|
Resume alert |
Resumes 1 - 8 of 8 |
Visakhapatnam, Andhra Pradesh, India
... Antifreeze switch and adjustment of switch.* Replacement of Dryer `Y' strainer, Expansion valves post strainer and chiller condenser water pump gland, coupling rubber, V-belt and Air purch.* Good knowledge of Electronics control system.* I have also ...
- 2023 Feb 28
Visakhapatnam Urban, Andhra Pradesh, India
... c) Belt conveyors (Rubber belt and metal belt). 10) MAINTENANCE AND REPAIR JOBS OF FOLLOWING EQUIPMENTS a) Dryer b) Columns c) Rotary vacuum filters d) Agitators STATIC EQUIPMENTS 1) HEAT EXCHANGERS a.Shell and Tube type Dismantling, Leak checking, ...
- 2022 Jun 29
Visakhapatnam, Andhra Pradesh, India
... Major: Alternate materials for the construction of pavement To replace the regular coarse aggregate material of pavement with reusable materials like Reclaimed aggregate, Ceramic waste, Construction & Demolition waste, Rubber waste, Iron slag etc. ...
- 2021 May 06
Visakhapatnam, Andhra Pradesh, India
... Condition assessment of rubber lined vessels, tanks and piping using Spark testing and Shore hardness measurement. Hardness measurement of various machine components. Dynamic and insitu-balancing of various type of rotors and impellers of pumps, ...
- 2020 Jul 15
Visakhapatnam, Andhra Pradesh, India
... • Visited ‘Rubber Dam’ in Parvathipuram, Andhra Pradesh as a part of industrial tour. • Participated in model making, conducted by "NIRMAAN" - Organized under the aegis of Institute of Engineers in college. • Canvassing and executive member of ...
- 2020 Mar 14
Visakhapatnam, Andhra Pradesh, India
... Rubber Band Powered Glider, IIT Madras 2016. Nuclear energy and future perspective in Indian context at ANITS. AWARDS AND ACHIEVEMENTS High School Cricket team Captain for year 2010-2011. Received an award in Concentrix Daksh Service. STRENGTHS ...
- 2019 Dec 26
Visakhapatnam, 530001, India
... 18.Reviewing of radiography films, thickness gauging,hull survey reports, rubber sample(Hardness test) and material analysis reports as per the DEF/IS standards. 19.Coordinate with the client and sub-contractors representative on daily basis to ...
- 2016 Apr 15
Visakhapatnam, AP, India
... Process involved for tyre retreading is Primary Inspection, Buffing, Rasping, Repair Section, Coating and Application of rubber, Post cure inspection, Pre delivery inspection and Trimming and Painting. It’s a low volume production industry with ...
- 2015 Feb 04