Distance: |
Resume alert |
Resumes 121 - 130 of 147 |
Doha, Qatar
... Inspection and witness pre-commissioning of MV switchgear (ABB) with SACE draw-out type Vacuum circuit breakers. Coordinates with supervisors and foremen if not according to client’s specifications (IEC/IEE) details and drawings to avoid punch list ...
- 2018 Jul 16
Doha, Qatar
... Saudi Arabia Key Accomplishments with ASG: Awarded an experience certificate from ABB (Saudi Sadelmi- SST) the main contractor of Al Jawf Power Plant Extension, for execution and administration the works with high quality and in a smooth manner. ...
- 2018 May 31
Doha, Qatar
... Pumping facilities to handle 525000 m3/hr with 27 no’s of mixed flow centrifugal pumps (Ebara -Japan)) driven by Variable Speed Drives (ABB Motors, 7.5MW) of 45000 m3 capacity at 48 meter diff head each, Electro chlorination package of 300 m3/hr ...
- 2018 May 20
Doha, Qatar
... Cable laying,termination and loop checking associated with plant commissioning,configuration of Ratio controllers,ABB PLC and PID controllers. Maintenance of Nitrogen Plant,Air compressor and ETP,Prepare & Submit Daily Progress reports.Analyze and ...
- 2018 May 19
Doha, Qatar
... • Electrical Ariel Bundle Cable training granted by USAID & IRG Electrical software for designing and verification: • ElectricalOM BS7671 (For Designing, Calculation & Verification) • ABB Software • Ecodial Advance Calculation (Schneider Electric) • ...
- 2018 Feb 09
Qatar
... level Electrical maintenance of 5MW 6.6KV EDG’s & 1.25MW 415V EDG’s Electrical maintenance of 33KV GIS,11KV,6.6KV,690V,415V ABB MNS/MCS/ZS1/ZX2 & KIRLOSKER,SIEMENS switch gears Electrical maintenance of 11KV & 6.6KV HV ABB motors and 690V,415V,230V ...
- 2017 Nov 08
Doha, Qatar
... (Medium Voltage) Aug’15 – Present Q-Tec Switchgear W.L.L (ABB Channel Partner) Switchgear Division, Doha State of Qatar Key Result Areas Managing the design and development of series panels for 11 kV Medium Voltage Switchgear Indoor Panel. ...
- 2017 Sep 15
Doha, Qatar
... (Completed Training of BASIC FOUNDATION FIELDBUS.) •Check Configuration of GWR AND MAGNETROLL with EX LAPTOP ●Calibration I/P Converter make of FISHER, ROSEMOUNT and ABB. ●Work with FLOWSERVE, METSO, FISHER, SIEMENS POSITIONER ●Work on the ...
- 2017 Sep 04
Doha, Qatar
... ABB Internship Program, 07/2012 - 08/2012 Communications Department Duties: Importance of internal communication that lead to increase employees’ awareness & understanding on ABB’s vision, mission & business objectives and to engage employees to the ...
- 2017 Mar 04
Doha, Qatar
... ABB Internship Program, 07/2012 - 08/2012 Communications Department Duties: Importance of internal communication that lead to increase employees’ awareness & understanding on ABB’s vision, mission & business objectives and to engage employees to the ...
- 2016 Dec 07