Post Job Free

Resume

Sign in

Bolting and Machining Services

Location:
Patna, Bihar, India
Posted:
August 26, 2020

Contact this candidate

Resume:

RESUME

ARUN KUMAR

Email : adflv6@r.postjobfree.com

Mobile: +919*********

B.E. (MECHANICAL)

CAREER OBJECTIVE:

To realize my potential in challenging situations and use my talent in the best of Organization, and develop my capabilities through learning process.

EDUCATION:

• B. Tech. (Mechanical): PCE College, Nagpur, Maharashtra, India.

Project undertaken during b.e (mechanicAL)

Project – SOLAR SPRAYER AND DUST BLOWER MECHANISM.

Computer Intellect

Basics - MS Office XP (Word, PowerPoint)

Internet Knowledge

EXTRACURRICULAR & CO-CURRICULAR ACTIVITIES

Represented College Cricket Team

Worked as EVENT CO-ORDINATOR in the MECHANISM FORUM

Worked as EVENT CO-ORDINATOR in CULTURAL CLUB

Active member of discipline committee of MESA

Strength

Very good at learning

Can work at longer hours

Goal oriented

WORK EXPERIENCE

• CURRENT WORKEING IN GRIPHOLD BOLTING SERVICES PVT. LTD

Duration – 17 Feb 2017 to till Date

JOB PROFILE: Operations Manager.

JOB RESPONSBILITY:

• Techno-commercial discussions, negotiations with customer, order closure and end to end operations management for Bolting and Machining Services.

• Prepare project & procurement schedule, production plan & contract management

• Generate repeat business from existing customers while expanding new customer base.

• Manpower mapping,Selection of Manpower(Skilled or Semi-Skilled), legal compliance, verification and transportation

• End to end finance management and payment follow-ups.

• PROJECT HISTORY

Essar Oil Ltd Shutdown Project

February’17 – March’17

Griphold Bolting Services Pvt. Ltd., Vadodara

Shutdown In Charge

IOCL Panipat Shutdown Project

July’17 – Aug’17

Griphold Bolting Services Pvt. Ltd., Vadodara

Shutdown In Charge

IOCL Barauni

Shutdown Project

July’17 - Sepr’17

Griphold Bolting Services Pvt. Ltd., Vadodara

Shutdown In Charge

Reliance, Jamnagar Infrastructure J3 Plant

Aug’17 – Feb’18

Griphold Bolting Services Pvt. Ltd., Vadodara

Project Management

IOCL Paradip

Shutdown Project

March’18 – April’18

Griphold Bolting Services Pvt. Ltd., Vadodara

Shutdown In Charge

Essar Oil Ltd

Shutdown Project

Nov'18 - Dec'18

Griphold Bolting Services Pvt. Ltd., Vadodara

Shutdown In Charge

IOCL Panipat Shutdown Project

January’19 – February’19

Griphold Bolting Services Pvt. Ltd., Vadodara

Shutdown In Charge

IOCL Barauni

Shutdown Project

Aug’19 - Sepr’19

Griphold Bolting Services Pvt. Ltd., Vadodara

Shutdown In Charge

IOCL Mathura

Shutdown Project

Nov’19 – Dec’19

Griphold Bolting Services Pvt. Ltd., Vadodara

Shutdown In Charge

• EURO MECHANICAL & ELECTRICAL CONTRACTING CO .LLC as a Mechanical Engineer.

Duration – 17 March 2014 to 20 Dec 2016

JOB PROFILE: Integrity Engineer.

JOB RESPONSBILITY:

Project engineering, Site Co-ordination, Maintaining quality control procedures at sites.

Dealing with client and with other departments for the flawless execution of project.

Checking and preparing site reports, Monitoring work progress.

Maintain standard health and safety, Perform risk management to minimize project risks.

Develop detailed project plan, Project scope and objective ensuring technical feasibility.

Use appropriate verification technique to manage changes in project scope, schedule andcost.

Measure project performance using appropriate systems, tools and techniques to track progress.

Engineering data calculations, Design review and rectification, bolted joint calculations to ensure leak free flange joint.

Analyze proper installation of Valves, Equipment, Spools in piping as per P&ID and Isometric drawings in accordance with ANSI B16.5, ASTM, BS, API 6A and 17D, NORSOK L005 Piping and Flange standards.

Manpower mobilization to sites, Manage Tool and Vehicle inventory, Team management.

Assisting operations team in technical recruitment, training and handling visa processing.

PROJECT HISTORY

Project & Site

Duration

Client

Job Role

Musandam Gas Plant - Oman

May’14 – July’14

Halliburton

Client QC Flange Inspection

Dry Dock World-Dubai, SBM Project

March’15 – May’15

Halliburton

Flange Inspection QC Flange Management

Musandam Gas Plant - Oman

June’15 – July’15

Halliburton

Client QC Flange Inspection

GASCO Asab – 0

Shutdown Project

January’16 – February’16

Halliburton

Client QC Flange Inspection

GASCO Asab – 1 & 2 Shutdown Project

April’16

Halliburton

Client QC Flange Inspection

ZADCO Project, Gulf Piping Company

August’16 – December’16

Petrofec & Gulf Piping Company, Abu Dhabi

Flange Management Joint Integrity

• POWER MECH PROJECTS Ltd as a site Engineer

Site – RELIANCE POWER LTD–

6x660 MW SASAN ULTRA MEGA POWER PLANT

SINGRAULI M.P.

Duration – 15 Feb 2013 to 14 Feb 2014

Description - 660MW super critical boiler pressure parts.

JOB PROFILE: I am proficient in : Boiler Pressure Parts.

JOB RESPONSBILITY: Planning, Site execution.

Personal Details

FATHER’S NAME : RAM PRAVESH PRASAD

NATIONALITY : Indian

SEX : Male

DATE OF BIRTH : 11 JULY 1986

MARITAL STATUS : Married

LANGUAGES KNOWN : Hindi, English

PARMANENT ADDRESS : S/O Sri Ram Pravesh prasad

Vishnupuri,kamla niwas

Dist.-patna

Post.- Anishabad

Pin code.- 800002

I hereby declare that all the information given above is true to the best of my knowledge.

[ARUN KUMAR]

Date :



Contact this candidate