Post Job Free

Resume

Sign in

Power Plant Project

Location:
Al Dafna, Qatar
Salary:
4100 USD
Posted:
December 15, 2020

Contact this candidate

Resume:

AADARSH V. JILKA

C/O, Narendrabhai Jivrajbhai Kava, “Shree Shiv-Shakti Krupa”

FCI Godown Road, Opposite Road of Nageshwar Jain Temple,

Rajkot-360006, Gujarat, INDIA

MOBILE NO : +974-****-**** / +91-800**-*****

E-MAIL ID : adip2b@r.postjobfree.com / (adip2b@r.postjobfree.com)

Objective

Seeking a high profile career-oriented job in a dynamic corporate environment, wherein I am accorded an opportunity to explore my skills and experience to wider horizons with a “CAN DO” attitude & proven efficiency.

Career Profile

Survey Engineering with 15 years (10 years in African & Gulf Countries) As a Surveyor of rich & extensive Experience in diversified project of Offshore & Onshore Construction Industries, Oil & Gas Refineries, Ports, Power Plants, Industrial Buildings, Road, Rail, Pipe line, Power Transmission & Distribution, Infrastructure & Utilities Etc. . Currently associated with Medgulf Construction Company W.L.L. an ISO9001-2015, ISO14001-2015 & ISO 45001-2018 based in Doha, Qatar.

Expertise in handling modern Surveying Instrument like GPS, TOTAL STATION, AUTO LEVEL & Surveying Software like Auto CAD, Auto Lips, Leica Geosystem / Leica Geo Office

Education Qualification:

Diploma in Civil Engineering with 71.44 % in June 2010 from Technical Examinations Board, Gandhinagar (Govt. Polytechnic Porbandar) Gujarat, India

Land Surveyor with 84.92 % in July 2005 from National Council for Vocational Training, Gandhinagar (Govt. I.T.I. Jamnagar) Gujarat, India

10th Passed with 58.71 % in March 2003 from G.S.E.B., Gandhinagar, Gujarat, India

Computer Proficiency:

Auto Cad 2015, Auto Lips, Auto Plotter, COGO, Datum and Map

Leica’s - Differential Post Processing System- Leica Geo office & Leica Geo Systems

Microsoft Office package 2017, all Windows OS, ms-DOS, LAN and WAN, E-mail & Internet

Skills

Self-motivated & Excellent communication skill

Hard working and very systematic and committed with integrity

Striving to achieve quality and co-operation from co-workers and co-department

Team spirit, hardworking and sincere, can work under toughest condition

Well conversed with the basic theory and concepts and confident of learning to handle Total Stations & GPS systems For Land surveying & Mapping on job.

Instruments Operate:

Auto Set Level, Dumpy Level & Digital Theodolite 0.1”, 1”, 10” & 20” L.C

Total Station

1. SOKKIA: SET 110K, 510K & 120K, 220K, 520K 4. GOWIN: TKS-202 (TOPCON MADE)

SET 150RX & 250RX 5. SOUTH: NTS 352

SET1 030R & SET2, SET6 6. NIKON 352, DTM 851

2. LEICA: TCR 1208, 1201+, 1200, 801, 805 7. PENTAX - PTS V2, R322 NX, R-315

TC 403, 407 & TS 02, 06 & 09 8. TRIMBLE 3600 DR, 3603 DR (Robotic Inst)

3. TOPCON: 751, 750, 721, 352N, 233N 9. SEPCTRA PRECISION TS-415 & TS-515

Positioning Systems - G.P.S., D.G.P.S. & RTK

1. LEICA GEOSYSTEMS 1200 6. PROMARK-3 THALES

2. LEICA VIVA GS 15 & 10 7. MAGELLAN PROFESSIONAL

3. LEICA RED LINE- 900 8. GPS MAP76 & 76CSx – GARMIN

4. TRIMBLE 3600, 5800 & 5700 9. Static and RTK GPS (Trimble hardware & software)

5. Electromagnetic & Conventional Systems (Linear & Angular Measuring Equipment & EDM systems)

Trainings Attended:

Successfully completed Construction Safety Training Programme by SAFETY CIRCLE.

Successfully completed Quality Management System Awareness Program-ISO 9001-2000.

Successfully completed PTWS & ATW, Heat Stress & H2S Awareness training conducted by GASCO.

Successfully completed RPP Respirator Protection Program conducted by RLOC & Enertech Qatar

Successfully completed H2S/BA Awareness, Heat Stress, CSE, PTW, ATW, TSTI, ISI, SHES, RG Golden Rules training conducted by Enertech Qatar, RASGAS, CAEL, ORYX, RLOC, Qatar Gas & Qatar Petroleum

Work Experience:

(1)Organization : MEDGULF CONSTRUCTION CO. (W.L.L.)

Project : CCWS, BARZAN, WELLHEAD, METERING SYSTEM, RRTIW, DUKHAN, FTS & FAP

Project Cost : $ 70 Million U.S. Dollars, $ 250 Million U.S. Dollars, & $ 300 Million Qatari Riyals

Client : QATAR PETROLEUM, QATAR GAS, RLOC, Q-Chem, ORYX GTL LTD, RAS GAS

Designation : Senior Land Surveyor

Period : 06 March 2014 to still the Date (7 Years)

Inst. Operating : GPS: Leica Geosystems 1200

TS: TS 06+, Leica TC 1201+ (GPS Based Total Station)

Project Detail : RLC is supplying seawater for cooling water applications, desalinated water for process requirements, potable water and backup firewater network to the End users in RLC. As part of enhancing the output of hydrocarbon reserves in the State of Qatar and in line with Qatar vision 2030, Qatar Petroleum is developing the “North Field Expansion (NFE) Project” where 4 new mega LNG trains with total capacity of 33 MMTPA will be implemented. It is proposed to install a common Reverse Osmosis (RO) plant catering to NFE and future Petrochemical project. Common Cooling Water System (CCWS) Phase-III project is to extend the Sea water supply and return headers for NFE Project Common RO Plant located in Lot W2 & W3 identified under Phase III by installing main cooling water pumps at existing Pump House 3B and other associated facilities in line with the NFE requirement. (MJ-628 QP)

The Barzan Pipeline Project includes decommissioning and installation of new pipeline 32”Dia. Export Gas Pipeline, 4.5”Dia. Meg Pipeline, 1.5”Dia. CI Pipeline, Fiber Optic Cables & MT Power Cable to deliver sour gas from three well sites with unmanned wellhead platforms, all located in the North Field Offshore of the State of Qatar, to an onshore Gas Plant located at RLIC, Qatar. The project will include also the installation of new MEG delivery system, LTE, Beach Valve & Pig Receiver. Thereafter carryout commissioning of entire pipeline section (MJ-622 QG)

Implementation of Wellhead Coriolis Wet Gas Metering System in each of the 24 Arab D Gas Cap, Recycling Gas (RG) producers for real-time monitoring of gas flow rates and condensate-to-gas ratios (CGRS) in order to maximize the condensate recovery for Qatar Petroleum (MJ-613 QP)

EPIC Of Metering System at Mesaieed - New Coriolis mass flow meter order to mitigate the discrepancies in the quantity of supply of butane through the current butane flow metering system installed in NGL and the quantity of butane received through the meter at QAFAC, Mesaieed. (MJ-607 QP)

EPIC of New RRTIW (Recovery and Reuse of Treated Industrial Water) of wastewater streams in Q-Chem/ Ras Laffan Olefins Company. (MJ-603 RLOC)

EPIC for Dukhan 87 KM Portable Water Supply including a pumping system & Water reservoir from Jabel Tanks Farm and will comprise 3 main pipelines with delivery Branches and three (3) new pumping stations located in Khatiyah North, Fahahil Stripping Plant area, Umm Bab South and in Jaleha area for Qatar Petroleum. The pipeline will branch off to various QP facilities along with required valves, fittings, appurtenances and chambers. New pump house and control building along with all necessary electrical control and instrumentation to accommodate for pumps. (MJ-598 QP)

EPIC of the Fast Transfer System in Unit-10 at DOT-023, Develop & Supply DED Package for Liquid fuel system integrity Project DOT-025 & EPIC of U35 Expander & U10 ASU inlet filter modification. (MJ-591 & 596 ORYX GTL / TECHNIP)

Flow Assurance Project covers onshore storage, MEG transfer pumps, MEG Tank, Building, HVAC and loading facilities to Pump Mono-Ethylene Glycol (MEG) through a high pressure pipeline system to Ras Gas, Qatar gas and Barzan onshore facilities, and the capability to load marine vessels to transport MEG to Qatar Gas offshore back-up tanks on the wellhead platforms to prevent the formation of hydrates (MJ-592 RG/CAEL) & (MJ-594 HYUNDAI)

(2)Organization : DODSAL ENGINEERING & CONSTRUCTION PTE. LTD

Project : HABSHAN SULPHUR GRANULATION PLANT, ABU DHABI, UAE.

Project Cost : $ 490 Million U.S. Dollars.

Client : GASCO (Abu Dhabi Gas Industries Ltd.)

Designation : Land Surveyor

Period : 08 October 2011 to 14 Feb. 2014 (2 Years 4 Months)

Inst. Operating : GPS: Leica Geosystems VIVA GS 15 & TRIMBLE 5800, GPS MAP76-GARMIN

TS: Sokkia SET 110K, 510K & 120K, 220K.

Leica TCR 801 & 1200, Nikon 352 & DTM 851

Project Detail : The project envisages transportation of liquid sulphur from Habshan 1 to 4 and Habshan 5 Plants via electrically heated Pipelines, Storage of Liquid Sulphur, Granulation, Storage of Granulated Sulphur and loading on to Rail Wagons. The scope also includes the facilities for Sulphur Stock Piling in the form of Blocks.

Granulation Plant, Receiving Station Pipe Support, Steam Generation Boilers, Vessels, Air Coolers, Pipe Rack, Surfactant Systems, Wet Scrubbers, Conveyors, Transfer Towers, Dome, Stacker / Reclaimer Conveyor, Rail On Retaining Wall, Railcar Loading, Rail Loop, Evaporation Pond, Tanks, Road, Fencing, Pipe Line. Different Types Of Buildings Like Sub Station, Control, Administration, Sulphur & Chemical Storage, Fire Hall, Maintenance & Warehouse, Operator Shelters, Guard House Etc...

(3)Organization : PUNJ LLOYD LIMITED, LIBYA.

Project : HOUSING & INFRASTRUCTURE BOARD OF TRIPOLI, LIBYA, NORTH AFRICA.

Project Cost : $ 230 Million U.S. Dollars

Client : Public Works Company Tripoli (PWCT), Libya

Designation : Land Surveyor

Period : 22 Dec. 2010 to 01 Oct. 2011 (9 Months)

Inst. Operating : GPS: Leica Geosystems VIVA GS 10.

TS: SOKKIA SET 150RX & 250RX & TOPCON 721 & 750

Project Detail : PLL bagged its first infrastructure and utility project in Libya in JV with PWCT. The scope of work for the contract will include upgrading the Infrastructure of Souk Al-juma & Arada area Tripoli. PLL would be involved in EPC along with commissioning of infrastructure network including water mains, sewage & sewerage tunnels, storm water main and branch lines, Roads and other facilities.

(4)Organization : DIGHI PORT LIMITED, MAHARASTRA, INDIA.

Project : DIGHI PORT LTD. (MAHARASHTRA MARITIME BOARD)

Project Cost : $ 210 Million U.S. Dollars

Designation : Land Surveyor

Period : 17 April 2010 to 20 Dec. 2010 (1 Year)

Inst. Operating : GPS: Magellan Professional & Promark-3 Thales

GPS MAP76CSx-GARMIN

TS: TRIMBLE 3600 DR & 3603 DR (Robotic Inst.) & LEICA TS 02 & 06

Project Detail : The Port is first green field port in Maharashtra. The Port will have five berths, 5kms waterfront, Draught of 12.5 Meter & 1000-acre parcel of land. Berthing port at Dighi and Agarardanda will offer bulk, break bulk, liquid, and LPG / LNG and 18.15 MTPA of container cargo AS A CLIENT JOB.

(5)Organization : ESSAR CONSTRUCTION (I) LIMITED, GUJARAT, INDIA.

Project : ESSAR OIL & GAS REFINERY PROJECT (36MMTPA) VADINAR, INDIA.

Project Cost : $ 4210 Million U.S. Dollars

Client : Essar Oil Limited, Gujarat, India.

Designation : Land Surveyor

Period : 01 Aug. 2008 to 15 April 2010 (1 Year 8 Months)

Inst. Operating : TS: LEICA TCR 801, 1200, 1208 & TC 403.

NIKON DTM 352 & PENTAX-PTS V2, R322 NX

Project Detail : The refinery is now the 2nd largest in India which can produce over 680,000 barrels a day. The refinery is fully integrating with its own dedicated 1200MW captive power plant, port and terminal facilities. Dispatch facilities by rail, road, sea and pipeline, associated tankages, pipelines, water intake facilities, and a Single Buoy Mooring system, which can accommodate Very Large Crude Carriers to receive crude.The units in the phase Was the CDU, VDU, FCC, DHDS, SGU, NHT, DHD, FCCU, CCU, CCRU, and VBU

(6)Organization : SIMPLEX INFRASTRUCTURE LIMITED, JAMNAGAR.

Project : RELIANCE REFINERY & POLYPROPYLENE PROJECT (65MMTPA)

Project Cost : $ 6 Billion U.S. Dollars

Client : Reliance Petroleum Limited (RPL), Jamnagar, India.

Designation : Land Surveyor

Period : 14 April 2007 to 31 July 2008 (1 Year 4 Months)

Inst. Operating : TS: LEICA TCR 805 & TC 407 & TOPCON 750.

SOKKIA SET1 030R & SET2, SET6 & PENTAX R315

Project Detail : The refinery is now the 1st largest in India & 6th largest in world, which can produce over 1,240,000 barrels of oil per day which is 65 MMTPA. All key processing Units including the Alkylation, CCU, COD,CFHU, CPHU, CRU, DHDS, ETP, FCCU, HCU, HMU, PRU, RTF, VDU, VGO, CCR platformer, Delayed Coker, Railway Gantry And The Polypropylene complexes are operating close to their respective design capacities.

Organization : SUKHDEV EARTH MOVERS

Project : RELIANCE REFINERY & POLYPROPYLENE PROJECT (65MMTPA)

Project Cost : $ 6 Billion U.S. Dollars

Client : Reliance Petroleum Limited (RPL), Jamnagar, India.

Designation : Survey Engineer

Period : 01 June 2006 to 28 Feb. 2007 (9 Months)

Inst. Operating : TS: Spectra Precision TS-415 & 515, Leica TC 403

Topcon 751 & 352N, Gowin TKS-202

(7)Organization : GURUKRUPA ENGINEERING CO., VADODARA, INDIA.

Project : NARMADA CANAL PROJECT, SURENDRANAGAR, GUJARAT, INDIA.

Project Cost : Rs. 638 Crore.

Client : Sardar Sarovar Narmada Nigam Limited, Gujarat, India.

Designation : Surveyor Engineer

Period : 01 Aug. 2005 to 31 May 2006 (10 Months)

Inst. Operating : Topcon 233N & South NTS 352

Digital Theodolite 1” L.C. & Auto Level

Project Detail : The Limbdi branch canal 18th KM work will benefit 189 villages in 11 Talukas of Ahmedabad, Bhavnagar and Surendranagar.

Job Profile / Responsibility

1.Traversing and establishing control station & Benchmark with high degree of accuracy.

2.Calculate all the required coordinates of each element as per approved drawing prior to start survey.

3.Worked with TS & GPS Instrument In field of Heavy Structure, Pipe rack, Sub Station, High Rise Shed, Liquid storage tanks, Vessel Foundations, U.G. Pipe Line, compressor, Trestle, Elec. & Inst. Duct & Trenches

4.Understands Const. Drawings & Transfer It As Required By Const. Team To Suitable Positions On Site.

5.Comparing the structural drawing with Architectural & MEP design construction drawings

6.Wherever differences to Engineering design drawings are observed during survey works, especially for underground services location/depth of cover, immediate notification shall be sent to engineering team to promptly assess any possible design implication.

7.Prepares Contours & Landscape Details Using Latest Software’s Such As Auto Cad, Auto Lips, Auto Plotter & Other Survey Software To Interpret Data And Present Information Based on the Recorded Data

8.Layout & Centre line Marking for various types of foundation like, Main Stack, By Pass Stack, Switchyard, W.T.P., Pipe rack, columns etc. for Power Plant

9.C/L & Level Marking For Gas & Steam Turbine Building, Heat Recovery Steam Generator, Diffuser Noise Protection Walls, Pit for Boiler Blow Down & HRSG Drain Tank, Pipe & Cable Bridge, Clarified Raw Water & Fire Fighting Water Building as per Drawing.

10.S/O for const. of piles Product Berth, Multi-purpose berth, Coal berth, Iron ore berth, other dry berth, South & North break water, Sea water Intake Jetty, Pile Gantry, Rail Track, Sky walk Basement & quarry

11.Checking of pile co-ordinates while gantry shifting, Liner tip level, Casing top level & C.D. Level Etc…

12.Marking for buoy & channel for ship way & High Tide-Low Tide measurement & make survey report

13.Setting out alignment for construction of Highway layers as per design at Median and Shoulder side, in embankment, Sub grade, GSB, WMM, DBM, BM, BC, SDBC, KERB & pavement layers, Minor and Major Bridges & Junctions, Pile work, Pier work, Pile cap, Trusses work, service roads, Box Culverts

14.To Observe The L/S & C/S Sections & Curvature Alignment, Contour Surveys & Laying Out Curves

15.Setting out for GRE Pipeline, Horizontal & Vertical bend, Row Corridor of Pipeline with Pipe Supports like Sleepers, Anchor & Thrust Blocks, Valve Pit, Manholes, Elbow, Tee etc...as per G.A. & Isometrics Drawings

16.Setting out for Alignment of Pipe Separation Barrier, Pipe Siphon, Utility Duct, Precast Box Culvert, Rig & Road Crossing Culverts for above ground Pipeline.

17.Alignment & Levelling of Bolt & track For Rail, Conveyors, Tanks, Vessel Foundation & Heavy Structures

18.Verticality checking & alignment of structural Columns, Chimney, Vessels & Equipment’s Etc. . . .

19.Leveling of Paddings for Installation OF Structure

20.Survey for LTE, Beach Valve Station, Excavation, Pipeline Installation, Micro tunneling, Existing Crossings, Pipe Supports, Tie- in, Station Piping, Valves Installation, Paving, E & I related works, Backfill, ROW, Road, Grading and Bunding

21.Pre & Post backfill survey to confirm the required thickness of backfilling, grading and bunding works as per project specification, elevations of finish grade as per drawing

22.Conducting inspection of all survey activities at site with consultant and maintaining files of drawing, RFI, all survey document & records as per client requirement & ISO 9001:2015 QMS

23.Co-coordinating with Client, Consultant, sub-contractor, suppliers, and site people.

24.Execution of construction work at site with safety and quality as per Client Requirements

25.Preparation of STQ’s for missing information and mistakes in given drawings & Raising RFI For Activities

26.Preparation of Shuttering details from footing to roof slab level & BBS as structural drawings

27.Preparation of contractor’s Bills, JMR, BBS, Labor supply, client bills etc.

28.Successfully attended the internal review meetings organized by the construction manager & Foremen to appraise the progress and various problems.

Personal Information:

NAME : Aadarsh V. Jilka

DATE OF BIRTH : June 11th 1988

GENDER : Male

HEIGHT & WEIGHT : 164 Cm & 67 Kg

HOBBIES & INTEREST : Exhibitions, Reading, Traditional Garba & Travelling

NATIONALITY : Indian

PASSPORT NO : S 9006149 (Expiry Date : 15 Oct. 2028)

LANGAUGES KNOW : English, Hindi, Gujarati

MOTTO IN LIFE : Learn from Past, Live in Present & Plan for the Future.



Contact this candidate