Post Job Free

Coal resumes in Vijayawada, Andhra Pradesh, India

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 21 - 29 of 29

Technical Service engineer

Vijayawada, Andhra Pradesh, India
... A 2week Internship in “RASHTRIYA ISPAT NIGAM LIMITED” Vishakhapatnam Steel Plant Technical Training Institute in the department of “Coke Ovens & Coal Chemical Plant”. A 4week Internship in “SOUTH CENTRAL RAILWAY WOMEN`S WELFARE ORGANISATION”, ... - 2019 Aug 14

Engineer Mechanical

Vijayawada, Andhra Pradesh, India
... Experience of working in Rotary kiln, cooler, coal mill Iam started my career as Graduated engineer trainee. in mancheriyal cement limited in mancheriyal, adilabad (dist), TS. CURRICULUM VITAE. ac53zq@r.postjobfree.com N.NageswarRao CELL NOs: +919** ... - 2018 Jul 02

Manager Engineer

Guntur, AP, India
... as Plant engineer–Projects, Erection and Commissioning of coal screening plant, Boom scrapper and truck loaders. Work Experience 4: Sathavahana Ispat Ltd., ANDHRAPRADESH JUNE 2005 to SEP 2007. As Dy.Manager –Projects. Fabrication, Erection & ... - 2018 May 22

Engineer Project

Guntur, AP, India
... Mini project on 1.Raw coal mills (From VTPS PowerPlant). 2.”speed control D.C Motor” With Pulse Width modulation. Tools& technology : Text books & utilization of Cyber space. Role : Designing and analysis of project. PROJECT SEMINAR : 4G Technology ... - 2018 Apr 24

Engineer Civil Engineering

AP, 522213, India
... In order to improve the strength of concrete different admixtures and recycled materials can be used along with normal concrete, this project is to compare the Relative Strength of Concrete with Fly ash (obtained during combustion of coal’s mineral ... - 2016 May 08

Power Plant Maintenance

Vijayawada, AP, India
... HR for Non HR Commissioned 220 KV switchyard, Boiler, Turbine generator, Mentor Mentoring Generator HV/LV Transformer and offsite equipments - Coal Six -Sigma by Wipro Handling Plant,Ash handling, DG sets, cooling towers, TPM training PCC's & MCC's. ... - 2014 Aug 30

Engineer Power Plant

Vijayawada, AP, India
... Preparing shift activity reports, daily plant generation and coal, bed material consumption details. . Preparing permits during shut down. Following up mechanical and electrical isolations & ensuring safety measures during activities. . Identifying ... - 2014 Feb 11

Project High School

Vijayawada, AP, India
... EXPOSURE: • Short term training in Lakshmi paper mill pvt.ltd in Medapadu: How pulp been extracted and is been converted to paper is observed Vijayawada Thermal Power Station in Ibrahimpatnam: How the power is • transmitted using coal is observed. ... - 2013 Aug 24

Project Technical

Vijayawada, AP, India
... Description: The main theme of our project is high grade coal is separated from the low grade coal by the process of floating technique thus density of slurry is calculated with the help of an RDG. This is given as an analog input to BL2100 ... - 2013 Jul 31
Previous 1 2 3