MW Thermal Power Plant under BHEL-15 Cr) Bajaj Electricals Ltd
Korba, Chattishgarh
• Overall technical super vision of execution of electrical project including construction, installation & commissioning of Power Plant Lighting.
• Site Co-ordination, Execution of work as per the Design/Drawing & Quality.
• Make Measurement and Bills of Contractor and its Certification, Planning and executing the Electrical and Utility Installation and commissioning activities.
• Job done as per schedule, monitoring & controlling the contractors.
• Site management according to available material by optimized manner. July 2006 – August 2007
Project Engineer (400/220 KV substation under PGCIL-40 Cr) Crompton Greaves Ltd
Raigarh, Chattishgarh
• Supervise construction activity of 400/220 KV Sub-station including all Towers, Equipment foundations, Cable Trenches, Drains, Firewall, Water Storage Tank, Control Room building, D.G Building Fire Fighting Pump House and internal Roads.
• Installation, testing & commissioning of 315 MVA transformer.
• Managed entire construction activities of the project with accountability to complete entire construction jobs within defined quality, cost and time parameters.
• Drawn/arranged requirements of plant/ equipments, material and labour resources and judiciously making allocations thereof to optimize operational efficiency.
• Overseen formwork and staging arrangements for major structures to ensure safe work.
• Carried out work measurements and prepared/verified Sub contractor bills for remittance as per contract terms. Coordinated with planning engineer & Billing Engineer for timely preparation of client bills. January 2005 – June 2006
Project Engineer (Cabling package-1x210 MW Thermal Power Plant under BHEL-15 Cr) Crompton Greaves Ltd
Unchahar, Uttar Pradesh
• Assist the project head in the preparation of project execution schedule and allocating the resources for the project to ensure successful completion of projects meeting time, quality & cost parameters.
• Installations of all electrical works were carried out as per approve drawings ensuring compliance with safety requirements.
• Responsible for installation of Cable Tray in cable vault, Boiler, TG Building, ESP, CHP, WTP, AHP
• Responsible for cable laying & termination of all HT & LT drives like FD & ID Fan, Cooling tower Motor, Stacker reclaimer, CC pump at boiler, MDBFP, boiler pre heater and others.
• Responsible for HV test of cable
September 2003 – December 2004
Project Engineer (Cabling package-1x500 MW Thermal Power Plant under BHEL-19 Cr) Crompton Greaves Ltd
Ramagundam, Andhra Pradesh
• Assist the project head in the preparation of project execution schedule and allocating the resources for the project to ensure successful completion of projects meeting time, quality & cost parameters.
• Installations of all electrical works were carried out as per approve drawings ensuring compliance with safety requirements.
• Responsible for installation of Cable Tray in cable vault, Boiler, TG Building, ESP, CHP, WTP, AHP
• Responsible for cable laying & termination of all HT & LT drives like FD & ID Fan, Cooling tower Motor, Stacker reclaimer, CC pump at boiler, MDBFP, boiler pre heater and others.
• Responsible for HV test of cable
December 1997 – August 2003
Site Engineer
Fribscon Project India Pvt Ltd & Rajasthan Electric Corporation
• Supervision of erection activity of distribution work like pole erection, stringing, installation and cabling of equipment of 33/11 KV PSS, Installation of motors.
Diploma in Electrical Engineering Graduated, 1997
Jalpaiguri Polytechnic Institute Division 1*
WBSCTE
Jalpaiguri, West Bengal
Bachelor, Physics Graduated, 1994
Uluberia College Division 2
Calcutta University
Howrah, West Bengal
• Word 2010
• Excel 2010
• Power Point 2010
• Hindi
• English
• Bengali
Father’s Name: Late Shri SubhashCh Maity Marital Status: Married Birthday: September 9, 1974 Nationality: Indian
Gender: Male
Present CTC: Rs. 21,00,000/-