Resume

Sign in

Civil Engineering Manager

Location:
Clarksburg, MD
Salary:
$110,000.00 per year
Posted:
September 25, 2020

Contact this candidate

Resume:

CECIL CALVIN BROWN II

Germantown, MD *****

Mobile: 234-***-****

Email Address: adgen7@r.postjobfree.com

PROFESSIONAL OBJECTIVES

Architectural Project Manager

PROFESSIONAL QUALIFICATIONS

Primary project management responsibilities included budget, task planning, coordination, and execution of site assessment under federal, state and local regulatory agencies. Ensured that the project complied with the UBC manual for code compliance and submitted permissible construction documents for review. Recent position assignment was to supervise construction of new military firehouse.

Responsibilities included close communication with military personnel, project architects and project engineers to make sure project activities meet the expectations envisioned by the client, frequent communication with oversight agencies and other regulators so that an acceptable conclusion may result with minimal difficulty and expense. As project manager, responsibilities include making sure project budgets are met, and project documents receive an appropriate level of quality control. Project budgets ranged from $500,000.00 to $120,000,000.00 from 1997 through 2016.

PROFESSIONAL ASSIGNMENTS

APSI CM, Department of Labor, Project Manager (Contractor), Arlington, VA 07/18 – Present

Architectural consultant with APSI CM on projects with Department of Labor. Throughout the duration of the project, maintained government facilities inspections standards along with coordination of site meetings with A/E firms, general contractor and federal government personnel. Produced and presented facilities inspection presentations for the Department of Labor. Prepare final project inspection reports for the Department of Labor, facilities personnel and general contractors’ use.

CBRE, GSA Division, Project Manager (Contractor), McLean, VA 06/17 – 07/18

Architectural consultant with GSA on projects with Department of Justice, Surface Transportation Board, Department of State, Drug Enforcement Administration, as well as other agencies within the United States Federal Government. Throughout the duration of the project, maintained government construction standards along with coordination of site meetings with A/E firms, general contractor and federal government personnel. Prepare weekly budget reports as needed, meeting minute distribution, construction documents review, construction management and ensure that means and methods are maintained.

Howard County, Department of Public Works, Bureau of Facilities, Design and Construction Division, Architectural

Project Manager (Contractor), Columbia, MD 06/14 – 06/17

WATERLOO ROAD FIRE STATION, MD. Managed the new LEED Gold Certified Firehouse facility. Supervised building construction and maintain local government construction standards along with management of project architects and engineers. In addition, prepared government standard administrative documents for new government structure along with government formatted addendums. Ensured that the project complied with the IBC manual for code compliance and submitted permissible construction documents for review. Square Footage: 15,000.00. Estimated Construction Cost: $10,000,000.00.

HOWARD COUNTY DETENTION CENTER, MD. Coordinated the county correctional facility expansion from master planning addition schematic design, design development and construction documents through construction administration with the selected A/E firms. In addition, designed interior space planning for administration in correctional facility expansion. Furniture selection and acquisition of open office systems and penal furniture and equipment layouts for the project expansion. Herman Miller, Steelcase, Teknion and Acorn Penal Ware manufacturers were used on this project. Square Footage: 30,000.00. Estimated Construction Cost: $10,000,000.00.

Volvo Group Trucks, Site Architect/ Site Interior Designer/ Construction Administrator (Contractor),

Hagerstown, MD & Shippensburg, PA 01/12 – 06/14

VOLVO POWERTRAIN PLANT, MD/PA. Interior designs, architectural designs of industrial and commercial areas in the industrial facility including new office space designs, employee lounge spaces and redesign of the employee cafeteria were some of the designs performed throughout the facility along with exterior hardscape redesign. In addition, performed construction administration duties on some of the projects throughout the facility. Ensured that the project complied with the IBC manual for code compliance and submitted permissible construction documents for review. Square Footage: Varies. Estimated Construction Cost: Varies.

FAMILY FIRST MEDICAL CENTER, MD. Coordinated the design of this project with the selected A/E firm and performed some of the design changes with the A/E firms. Designed the lobby for our new medical center, coordinated the construction documents review from the A/E firms, and construction administration of the facilities' medical center for the employees and their family members. The construction documents were prepared with AutoCAD Architecture software. Square Footage: 1,000.00. Estimated Construction Cost: $750,000.00.

Department of Defense [Martin State ANG], Construction Project Manager (Contractor), Baltimore, MD, 06/10 – 11/11

FIREHOUSE REPLACEMENT BUILDING, MD, Managed new LEED Silver Certified Firehouse facility. Performed the duties of the construction administrator on this project. Throughout the duration of the project, maintained government construction standards along with coordination of site meetings with A/E firms, general contractor and military personnel. Performed monthly presentations with military and government officials. Prepared weekly budget reports, meeting minute distribution and daily site visit to ensure that means and methods were maintained. Ensured that the project complied with the UBC manual for code compliance and submitted permissible construction documents for review. Square Footage: 20,000.00. Estimated Construction Cost: $6,000,000.00.

OPERATIONS AND TRAINING FACILITY, MD, Computer Animator for new LEED Silver Certified administrative facility. Created 3D animations and rendering presentations for National Guard Bureau and government personnel with AutoCAD Architecture 2011 software. Square Footage: 30,000.00. Estimated Construction Cost: $11,000,000.00.

TFI-C-27 SQUADRON OPERATIONS FACILITY, MD, Computer Animator for new LEED Silver Certified administrative facility. Design the building shell and interior design layout for distribution to the selected A/E firm to create the construction documents. In addition, created 3D animations and rendering presentations for National Guard Bureau and government personnel. The presentation was presented at Andrews Air Force/Navy Base. Square Footage: 12,000.00. Estimated Construction Cost: $4,000,000.00.

Hibser/Yamauchi Architects, Oakland, CA, Jr. Project Manager, 03/08 – 05/10

STATE OF CALIFORNIA, COUNTY OF SANTA CLARA MUNICIPAL COURTHOUSE, CA, Managed this state correctional facilities project tenant improvement for interior renovation of municipal courtrooms and exterior security fencing from schematic design, design development and construction documents. Furniture selection and acquisition of open office systems and penal furniture and equipment layouts for the project expansion. Herman Miller and Acorn Penal Ware manufacturers were used on this project. Ensured that the project complied with the Title 24 manuals for code compliance and submitted permissible construction documents for review. Square Footage: 5,000.00. Estimated Construction Cost: $1,500,000.00.

STATE OF CALIFORNIA, COUNTY OF SANTA CLARA CORRECTIONAL FACILITIES, CA, Created the 3D animation for the new LEED Silver Certified administrative facility. Managed a design team for this state correctional facility project from schematic design, design development and construction documents. Performed the construction administration duties and site meeting acquisition and distribution for this project. Square Footage: 60,000.00. Estimated Construction Cost: $10,000,000.00.

KAISER PERMANENTE HOSPITALS, CA, Prepared and coordinate construction documents with engineering firms for varies interior renovation medical projects from schematic design, design development and construction documents through OSHPD submission. In addition, performed construction administration duties on varies projects. Ensured that the project complied with the Title 24 and OSHPD manuals for code compliance and submitted permissible construction documents for review. Square Footage: varies. Estimated Construction Cost: $500,000.00 through $6,000,000.00.

Cowie Associates, Washington, DC, Sr. Project Architect, 01/03 – 02/08 and 01/99 – 06/00

OLYMPUS GYM, VA, Prepared the design of the new athletic facility project from schematic design, design development to construction documents and including construction administration. In addition, coordinated engineering construction documents throughout the project and managed project engineers. Ensured that the project complied with the IBC manual for code compliance and submitted permissible construction documents for review. Also, performed the FF&E and designed all of the custom fixtures for the projects. Square Footage: 40,000.00. Estimated Construction Cost: $6,000,000.00.

AEC National, Cleveland, OH, Project Architect, 07/00 – 12/02

STATE OF FLORIDA, COUNTY OF NAPLES COUNTY JAIL EXPANSION, FL, Coordinated the state correctional facility expansions from schematic design, design development and construction documents through construction administration. In addition, prepared the interior space planning for administration and prisoner dwellings in correctional facility. Furniture selection of open office systems layouts for the administration spaces and inmate dwellings varies systems: Herman Miller, Steelcase, Teknion and Acorn Penal Ware. Square Footage: 100,000.00. Estimated Construction Cost: $100,000,000.00.

URS Corporation, Columbus, OH, Architectural/Interior Space Designer, 12/97 - 01/99

PORT COLUMBUS AIRPORT EXPANSION/RENOVATION, OH, Prepared the construction documents with a partner for the international airport expansion project. In addition, coordinated engineering construction documents throughout the project and managed project engineers with weekly coordination meetings. Square Footage: 500,000.00. Estimated Construction Cost: $120,000,000.00.

CAMDEN CLARK MEMORIAL HOSPITAL [CANCER CENTER MRI LABORTORY, WV], Prepared construction documents of new medical MRI laboratory including radiation examination room. In addition, reviewed and coordinated the engineering construction documents throughout the project. Assisted Director of Medical division throughout project through construction administration. Square Footage: 50,000.00. Estimated Construction Cost: N/A.

PROFESSION CERTIFICATION

AAIA MEMBER

Number: 38041139

NCARB

Number: 133320

Ohio, Maryland & California (completing A.R.E.)

NCIDQ

Washington, DC

California (scheduled for in autumn 2018 for C.I.D.)

USGBC

LEED Green Associates

LEED BD+C (pending)

OHSA

10 Certification

20 Certification

EDUCATION

The Ohio State University

Columbus, Ohio

Major: Architecture

Degree: Master of Architecture

The Ohio State University

Columbus, Ohio

Major: Interior Architecture

Degree: Bachelor of Science, Industrial Design

Columbus State Community College

Columbus, Ohio

Major: Civil Engineering

Degree: Associate of Science, Civil Engineering

Columbus State Community College

Columbus, Ohio

Major: Architecture

Degree: Associate of Science, Architecture

SOFTWARE KNOWLEDGE

Autodesk

Adobe

Microsoft

Autodesk: AutoCAD 9 thru 2015

Autodesk: 3DS Max 5.0

Revit Architecture 2008

Adobe Photoshop

Premiere

Adobe Acrobat

Microsoft Office 2016

Microsoft Project 2016

BlueBeam

BlueBeam Revu

REFERENCES AVAILABLE UPON REQUEST



Contact this candidate