RESUME
ARUN KUMAR
Email : *********@*****.***
Mobile: +919*********
B.E. (MECHANICAL)
CAREER OBJECTIVE:
To realize my potential in challenging situations and use my talent in the best of Organization, and develop my capabilities through learning process.
EDUCATION:
• B. Tech. (Mechanical): PCE College, Nagpur, Maharashtra, India.
Project undertaken during b.e (mechanicAL)
Project – SOLAR SPRAYER AND DUST BLOWER MECHANISM.
Computer Intellect
Basics - MS Office XP (Word, PowerPoint)
Internet Knowledge
EXTRACURRICULAR & CO-CURRICULAR ACTIVITIES
Represented College Cricket Team
Worked as EVENT CO-ORDINATOR in the MECHANISM FORUM
Worked as EVENT CO-ORDINATOR in CULTURAL CLUB
Active member of discipline committee of MESA
Strength
Very good at learning
Can work at longer hours
Goal oriented
WORK EXPERIENCE
• CURRENT WORKEING IN GRIPHOLD BOLTING SERVICES PVT. LTD
Duration – 17 Feb 2017 to till Date
JOB PROFILE: Operations Manager.
JOB RESPONSBILITY:
• Techno-commercial discussions, negotiations with customer, order closure and end to end operations management for Bolting and Machining Services.
• Prepare project & procurement schedule, production plan & contract management
• Generate repeat business from existing customers while expanding new customer base.
• Manpower mapping,Selection of Manpower(Skilled or Semi-Skilled), legal compliance, verification and transportation
• End to end finance management and payment follow-ups.
• PROJECT HISTORY
Essar Oil Ltd Shutdown Project
February’17 – March’17
Griphold Bolting Services Pvt. Ltd., Vadodara
Shutdown In Charge
IOCL Panipat Shutdown Project
July’17 – Aug’17
Griphold Bolting Services Pvt. Ltd., Vadodara
Shutdown In Charge
IOCL Barauni
Shutdown Project
July’17 - Sepr’17
Griphold Bolting Services Pvt. Ltd., Vadodara
Shutdown In Charge
Reliance, Jamnagar Infrastructure J3 Plant
Aug’17 – Feb’18
Griphold Bolting Services Pvt. Ltd., Vadodara
Project Management
IOCL Paradip
Shutdown Project
March’18 – April’18
Griphold Bolting Services Pvt. Ltd., Vadodara
Shutdown In Charge
Essar Oil Ltd
Shutdown Project
Nov'18 - Dec'18
Griphold Bolting Services Pvt. Ltd., Vadodara
Shutdown In Charge
IOCL Panipat Shutdown Project
January’19 – February’19
Griphold Bolting Services Pvt. Ltd., Vadodara
Shutdown In Charge
IOCL Barauni
Shutdown Project
Aug’19 - Sepr’19
Griphold Bolting Services Pvt. Ltd., Vadodara
Shutdown In Charge
IOCL Mathura
Shutdown Project
Nov’19 – Dec’19
Griphold Bolting Services Pvt. Ltd., Vadodara
Shutdown In Charge
• EURO MECHANICAL & ELECTRICAL CONTRACTING CO .LLC as a Mechanical Engineer.
Duration – 17 March 2014 to 20 Dec 2016
JOB PROFILE: Integrity Engineer.
JOB RESPONSBILITY:
Project engineering, Site Co-ordination, Maintaining quality control procedures at sites.
Dealing with client and with other departments for the flawless execution of project.
Checking and preparing site reports, Monitoring work progress.
Maintain standard health and safety, Perform risk management to minimize project risks.
Develop detailed project plan, Project scope and objective ensuring technical feasibility.
Use appropriate verification technique to manage changes in project scope, schedule andcost.
Measure project performance using appropriate systems, tools and techniques to track progress.
Engineering data calculations, Design review and rectification, bolted joint calculations to ensure leak free flange joint.
Analyze proper installation of Valves, Equipment, Spools in piping as per P&ID and Isometric drawings in accordance with ANSI B16.5, ASTM, BS, API 6A and 17D, NORSOK L005 Piping and Flange standards.
Manpower mobilization to sites, Manage Tool and Vehicle inventory, Team management.
Assisting operations team in technical recruitment, training and handling visa processing.
PROJECT HISTORY
Project & Site
Duration
Client
Job Role
Musandam Gas Plant - Oman
May’14 – July’14
Halliburton
Client QC Flange Inspection
Dry Dock World-Dubai, SBM Project
March’15 – May’15
Halliburton
Flange Inspection QC Flange Management
Musandam Gas Plant - Oman
June’15 – July’15
Halliburton
Client QC Flange Inspection
GASCO Asab – 0
Shutdown Project
January’16 – February’16
Halliburton
Client QC Flange Inspection
GASCO Asab – 1 & 2 Shutdown Project
April’16
Halliburton
Client QC Flange Inspection
ZADCO Project, Gulf Piping Company
August’16 – December’16
Petrofec & Gulf Piping Company, Abu Dhabi
Flange Management Joint Integrity
• POWER MECH PROJECTS Ltd as a site Engineer
Site – RELIANCE POWER LTD–
6x660 MW SASAN ULTRA MEGA POWER PLANT
SINGRAULI M.P.
Duration – 15 Feb 2013 to 14 Feb 2014
Description - 660MW super critical boiler pressure parts.
JOB PROFILE: I am proficient in : Boiler Pressure Parts.
JOB RESPONSBILITY: Planning, Site execution.
Personal Details
FATHER’S NAME : RAM PRAVESH PRASAD
NATIONALITY : Indian
SEX : Male
DATE OF BIRTH : 11 JULY 1986
MARITAL STATUS : Married
LANGUAGES KNOWN : Hindi, English
PARMANENT ADDRESS : S/O Sri Ram Pravesh prasad
Vishnupuri,kamla niwas
Dist.-patna
Post.- Anishabad
Pin code.- 800002
I hereby declare that all the information given above is true to the best of my knowledge.
[ARUN KUMAR]
Date :