|
Resume alert |
Resumes 51 - 60 of 109 |
Katy, TX
... Process Engineer Aker Solutions Houston, TX 06/2008 – 09/2011 Front-End-Engineering-Design package (FEED) of petrochemical production project for DOW/ARAMCO at Ras Tanura, KSA and coal-to-liquids (CTL) project for DKRW in Wyoming, which is through ...
- 2016 May 27
Katy, TX
... Feb 2010 – July 2012 Aramco Services Projects Support Analyst • Optimized ERP, P2P, SRM, CRM, ERP, OCM processes, tested solutions, SDLC (Ariba, Skire, etc). • Negotiated with suppliers. SharePoint configuration for the project, site provisioning, ...
- 2016 May 24
Katy, TX
... ARAMCO-TECNICAS REUNIDAS GULF - Hawiyah, Saudí Arabia (Mar 2008 - Feb. 2010) Field Supervisor, Gas Plant Expansion Project Documents Manager for review, modify and maintain updated documents to integrate new plant with the existing one, as well ...
- 2016 Apr 21
Richmond, TX
... Interacted with key decision makers of major multinational clients including Shell, Exxon, DOW Chemical, Hoechst Celanese, Citgo, BP, and ARAMCO. Key Achievements: Developed a ground-breaking marketing strategy that penetrated DOW Electrical and ...
- 2016 Mar 13
Katy, TX
... promoted new system to Aramco during 4-year assignment Education 1998 MS Environmental Science University of Texas at San Antonio 1994 MBA Our Lady of the Lake University, San Antonio 1975 BS Geology Southern Methodist University, Dallas
- 2016 Jan 17
Katy, TX
... Financial Analyst/Advisor: Aramco Services Company 1996- 2004 (Industrial Relation Department), Houston I was the right hand to the IR Managers coming from Arabia for rotational three years assignment. I developed the IR Budget and the five-year ...
- 2016 Jan 15
Katy, TX
... Pipe Designer II – Shaw Group, Houston, TX 2008 – 2010 International Projects: Ras Tanura – VGO, Aramco and Dow Chemical JV, Saudi Arabia (2009) Generated extended basic engineering package with plot plan, utility drawings, fire protection, 3D model ...
- 2015 Nov 23
Houston, TX, 77056
... Construction Project Manager – ARAMCO Ras Al-Khair gas separation plant including major improvement of environmental and safety systems, updating control systems, expanding sub- station and updating electrical system throughout plant. TIC $75M. ...
- 2015 Jul 09
Sugar Land, TX, 77478
... -Led plant visits and engage with potential US suppliers and manufacturers to see if they can meet any of the noted requirements on the Aramco Services Company North America sourcing list or requirements for SABIC, Saudi Electricity and/or other ...
- 2015 Jun 22
Rosenberg, TX
... Some of the problems I dealt with included pipe lying off a thousand foot escarpment, having to making complex tie-ins in the bay at low tide, pigging and testing activities on a forty year old pipeline, QA/QC management, and liaison with Aramco. ...
- 2014 Sep 03