Post Job Free

Resume

Sign in

Manager Engineer

Location:
Miami, FL
Posted:
December 31, 2019

Contact this candidate

Resume:

Ivan B. Ochoa

CAREER SUMMARY:

●Experience in the telecommunications field with a TS/SCI (Top Secret Clearance).

●Review engineering plans and blue prints (E.I.P) experience in the installation of LAN networks using CAT5/6UTP and Fiber Optic cables.

●Experience in Power Meter, OTDR’s. inspect and do fusion splicing

●I’m certified as a fiber optics technician and splicer.

●Train junior installers to install equipment, and run power, fiber optics, Category 5/6 Unshielded Twisted pair (UTP) Cable.

●Responsible for reading and understanding drawings, piping diagrams, job specifications, mounting specs, testing procedures, etc.

●Responsible for scheduling installation or building permit inspections with local municipality.

●Knowledge on GIS Software & Global Positioning System GPS and other mapping softwares.

EQUIPMENT:

●Fluke 1800 Series Test set

●Fujitsu OC-48&OC-192 Transport System

●Cisco ONS 15454 OC-48 Transport System

●Alcatel 1648 DACS

●Tellabs 5500 & 1532 DACS

●Tellabs 828 Multiplexers

●CSU/DSU Modems

●Siemens TRA282 Transxpres Infinity

●NEC IMT-150 & 600 Switches

●Nortel Classic OC-48 Transport System

●Nortel Opterra 3500 Transport System

●FM/AM RF Tactical Radios, & Cielo Skylink IDU/ODU

●STU III Secure Telephone Systems

●Digital, Analogue, ISDN, & AT&T Systems 25

●Telco Systems Dcb 24 Channel Bank

●Cascade 9000 Frame Relay System

●ADC Fiber Loop Converters

●T-berd 224, 310, 950 Test Sets

●Fiber Optics Power Meter

●Fiber Optics OTDR’s

PROFESSIONAL EXPERIENCE:

GTT Global Telecom and Technology formerly UNSI United Network Services Inc.

Field Operations Engineer – August 2013 to Present

●Direct and supervise the performance of all installation and construction requirements, equipment testing, troubleshooting and lineup of complete transmission/switching and Microwave Antennas systems.

●Responsible for the installation of Cisco routers, Cielo Skylink network systems IDU/ODU, and switches of various medical facilities throughout the state of Florida.

●Administer applicable company policies and procedures.

●Install and perform analysis of job specifications and drawings, provide work operations to others, Progress Reports, In-Process Quality audits, and resolve project related issues.

Structured Cabling Solution, Inc.

Senior Cable Technician – July 2013 to August 2013

●Responsible for the building out of various new sites for the State Of Florida School Board, which included the installation and termination of copper and termination of Multi-Mode & Signal Mode fiber cables, and the installation of the equipment racks, panels, and cable management. Tested cables Multi-Mode & Signal Mode fiber, Cat5/6, and OTDR’s.

●Coaxial cable, by using the test set Fluke 1800 Series

●Responsibilities also include monitoring, interviewing, and when needed investigating contractors are meeting Federal, and State wages, and safety compliance.

Logic Wireless, Inc.

Cell Tower Ground Tech & Foreman – January 2013 to July 2013

●Supervise telecommunications projects as they relate to Data Comm. equipment for activities related to operations and maintenance, support, integration, relocation-rehome, training, installation, design, verification, and other activities related to the field of telecommunications.

●Responsible for maintaining daily project timeline, complete daily per site field reports, complete daily per site Job Safety Analysis, provide site scope input, collect all on-site closeout documentation and submit to the closeout manager per the deliverable timelines, review all on-site closeout documentation for accuracy, completeness and timeliness, responsible for site crew quality, timeliness, accuracy and schedule, responsible for proper installation of AC and DC power systems in designated telecommunication RBS cabinet, responsible for inspecting grounding, terminations, fastening, proper bolting and antioxidant use, support of leads as required, etc.

●Assist on overall job on ground work as well, all tasks required to build and install a site per customer specs, maintain safe work environment, daily use and completion of JSA forms, assisting with overall crew work, maintenance of vehicles and equipment, etc.

●Responsible for reading and understanding drawings, piping diagrams, job specifications, mounting specs, testing procedures, etc.

●Responsible for scheduling installation or building permit inspections with local municipality.

Insight Global, Inc.

Senior Cable Installer – August 2012 to January 2013

●Responsible for the building out of various new sites for the FBI, which included the installation and termination of copper and splice and termination of multi-mode fiber cables, and the installation of the equipment racks, panels, and cable management.

●Tested cables multi-mode fiber, Cat5/6, and Coaxial cable, by using the test set Fluke 1800 Series & OTDR’s.

●Responsibilities also include monitoring, interviewing, and when needed investigating contractors are meeting Federal, and State wages, and safety compliance.

Metric Engineering, Inc. (US-27 ITS Project)

Senior IT Inspector – July 2010 to March 2012

●This is a $1035365.00 FDOT ITS project that involved the installation of Variable Speed Limit Signs, CCTV cameras and long range and short-range wireless devises along US-27/ SR-25.

●It also involved integrating then new system to the already established Sun Guide Traffic Management Center.

●Duties included but not limited to plan reading, monitoring of the contractor and subcontractors, safety check, verifying installed equipment being installed meet or exceed the technical requirement outlined in the contract and the engineer’s technical proposal.

(RAM) Research Analysis & Maintenance Inc.

Communication Closet Manager & Data Connectivity Technician – October 2007 to July 2010

●Installation of Category 5 patches cables and Fiber Optic from the drop to network devices in on and off site locations.

●Job site installation and maintenance of CAT 5 and Fiber Optic connection needs regarding the network connection to the drop, network devices, patch panels and switches in the communication closets located at local and remote sites.

●Troubleshooting connectivity issues involving network hardware that provides connections to the network on networking devices from the patch panel to the switch in the communication closets.

●Labelling and maintaining cable management within the classified and unclassified communication closets.

●Providing configuration management with updates for drops connected from the network devices through to the switches in the communication closets for on and off site locations.

EF&I Services Corporation

Installer Technician III – October 2006 to March 2007

●Direct and supervise the performance of all installation and construction requirements, equipment testing, troubleshooting and lineup of complete transmission/switching systems.

●Administer applicable company policies and procedures.

● Install and perform analysis of job specifications and drawings, provide work operations to others, Progress Reports, In-Process Quality audits, and resolve project related issues.

Verizon Business

TELECOM TECH III MCI WORLDCOM – November 2000 to July 2006

●Operation, administration, maintenance, and provisioning of Fujitsu OC-48 & OC-192, Cisco ONS 15454 OC-48, Alcatel 1648, Tellabs 5500 1532, Siemens TRA282 Transxpres Infinity, NEC IMT-150&600, Nortel Classic OC-48 and Nortel Opterra 3500 terminals in a ring configuration. Operation, administration, maintenance, and provisioning on Alcatel 1631 DACS and Alcatel1-0 DACS.

●Maintain, provision, and perform cross connects on DS3, DS1 and DS0 on different networks and Optical Signalling from OC-3 to OC-48 levels.

●Troubleshooting of OC-48(STM-16), OC12 (STM-4), OC3 (STM-1), DS3, DS1, E1, and DS0 on a large network. Operation, administration, maintenance, and provisioning of CSU’S, DSU’S, Modems, and Multiplexers

●Designed coaxial, cat5, 28 pair plenum rated cables to spec to be used in daily functions.

●Conduct site surveys for cable pulls as well as perform pull into customer locations, and terminate to interface equipment. (DS0, DS1, DS3, OC3, OC12, and OC48).

Intermedia Communications

Field Operations Technician II – August 1995 to November 2000

●This position is responsible for providing Technical Support in the installation, testing and rapid restoration of DS3-T1, DSO and Frame Relay Circuits. Nortel OC-3 to OC-48. Telco Systems Dcb 24 Channel Bank, Cascade 9000, ADC Fiber Loop Converters.

●Supervise Emergency Response Team, inspect and do fusion splicing. Through knowledge in Circuit Test Equipment; Tberd 224, 310, 950, Power Meter, OTDR’s.

U.S. Army

Senior Communications Non Commission Officer – April 1977 to July 1995

●Provide technical supervision for all electronics communication activities within the command.

●Planned and performed the requisition, installation, operation and maintenance of signal communication systems.

●Established, administered and maintained the Headquarters Communication Security Program.

●Responsible for the installation, operations and maintenance of FM/AM RF Radios. Responsible for the installation of STU III secure telephone systems, digital, analogue, ISDN and AT&T systems 25.

●Responsible for the operations and maintenance of a satellite station in Turkey, established and maintained air to ground communication during deployment of 2800 personnel Headquarters Battalion.

EDUCATION:

●Fiber Optics Level 1& 2

●Professional Development Leadership Course, Fort Bragg, N.C.

●Nortel S/DMS Transport Node OC-48

●Cisco OC-48 Transport Node ring system.

●Advance Maintenance, Basic Electrical & Circuitry Reading

●FT-3 Light wave Communications and Fusion Splicing

●Advance Electronic School

●Basic Communication Course

●Fugitsu 2400 BLSR Transport Node Ring System.

●MCI WorldCom Coaxial Cable connector Certification.

●Safety Proficiency Training

●Counselling Techniques

●SB-3616 Digital Switchboard



Contact this candidate