Post Job Free

Boiler resumes in Madhya Pradesh, India

Sign in
Search for: Jobs   Resumes


Resume alert Resumes 21 - 30 of 55

Operator Power

Jabalpur, MP, India
... I know the work of all types of Fittings of Boiler, operation and maintenance, DM Plant. Operation work (M/sION Exchange). 1. W.E.F. 20.08.07 TO 06.03.08 As Boiler Operator 2nd class 8 M.W. NIRAJ POWER PLANTS, SIMGA (RAIPUR) Boiler - 35 Tons. ... - 2017 Dec 06

Power Plant Engineer

MP, 484117, India
... Working as Boiler DCS (ENGINEER) Operation in Shree Nakoda Ispat Ltd.Siltra Raipur C.G. Power Plant division 70 TPH CFBC boiler from 2 september 2017 to till date 2. Worked as (Graduate Engineer Trainee) operation in shree Nakoda ispat ltd,siltra ... - 2017 Oct 28

Mechanical Engineer Plant

Bhopal, MP, India
... Engineer Institute : Government polytechnic pachor (M.P.) Year of passing : JUNE 1998 Special certificate : Boiler Operation Engineer(BOE) Certificate Year Of passing : 2015 Boiler Board : Andhra Pradesh ACADAMIC QUALIFICATION: 12th in P.C.M. ... - 2017 Oct 17

Power Plant Water Treatment

Bhopal, MP, India
... Complete Treatment of Raw of water, Cooling Water, Waste Water, Feed Water and Boiler Water. Complete Analysis of Raw Water, Cooling Water, Waste Water, Boiler Water, Feed Water & C.S.T. Water. Analysis of water preparation of testing reagents for ... - 2017 Oct 15

Power Plant Mechanical Engineering

MP, India
... Having knowledge of Boiler Auxiliaries, Turbine auxiliary & Coal Handling plant . Involved in the operation of AFBC boiler (2x135tph, 1x54tph) as DCS Engineer with DCS Control system (SIEMENS SPPA T1000 SOFTOM ). Monitoring & watch out all the ... - 2017 Jun 29

Engineer Design

Bhopal, MP, India
... Supervision of preventive maintenance of machines (Press machines, Boiler, Resin kettle) Nesting work to calculate the number of boards require for the particular product. Communication with the customer for the drawing clarification. On-line ... - 2017 Jun 19

Power Plant Project

MP, 482002, India
... Project Title :- Boiler study Duration :-30 days Scholastic Achievements: Some more certificate earn in community function. Civil Defence cops Emergence Service Jabalpur 2015-2018. Computer Knowledge: Basics of computer Fundamental Co-Extra ... - 2017 May 13

Engineer Power Plant

Chhindwara, MP, 480001, India
... Hands on Electronics Engineer with over 3 years experience in process control instrumentation of Boiler, Turbine and bop area SKILLS PLC SCADA INSTRUMENTS PROCESS CONTROL MOTORS AUTOMATION WORK HISTORY JR ENGINEER (12/2012 TO 12/2013) INDIABULLS ... - 2017 May 06

Power Plant Operator

Gwalior, MP, India
... *, Rajendra Nagar, Orai, Dist.- Jalaun (UP) 285001 +91-882******* Language Known- English, Hindi & Punjabi Email- acz3vb@r.postjobfree.com EDUCATION Post Graduate Diploma in Computer Ist Class water tube Boiler Certificate (Indian Boiler Rule) M.Sc. ... - 2017 May 02

Project Power Plant

MP, India
... Thermal power project of 2 x 15 MW and 1 x33 MW Installation, Erection & Commissioning of Thermal power plant project (78 MW) & 135 TPH Boiler also works in Coal side scraper & Reclaimed &CHP Actively involved in erection of all the equipment ... - 2017 Apr 17
Previous 1 2 3 4 5 6 Next