|
Resume alert |
Resumes 41 - 50 of 133 |
Ain Khaled, Al Rayyan Municipality, Qatar
... High Rise Building November 7, 2014 – Doha Qatar • Seminar on Overview of Essential Electrical System for Hospitals • Gas Turbine Combined Cycle Power System • Basics of LED and the Application of LED Lighting June 06, 2014 – Doha Qatar • Seminar on ...
- 2022 Feb 28
Al Dafna, Qatar
... For the wind the vertical turbine used when the pass the vehicle near the turbine the rotated to generated the electricity. And the turbine located on the divider. PROJECT: ONE WHEEL BALANCING SCOOTER. Details: This is the project I completed work ...
- 2022 Jan 17
Al Dafna, Qatar
... Supervision & Installation of HVAC, Plumbing [Water Supply, Storm, Sanitary Drainage, Firefighting, Waste Heat Recovery Unit, Compressors, Pumps, Blowers, Turbine & Nozzles. UNIVERSITY PROJECT: B.Sc Project: Design and Fabrication of Demonstration ...
- 2021 Sep 07
Al Dafna, Qatar
... (QEWC), 262 MW Gas Turbine Power Project with GE, RAS ABU FUNTAS, Al wakra, through ABB AG Germany. KHARAMAA 220/132/66/11/0.415KV Substation Projects with ABB, SIEMENS,AREVA,SCHNEIDER ELECTRIC. Hotel, Mall,Hospital and High Rise Building. PERSONEL ...
- 2021 Aug 05
Fereej Ibn Dirhem, Qatar
... Switzerland 01/2019 – 12/2019 Completed All Module Examinations of EASA Part 66 CAT B1.1 Mechanical including: • Module 7 Maintenance Practices • Module 9A - Human Factors • Module 10 - Aviation Legislation • Module 15 - Gas Turbine Engine B. ...
- 2021 Jun 28
Al Dafna, Qatar
... Undergone training on Operation and working maintenance of Turbine and Boiler by Indian School of Petroleum & Energy, New Delhi. Undergone training on Operation & maintenance of Steam Turbine by Indian School of Petroleum & Energy, New Delhi. ...
- 2021 Apr 09
Al Dafna, Qatar
... Set and Adjust machine tools equipment like: (electricity power turbine, water desalination, pumps etc.) Disassemble and/or assemble large rotational mechanical components and equipment to meet the required specifications. To ensure the compliance ...
- 2021 Mar 17
Al Dafna, Qatar
... for Power Plant 9.C/L & Level Marking For Gas & Steam Turbine Building, Heat Recovery Steam Generator, Diffuser Noise Protection Walls, Pit for Boiler Blow Down & HRSG Drain Tank, Pipe & Cable Bridge, Clarified Raw Water & Fire Fighting Water ...
- 2020 Dec 15
Doha, Qatar
... and Hand Over Documents Packages, Participated in Modifications, Inspect and Control Work Procedures, HSE and Progress of Sub Contractors during Turnaround of the Steam Turbine along it's Generator and other parts of this Biomass Energy Central. ...
- 2020 Oct 19
Al Dafna, Qatar
... Mechanical Maintenance and commissioning experience with expertise in the following Equipment such as Centrifugal pumps and compressors, Reciprocating compressors, Rotary pumps, Gear Box, Gas Turbine, Steam Turbines, Fin fan, ID, FD Fan, Valve, ...
- 2020 Oct 15