PE- PCM/Planning Manger/Sr.Plannere/PCS
Curriculum Vita
Personal Data
Name : Ahmed Issa Ibrahim El Feky.
Date of Birth : April, 4th 1976.
Nationality : Egyptian.
Contact No. : (009**-********
E-mail : adamjd@r.postjobfree.com OR adamjd@r.postjobfree.com
Marital Status : Married & have three daughters.
Residency Type : Transferable
Driving License : valid – (Egyptian, Qatari and Kuwaiti.)
Education Qualification.
Professional Engineer from Kuwait Society of Engineering- August 2010
B.Sc. Civil Engineering from Zagazzig University - May 1999 with rate of good (72.3%)
Final year grade: very good
Graduation Project :( Construction & Management of EI AZHAR road tunnels (1,200 Million Egyptian Pound).
Personal Characteristics.
Strong Communication, Negotiation, Monitoring and Coordination skills.
Strong Analytical Thinking, Professional reporting & writing skills & Contractual awareness.
Reliable, Efficient and Decision maker.
Willing to gain knowledge and self-development continuously.
Self-motivated, Social, Fast learning, Active, Team and Hard worker, Competent
Computer Skills.
Primavera "P6" & “P3
Microsoft Package (Excel, Word & PowerPoint), PJP & CMS (Planning & Cost control programs).
Language Capabilities.
Good command of Arabic & English spoken and writing.
Membership
Professional Engineer- Civil engineering department- Kuwait society of engineering.-August 2010
Member of Kuwait society of engineering # 18649
Member of Egyptian Management Society of Engineers
Member of Egyptian Society of Engineers- Established 1920 - Civil department (02764).
Member of Egyptian Engineers Syndicate.# 8/2301205/1999/3
Personal interests
Management Researches, Listening to music, Discussions.
Training
PMP training course at Jupiter2000 In Egypt for (35) interdependent hours in September/d, October 2009
Primavera P.6 training Course at PROJACS (Kuwait ) in August 2008
Civil Engineer in consultant engineering office (Prof. Dr. Esam El Awaddy’s office) through summer vacation (1997 up to 1999 ) at “Al-Ahrar General Hospital at Zagazzig city.
Responsibility:-including but not limited to
Study the Contract Document.
Prepare/ review & approve for time schedule (CCS) according to the contract documents.
Prepare/review & approve for The Contractor Method statement.
Prepare/review &approve The Contractor /Client Monthly & Bi-weekly (Pre-meeting) progress reports.
Provide delay analysis, area of concern, Preventive and Corrective action.
Prepare/review & approve Cost Load schedule after approval of schedule of values.
Prepare/review & approve Cash Flow statement and Financial S-Curve.
Prepare/review & approve Resource Loading and Histogram.
Communicating the Interfacing works with other trade to avoid time slippage
Identifying and highlighting the contract contradiction.
Report the work progress to the Management with delay analysis.
Participate in Contract Administration letters on issues relative to time aspect.
Prepare/review & approve time claim with all documents.
Work Experience:-
In State of Kuwait (From August, 2005 Till Date)
(From October,2018 Till Date).
Senior Planning Engineer at PMIS (Project Management International Systems),(PMC company ) in Design, Construction, Equipment, Furniture and Operational Maintenance for the Expansion of Al-Farwaniah Hospital.
(From July, 2017 till October 2018).
Senior Planning Engineer at SEG-Qatar in Construction, Completion and Maintenance of Student Activities and Athletic Facilities (SAAF)-Sabah Al-Salem Kuwait University City.
(From April, 2012 till April, 2017).
Senior /lead Planning Engineer at Combined Group Contracting Co. (K.S.C.C.) working in Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project (Main Link) /RA/140& Construction of the Interchanges of main highway 6th ring road - south Jahra Contract: RA184 .
(From July, 2010 till April, 2012).
Senior Planning Engineer at Dar SSH International engineering working in Sabah-El Salem University City project (Shadadiyah University) Bp#1 Earth Work.
(From August, 2005 till June2010).
Senior Planning Engineer in (International Master for Project Management Company) working in various projects for many companies.
In State of Qatar (From October 2004 to August 2005).
Planning Engineer in Global Vision Company. Working for Shannon Trading & Contracting
In Egypt (From September, 1999 till October 2004
(From: July 2003, to October 2004).
Project Planner & Cost Control Engineer at PISC (Prims Information System Corp.) work in training for many companies in Egypt & Saudi Arabia.
(From September 2000 to July2003).
Planning & Cost Control Engineer at El Mahmoudia General Contractor & Real Estate Company.
(From September, 1999 to September 2000). “through military service” .
Planner at Construction Consultant Group Co. (CCG) in Tanta Educational Hospital Project.
Reference
Mr. Niels Palmann, FCInstCES, Commercial Manger at Combined Group Company- Kuwait, Tel +965 (99693297), E-mail : adamjd@r.postjobfree.com
Eng. Hany al Messeri- Lead Planning Engineer – Mohamed Abdel Mohsen Al Khorafi, Kuwait, +965(90023374). Email: adamjd@r.postjobfree.com.
All reference will furnished upon request It will be great honor for me to be part of your team
Addenda
Past experience (in brief)
In State of Kuwait
Organization
1-PMIS (Project managnemt international system ) (PM company)
Period
Oct.2018Till present
1-1-Project
Design, Construction, Equipment, Furniture and Operational Maintenance for the Expansion of Al-Farwaniah Hospital
Position
Senior Planning Engineer
Project Brief
The Employer (Ministry of Health (MOH) decided to construct the expansion of the Farwaniah Hospital as part of their National Healthcare Development Plant. MOH has signed the contracts with PMIS as project management company & Gulf Consult (GC), The consultant and Sayed Hamid Bahbahani & Sons (SHBC) The contractor.
The Project building up area extended to approximately 387,000 m2, consisting of a Main Hospital Building (955bed) (9 floors), Dental Clinic building (B3) (4 floors), Services Building (B4) (3 floors), Multi-story Car Parking Building (B5) (6 floors) (1,400 cars, a Service Tunnel and hard & soft landscaping. Project Duration is 1852 days & target finish on 26-Dec-2019- 13 month extension are expected & project total cost is 265,000,000. KWD.
The project scope covers the design process with authority approval, construction, equipment, furniture and operational maintenance of all buildings, Works are classified under divisions: Site Works, Concrete, Masonry, Metals, Wood and Plastics, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Furnishings, Special Construction, Conveying System, Mechanical Works, Electrical Works and Medical Equipment.
The project is design and build project, full of challenged,specially the coordination between different trades
Organization
2-SEG-Qatar
Period
July,2017 Till Oct,2018
1-1-Project
Construction, Completion and Maintenance of Student Activities and Athletic Facilities (SAAF)-Sabah Al-Salem University City– Kuwait University
Position
Senior Planning Engineer
Project Brief
The Employer “KUWAIT UNIVERSITY (KU)" - State of Kuwait- Director Of Kuwait University Construction Program (KUCP) has signed The Contract to "SEG-Qatar”. Project & Construction Manager PM/CM is TURNER-PROJACS (TP).The Consultant is SOM-GULF CONSULT (GC). (SAAF) Project is spread over 13 parcels in the heart area of the campus with a total land area of 207,866 sq. m and a built up area of 274,360 sq. m. with the total value of 162,617,478.624KWD. split into two packages:-Package I consists of four large buildings accommodating sports facilities for men and women, one medium building for students activities and four small buildings for various services. With a duration is 1330 days & Value of 105,351,596.205 KWD. Package II consists of 15,000-seat stadium, 2,000-seat indoor tennis court, a series of outdoor sports fields and three services buildings. With a duration is 1120 days & Value of 57,232,651.172 KWD.
The project scope covers the construction, completion and maintenance of all buildings, and facilities. Works are classified under divisions: Site Works, Concrete, Masonry, Metals, Wood and Plastics, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Furnishings, Special Construction, Conveying System, Mechanical Works and Electrical Works.
Organization
3- Combined Group Contracting Co.(K.S.C.C.)
Period
April,2012 :April,2017
2-1-Project
Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project (Main Link) / Contract :RA/140 (Design & Built)
Position
Senior/Lead Planning Engineer
Project Brief
The Employer "Ministry of Public Works" - State of Kuwait has signed The Contract of Design & Built /Maintenance of Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project (Main Link)-Contract: RA/140 to "Hyundai-CGC Consortium" The Consultant is consortium of Dar al Handasa / SSHI/ TYLINE, The ICE (Independent Checking Expert) is AECOM and The Designer is SYSTRA S.A.
The purpose of the project (36.14km) is to connect the planned new town in Subiyah north of Kuwait Bay with Kuwait City south of Kuwait Bay.
CGC scope of work in Shuwaikh including Ghazali Transition Bridge(447m), Shuwaikh Port Bridge(1125m), Shuwaikh Port Interchange(844m), six Approach ramps(855m) including reclamation, revetment, utilities protection/diversion/service roads & construct visitor center/administration buildings
CGC scope of work in Subiyah including soil improvement, embankment(13m high-3950m length,) KOC bridge(304m),Interchange bridge(1866m)
More over 13 administration small buildings over two artificial island
The whole contract value is 738.75 Million KWD. The Project Duration is 5 Years.
2-2-Project
Construction, Completion and Maintenance of the Interchanges of main highway 6th ring road at south Jahra RA184
Project Brief
MPW award the contract of Construction, Completion and Maintenance of the Interchanges of main highway 6th ring road at south Jahra RA184 to Combined Group Contracting Co. -Roads & high way section in November,2010
The project consist of on trough, six bridges beside roads & utility services(storm, telephone network,water connection, 11 KV, street lighting)
The contract value was 36.7 Million KWD. & The Project Duration was 36 Months.
Organization
4-DAR SSH International-Consultant
Period
July 2010
: Aplil,2012
3-1Project
Infra-structure of Sabah al-Salem University City – Kuwait University Project-Bid Pack #01
Position
Senior Planning Engineer
Project Brief
SSH is the Design and Supervision Consultant of the Infra-Structure Packages
The project area is 6,000,000 m2 approx., divided into Main Campus (4,000,000 m2 approx.) and Medical Campus. (2,000,000 m2 approx.),
The Bid Pack # 01 is for Earthwork with cost of 5.7 million KWD. and this includes: excavation, stripping, collapse treatment, backfilling,soft landscape & irrigation,and Advertisement Hoarding
The Project Duration is 24 Months.
Organization
5-International Master for Project Management
Period
August,2005 : June 2010
4-1-Project
Renovation & Construction Of Dahiet-Abdula-Esalem & Mansouria Co-Operation.
Position
Senior Planning Engineer
Project Brief
The Management of Dahiet-Abdula-Esalem & Mansouria Co-Operation objective was maintaining the operation of the cooperation ongoing all over the renovation process by maneuvering the sections while construction is processing.
The challenge was to maintain fast track time schedule fully detailed design processes with related Authority approval in line with the master construction schedule.
Khalid Al Khorafi & Sons (KAK) was the Contractor and (Total Management Consultancy Project Management & Facility Studies) was the Construction Manger. The contract value was 5, 3 Million KWD. & The Project Duration was 24 Months.
4-2-Project
Design, Construction & Maintenance of Al-Shadadiyah Housing City For Expatriates. (Design &Built)
Position
Senior Planning Engineer
Project Brief
Ministry Of Public Work-Special Project Administration (The Client) Assigned The First Kuwaiti For Trading & Contracting Co. W.L.L. (The Contractor) for Design, Construction & Maintenance of Al-Shadadiyah Housing City For Expatriates.
The project included 23 Residential Buildings, Medical Center, Mosque, Security Center, Administration Building, 6 Electric substations, Main Electric Station 132/11 KV, Ground Water Tank, Boundary walls, Waste Treatment Plant, Infrastructure works with value of 27,481,971.00 KWD.
The challenge was to maintain fast track time schedule fully detailed with whole design processes and related Authority approval in line with the fully detailed construction schedule (including resource and cost loading) in such design & built/ fast track project. The Project Duration was 30 Months.
4-3-Project
Construction& Maintenance Of 360 Degree Cinema Complex.
Position
Senior Planning Engineer
Project Brief
Tamdeen Real Estate Company (The Client) assigned Al-Riyash Trading Co. (The contractor) for Construction & Maintenance Of 360 Degree Cinema Complex under supervision of SSH International Consultants with value of 1.2 Million KWD. The Project includes all high quality finishing work coordinated with Electro-mechanical works.
The challenge was to encourage the elector-mechanical contractor (Khorafi-National) to expedite his performance and coordinate with him, reporting his delay to claim.
4-4-Project
Construction& Maintenance Of Telecommunication & Navigation Institute Project (Shuwaikh Campus).
Position
Senior Planning Engineer
Project Brief
Public Authority For Applied Education & Technology (PAAET) (The Client) assigned Al-Hamra Kuwait Company (The contractor) for Construction& Maintenance Of Telecommunication & Navigation Institute Project (Shuwaikh Campus) under direction of Turner PROJACS (The Construction manager.
The project included two different buildings including civil, electro-mechanical, finishes and furniture works with value of 3.7 Million KWD.
The challenge was in the methodology to prepare time schedule from Schedule of Values after approval then allocate resources and cost in a very long and more complicated /accurate way depending on multifunction system and coordination between Primavera system and Microsoft Excel
4-5-Project
Construction & Maintenance of Al-Safat American Hospital
Position
Planning Engineer
Project Brief
Kuwait Medical Center Holding Co. (K.M.C.) (The Client) assigned Al-Riyash Trading Co (The nominated sub-contractor) for Construction & Maintenance Of Al-Safat American Hospital Project under direction of PROJACS (The Construction manager and Gulf Consult (The Consultant).
Al Ghanim International was The Main Contractor & the project was multi-packages system
The project included high sensitive medical finishes & landscape work in eleven floors building and mosque with value of 3, 5 Million KWD.
The challenge was in multi-package system specially the coordination with electro-mechanical and medical equipments requirements and their impact on the finishes. The unfair condition of contract to complete all procurement within three months or penalty to implemented on the nominated sub-contractor.
We protect ourselves by milestones inserting and succeeded in weaken the contract condition.
It is a mix of contribution issues to push the contractor to finish on time and to reserve and weaken any contract condition against us.
4-6-Project
Construction & Maintenance of Box Hill Collage Abu-Helifa
Position
Planning Engineer
Project Brief
International Integrated Education Services Co. (K.S.C.C.) (The Client) assigned Al-Enma'a Real Estate Co (The Contractor) for Construction & Maintenance Of Box Hill College Kuwait Project under supervision of SSHI International (The Consultant).
The project included all civil & electro-mechanical, furniture and landscaping works in two separate buildings with a value of 5,050,000 KWD.
4-7-Project
Construction & Maintenance of Slayl Al-Jahra Hotel Project Phase II/3.1
Position
Planning Engineer
Project Brief
Kuwait Commercial Market Complex Co. (KCMCC) (The Client) assigned Sayed Hamid Behbehani & Sons Co. (The Contractor) for Construction & Maintenance Of Slayl Al-Jahra Hotel Project Phase II/3.1 Project under Direction of PROJACS and supervision of Nezar Al Anjari (The Consultant).
The project consist of four star hotel with six floors, landscape, swimming pool and lagoon, the work included all civil & finishes works with a value of 1,728,000 KWD.
The challenge was in multi-package system specially the coordination with electro-mechanical and furniture/high finishes works and their requirements and effect on the contractor
4-8-Project
Construction & Maintenance of Saad Abdullah City, Block - 8, Contract – 2
Position
Planning Engineer
Project Brief
Public Authority For Housing Welfare (The Client ) assigned Abdel Rahman Al-Bisher Sons General Trading &Contracting Co.(The Contractor) for Construction & Maintenance of Saad Abdullah City, Block - 8, Contract – 2
The projects consist of 209 houses, infrastructure, minor neighborhood center, school, mosque, gas station & substations with a value of 18,267,783KWD.
4-9-Project
Construction & Maintenance of infrastructure of Sabah Al-Ahmed city- blocks D&E
Position
Planning Engineer
Project Brief
Public Authority For Housing Welfare (The Client) assigned Combined Group Co. (The Contractor) for Construction & Maintenance of infrastructure of Sabah Al-Ahmed city- blocks D & E.
The project consist of 4081 plots + 130 substation with a value of 32,985,000.00 KWD.
4-10-Project
Construction& Maintenance Of El Solibikhat East Hosing Project
Position
Planning Engineer
Project Brief
Public Authorities For Housing Welfare (The Client) assigned Al Enma'a Real Estate Co. (The contractor) for Construction& Maintenance Of El Solibikhat East Hosing Project.
The project consist of (220 building, 2 mosques, secondary school, police station, super market, health clinic,substations & all infra-structure works ) including all civil, electro-mechanical and finishes works with value of 15,574,000 KWD.
In State of Qatar
Organization
6-Global Vision office (Doha- Qatar)
Period
October 2004 :August 2005
5-1-Project
Maintenance & Construction Of Multi-story car park at Al Najadah-Doha-Qatar
Position
Planning Engineer
Project Brief
Kahrama (Ministry of Electric & Water) (The client) ) assigned Shannon Trading and Contracting Co. (The Contractor) for Maintenance & Construction Of Multi-story car park at Al Najadah-Doha-Qatar
The project consist of six typical floor with basement including all civil-electro-mechanical, precast push hammer, finishes and car park management system.
The project location was in Al Najdah in the most conjunction area where highly co-ordination is required.
5-2-Project
Maintenance & Construction Of 100 buildings with infrastructure in El Dokhan area
Position
Planning Engineer
Project Brief
Shannon Trading and Contracting Co. was (The Contractor) for Maintenance & Construction Of 100 buildings with infrastructure in El Dokhan area -Qatar
The project consists of 100 building three floor including civil-electro-mechanical and finishes with infra-structure works
In Arab Republic of Egypt
Organization
7- El Mahmoudia General Contractor & Real Estate Company
Period
Sep2001 until October 2004
6-1-Project
1.Six villas in Andalus El Shroak, project.
2.El Hadra Hospital (8.0 million LE), Alexandria
3.Agriculture & Science faculty ( maintenance work ), Alexandria
4.Zain El A3bdeen School (master plan
5.Prepare of company prequalification according to FEDC and Russell concept.
6.General cleaning projects for Cairo governorate (1.2 Million Egyptian pound.) in North Cairo.
Position
Planner & Cost Control Engineer
Graduation project: -
Graduation project was in Planning & Construction of El Azhar tunnels road including-
Method of statement for both tunnel’s body & El Hussein Shaft
Scheduling of shafts (by CPM using {P3}) & the whole project (by L.O.B.).
Alternative study (Time & Cost) between two shaft construction techniques.
Cost estimation, Bid study & financial management (S-curve).
Quality Control Plan in manufacture of tunnel segments.
Dr. Esam El Awdy's Office
Working as representative site engineer for this consultant office At El Ahrar Hospital project execution & quantities survey (120 Million L.E).
In Kingdom of Saudi Arabia
PISC Company
Technical support for their packages (on job training) of scheduling, bid study and cost control
Visit Saudi Arabia two times in Ali Sharco corp. & Jeddah municipality.
Provide method for forecasting of bidding using trend line technique.