ELECTRICAL / INSTRUMENTATION TECHNICIAN
EDUCATION
SUMMARY OF EXPERIENCE
POSITION APPLIED
“Seeking employment as an
ELECTRICAL / INSTRUMENTATION TECHNICIAN with a
qualified company in order to help boost the company with my own expertise and experiences.”
OBJECTIVE
Electrical / Instrumentation Technician in Qatar Fuel WOQOD and LPG bottling plant.
Hands-on experience in maintenance of Electrical / Instrument in Arabian Agricultural Services Company, (ARASCO). K.S.A. Hands-on experience in quality control inspection of instrument and electrical installation in ARAMCO Juaymah Gas plant, ARAMCO Rastanura Refinery, ARAMCO Shedgun Gas Plant and Saudi Chevron Petrochemical Plant K.S.A.
Electrical / Instrumentation Technician in Dynarabia Co. Ltd., Al-Nafa Maintenance Services under Royal Commission O & M Sea Water Cooling System Plant and Daewoo Arabia Ltd. K.S.A. Project: Saudi Aramco Shedgum Gas Plant
• 13 years
• 1 year
• 3 years
• 5 years
PERSONAL INFO
Address
Civil Status
Mobile no.
Tel. no.
E-mail:
MR. TARIQ HAMDUMLAY
Instrument Maintenance Engineer,
Asset Integrity Department
Qatar Fuel (WOQOD)
Mob. no. : +974-****-****
MR. ALTA FHUSEN AHMED BHAI
Electrical Maintenance Engineer
Asset Integrity Department
Qatar Fuel (WOQOD)
LPG Plant
Mob. no. : +974-****-****
Villa #17 Al-Mughira Bin
Al-Harith St., Al-Hilal,
Doha-Qatar
Married
**********@*****.***.**
TRAINING AND SEMINAR
- BLS / AED and first Aid
- Authorized gas testing
- Fire Awareness Course
- EMS-IT Awareness Training
- CMX calibration management software, MC5P
Calibrator and FB field temperature block.
- EXP02R300-Experion Server Engineering &
Configuration
- CMTR-201 Introduction to Vibration Analysis
- CMXA 50 Microlog (Vibration Analyser) Traning
- Machine Analyst Vibration Analysis Software
Training
- Saudi Aramco Southern Area PMT member or of
the Switchover /Commissioning Team for the
Control system Upgrade of Shedgum Gas Plant.
- Part of achieving 5 MILLIONS Safe Manhours –
Kemya Olefins Project.
February 2017
August 2016
March 2016
July 2013
February 2012
January 2010
November 2005
December 2005
December 2005
December 1996-1997
January 2000
Certificate in Industrial Electricity
Technical Education and Skills
Developments Authority (TESDA)
Talisay City, Negros Occidental, Philippines
REFERENCE
IGNATIUS REY S. CALIBO
WORK EXPEREINCE
Perform Maintenance in WOQOD DEPOT and LPG Bottling Plant (KOSAN CRISPLANT) on the equipment such as; Temperature transmitter, Level Trans- mitter, Pressure transmitter, Flow transmitter, Tank Radar REX (RTG 3930) Emergency Shutdown Valve ESD and Motorize Operating Valve MOV, Online the instrument through DCS, IPS, and Functional test. Instrument Equipment Using for the calibration of the following: Beamex Multi- function Calibration, Deadweight, Multi meter, Decade Box, Druck Pump, High Draulic Pressure Pump, Current Simulator, Temperature Calibrator. Monitoring and measuring deficiencies of process control instruments such as; temperature control indicators, vibration monitoring shutdown, miscellaneous alarms, emergency shutdown and process pressure gauge. Coordinates with instrument engineer regarding breakdown and all the corrective instrument date taken in written reports. Replace defective instruments such as; solenoid valves, directional control valve, heaters, pneumatic cylinder, limit switches, pump sensors, conveyor belt speed monitoring sensor
Disassembled, reassembled, inspected pneumatic cylinder and electronic valve. Preventive Maintenance of Woqod Depot and Sidra Petrol Stations for Fire and Gas System, Smoke detectors, Heat detectors, Manual Call Point, Fire and Gas Panel NOTIFIER by Honeywell, VESDA System, KIDDIE FM200 Gas Suppression System and functional test of Diesel Fire Pump Motor and Electric Fire Pump Motor, Flame Detectors.
Daily routine inspection of all designated electrical and instrument equipment in the plant to maintain good condition and make service report for the damaged equipments.
•
•
•
•
•
•
•
•
Troubleshooting and calibrating of defective instruments such as; timer delay relays. pressure switches, solenoid valve, limit switches, flow transmitter, pressure transmitter, level transmitter, temperature transmitter, flow control valve and PLC system.
Monitoring and measuring deficiencies of process control instruments such as; temperature control indicators, vibration monitoring shutdown, miscellaneous alarms, emergency shutdown and process pressure gauge. Coordinates with instrument engineer regarding breakdown and all the corrective instrument date taken in written reports. Replace defective instruments such as; solenoid valves, directional control valve, heaters, pneumatic cylinder, limit switches, pump sensors, conveyor belt speed monitoring sensor and time delay relays. Reading P&ID loop schematic and safety interlocks on: fire and gas system, emergency shutdown valve (ESD), electric pump motor’s air compressor system heaters. Timer delay relays.
Daily routine inspection of all designated electrical and instrument equipment in the silo plant to maintain good condition and make service report for the damaged equipment.
•
•
•
•
•
•
ELECTRICAL AND
INSTRUMENTATION TECHNICIAN
Qatar Fuel-Woqod Depot
Abu Hamour, Doha - Qatar
LPG Bottling Plant
New Industrial Area, Doha - Qatar
June 2005 up to March 2018
ELECTRICAL AND
INSTRUMENTATION TECHNICIAN
Arabian Agricultural Service Company
Dammam, K.S.A
February 2003 to May 2004.
WORK EXPEREINCE
Inspection and witness CUTOVER period ensuring the work is done according to quality plan. Daily site surveillance of electrical and instrument works which are in progress, checking if construction is working according to client’s specification (IEC and BS standards), details, drawings and project’s quality plan. Preparation of surveillance, inspection reports and submits to construction for action. Inspection and witness pre-commissioning of MV switchgear (ABB) with SACE draw-out type Vacuum circuit breakers. Coordinates with supervisors and foremen if not according to client’s specifications (IEC/IEE) details and drawings to avoid punch list items.
Responsible for the ITP packages and handover packages for electrical works for the project. Preparation of surveillance and inspection reports to QEIL database and issue to construction. Preliminary inspection of electrical works together with Contractor’s inspector for any changes in location and prepares punch list items.
Ensuring compliance with Saudi Arabia Kent quality project program and the requirement of ISO-9000. Ensuring that all installations have been carried out as per project’s specifications and standards. Prepares final RFI and submits to Contractor.
Ensuring that drawings are approved for construction. Carrying out inspection of materials to make sure it meets the requirements of project specifications. Maintaining all test documents for internal quality audits in accordance. Ensuring that the non-conformities, inspection records and outstanding issues are checked for completeness and signed off to proceed to final inspection.
Ensuring that a proper client relationship is maintained throughout the project. Daily site surveillance of instrument works which are in progress. Checking if construction is working according to client’s specifications, details and drawing.
Responsible for the instrument loop package and hand-over packages for instrument works in the project. Inspection and witness pre-commissioning of instrument testing.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
E & I QA / QC INSPECTOR
Saudi Arabian Kent Company, Ltd. K.S.A.
May 1998 to April 2002
PROJECTS:
November 2001 to April 2002 Yanbu, K.S.A.
October 2000 to July 2001 Peremba Kents Bahrain Company August 1999 to May 2000 Kemya Olefins, K.S.A.
May 1998 to August 1999 Saudi Chevron Petrochemical K.S.A. Replace defective machine parts such as solenoid (Directional Control Valve) heaters, hydraulic and pneumatic cylinder, pump sensors, motors, valve coupling, chain, shaft, gear and others. Interpreted contract plants and specifications: one-line diagrams. Cable and conduit schematics and wiring diagrams. Installed LV / MV cables tray, conduit pipes electrical and instrument field JB’s. Instrument field support and fixing instru- ment / electrical equipments tag’s.
Installing and glading for all type of cables and cables termination (meggering cables and loop checking and test continuity of instrument cables from field to control room marshalling panel. Field installation work of: flow transmitter, pressure transmitter, level transmitter, temperature transmitter, pressure switches, pressure differencial switch, pressure gauge, Emergency Shutdown Valve (ESD), Monorize Operating Valve (MOV), gas detections, Flow Control Valve(FCV), instrument process tubing and instrument air tubing. Pre-commissioning and commissioning start-up of Motorize Operating Valve (MOV), Emergency Shutdown Valve (ESV). Commissioning and start-up motor’s (AC and DC) lighting systems (Normal and emergency floodlights) Calibration / Pre-commssioning and commissioning of flow transmitter pressure transmitter, level transmitter, temperature transmitter, pressure transmitter, pressure switches, pressure differencial switch, emergency and shutdown valve and Monorize Operating Valve (MOV), gas detections, Flow Control Valve (FCV) all instrument system throught DCS. Worked with various types of cableways conduits and others electrical raceways. Installed new DCS and PLC cabinets.
•
•
•
•
•
•
•
•
•
PROJECT:
Saudi Aramco Shedgum Gas Plant
CSR field installation project, Phase II
Contract no. 45408 / 00
ELECTRICAL AND
INSTRUMENTATION TECHNICIAN
Daewoo Arabia, Ltd. K.S.A.
May 1996 to February 1998
WORK EXPEREINCE
Preventive maintenance for Fire and Gas System, Smoke detectos, Heat detectors, Manual Call Point and Fire and Gas Panel and funtional test of Diesel Fire Pump motors and Electric Fire Pump Motors.
Daily monitoring records the ultrasonic flow metter and checking the signal for flow transducer.
Preventive maintenance for Gas Turbine System, Salt Water Chlorination Plant System, Fire and Gas System and Air Compressor System. Annual records and checking for the cathodic protection . Daily routine inspection of all designated electrical and instrument equipment in the plant to maintain good condition and make service report for the damaged equipments.
Conduct weekly test run the gas turbine.
Prepares evaluates and submits technical reports on status of plant equipments and others related routine preventive maintenance.
•
•
•
•
•
•
•
•
PROJECT:
O & M Seawater Cooling System under
Royal Commissioning Plant Jubail, K.S.A.
ELECTRICAL AND
INSTRUMENTATION TECHNICIAN
Dynarabia Company, Ltd.
Contract No. 380-S04
September 1991 - February 1993
Al Nafa Maintenance and Service
Contract No. 380-S05
February 1993 - December 1994