Singrauli, MP, India
... Designation: - Field operator (operation) Duration: - From 31/05/2015 to 03/11/2017 Worked: - Site Of Mahan Working area of power plant Field operation:- BTG area COMISSIONING :- Boiler & turbine 2 600 mw in essar power m.p.ltd DURATION:- 01/03/2017 ...
- 2018 Jun 03
Amlai, MP, India
... SHAHDOL (M.P ) ] Designation BOILER & TURBINE DCS ENGINEER Capacity of Power Generation 1 25MW, 1 30MW = 55MW Type of Boiler THERMAX AFBC BOILER (150 TON) Turbine SIEMENS STEM TURBINE ( 17 STAGE INPULS AND REACTION TURBINE) Roles and ...
- 2018 May 20
Jabalpur, MP, India
RESUME Mechanical engineer Boiler &utility Arjun Kushwaha ***/**, ******* ***** Naini, Allahabad (U.P.) Pin Code- 211008 Phone: 769-***-**** ac5gin@r.postjobfree.com Career Objective Seeking the position of a boiler plant operator in an established ...
- 2018 May 15
Indore, MP, India
... Responsible to carry out trouble shooting of equipment such as CFBC Boiler, Turbine Pumps, Fans, etc. • Responsible to carry out various maintenance works during shifts and take care of plant emergencies. • Responsible to collect data and analyze ...
- 2018 May 01
Satna, MP, India
... The company engaged in power generation & having the generation capacity of 30 MW (CFBC BOILER) vDesignation : Jr.engg (DCS ) vCompany : Nirmax Cement (Nirma Power Ltd.) vBoiler : WHRB vMake : ISGEC Heavy Engineering Ltd. vTurbine : HTC (China) ...
- 2018 Mar 26
Pali Birsinghpur, MP, India
... Client Company -: M/s Bharat Heavy Electricals Limited 2x125 MW (CFBC Boiler). Sept’ 2008 to June’ 2009 with M/s S.M. Craft Engineering, as a Store Keeper. Client Company -: Gujarat Electrical Board, Ukai Thermal Power Station 1x500 Vertical Boiler ...
- 2018 Mar 10
MP, India
... Water Analysis & Boiler ETP, WTP, Membrane and PAC Plant etc are more working knowledge. IIIrd WORK EXPERIENCES I am working as Lab Analyst (Express Lab/ DM Plant) at singrauli super thermal power station Shaktinagar (through contract) since 05- 07 ...
- 2018 Mar 06
Indore, MP, India
BOILER OPERATION ENGINEER (BOE Chhattisgarh) e-mail . ac4iuo@r.postjobfree.com,ac4iuo@r.postjobfree.com Mobile : +91-982*******, 700******* APPLIED POST Suitable post in your organization. EXPERIENCES 9.6 year of rich experience in strategic ...
- 2018 Feb 18
O.F.Khamaria, MP, India
... NAME OF THE PROJECTS: QA/QC services for Power PROJECT of A.P.,Nellore District (Pressure parts, Boiler structure, Coal pulverizer(Bunker),Rotary Parts, Critical Piping in power plant.) and Structural Works, power plant construction in Nellore, ...
- 2018 Feb 11
Rewa, MP, India
... Paraffin & Alumina Hydrate ENVIRONMENTAL JOB Stack (Boiler Stack) Monitoring. Ambient Air Monitoring. (A) Total Suspended Particulate Matter (B) Less than 10 & 2.5 Micron particulate Matter. (C) Sox & Nox Monitoring (D) CO Monitoring. Noise ...
- 2018 Feb 10