SANDEEP KUMAR TYAGI
E-Mail ID: ac7c3f@r.postjobfree.com
Contact No.: 987-***-****, 999-***-****
SENIOR MANAGEMENT PROFESSIONAL
Enterprising leader & planner with a strong record of contributions in streamlining operations, invigorating businesses, heightening productivity, systems & procedures
Location Preference: NCR
Industry Preference: Heavy Construction Equipment Manufacturing Industry
PROFILE SUMMARY
A competent professional with over 19 years of experience in:
Product Management New Product Dévelopment Liaison & Coordination
Process Control & Improvement Cost Reduction Risk Assessment
Proficient in coordinating the entire development activities including requirement analysis, planning, finalizing specifications, troubleshooting all technical problems and conducting various tests & inspections
Worked in coordination with Quality, Assembly, Paint Shop, Store, Engineering to smooth line production
Experience in managing fabrication operations, performing tests / inspection for various processes and checking quality standards
Expert in working with vendors to develop the manufacturing processes that will be required, and interacting with the operations teams to develop the necessary supply chains
Skilled in managing process improvements and quality related activities involving resource planning, in-process inspection and coordination with internal departments
PROFESSIONAL EXPERIENCE
Since Jul’05 with Manitou Equipment India Pvt. Ltd., Greater Noida as a Manager (Fabrication)
Growth Path:
07’05- 03’06: Astt. Engg.
04’06- 03’08: Engg
04’08- 03’11: Sr. Engg.
04’11- 03’13: Astt. Mngr.
04’13- 03’18: Mngr.
04’18- Till Date: Chief Manager
Key Result Areas:
Spearheading the operations of the Fabricaton Shop with Plasma Cutting/MIG Welding/Robot Welding/ISO-9001:2008/Store, Q-Gates; preparing monthly data & graph and taking further action to reduce the same
Undertaking complete manpower planning and line balancing to achieve daily targets in compliance with organizational Business System, Safety, Lean, Kaizen, ISO: 9001 & ISO: 14001
Operating as an ECN Coordinator for design review, ECN summary, coordination with QA & V.D., to receive sign off, after part received in assembly/fabrication-line fitment & function trial, trial report to all ECN members, implementing ECN about field serviceability
Conducting daily meetings with SCM/Store/QA Team members to calculate availability of material/line quality issues for smooth running of line
Coordinating projects for the set up standards with liability for strategic utilization & deployment of available resources to achieve organizational objectives
Inspecting field sites to observe & evaluate condition and operability of facilities and structures, and to collect field survey data & measurements
Formulating & implementing stringent systems and quality plans / manuals to ensure high quality standards during all the stages of project; studying drawings, plans or patterns of structures to be made or repaired as per requirements
Eliminating redundant / obsolete processes in the design, development processes and working towards value-addition with suggestion scheme/PIP/PPRN/ECN implementation
Liaising with the customer and coordinating the Design / QC / QA services for preparation of project
Creating & sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members
Generating and maintaining document like SOP, 5’S, Organization Business System, Safety Related Documents,Tools Calibration, M-BOM, MIS etc
Taking decision regard ERP related issues
Involvement in Plasma cut parts Costing
Highlights:
Ensured complete in-process quality control and continuous improvement in self capabilities, foreseeing performance bottlenecks and taking corrective measures to avoid the same
Reduced scrap cost of components by improving the mounting ratio.
Recognized for increasing in-plant capability by 500% through effective use of available resources, was also appreciated for same
Recorded zero unsolved customer / supplier related complaints defects
Undertook key projects:
oAesthetics improvement of machine
oImprove Safe Working days through implementation/improving PPE
oImprove Productivity/Safety in Fabrication through Method Study
oLearning Back Flushing
Projects Handled:
Achieved 90% straight pass (leakage control)
Improved productivity from 1 m/c per shift to 6 m/cs per shift with sufficient reduction in available recourse
Reduced Cost to 5000 per m/c (through consumables and process improvement)
Successfully launched Backhoe Loader in Russia
Active member in achieving ISO-9001 & ISO-14001
PREVIOUS EXPERIENCE
Jan’00-Jul’05 with Geeta Plastics Pvt. Ltd., Delhi as Branch In-charge
Mar’99-Dec’99 with Q.H. Talbros Pvt. Ltd., Faridabad as D.E.T
TRAININGS ATTENDED
Hydraulic Circuit Training Of Backhoe Loader
Training on 5S
Basic knowledge of TPM
Training on Supervisor for Success
Training on Safety Road Maps Time to Time
Training on KAIZEN
Training in LEAN Manufacturing
Training on ISO 9001:2015
Training on ISO 14001:2004
EDUCATION
B.E. (Specialisation) from AIMT Delhi
Diploma in Production Engineering & Industrial Management from Govt. Institute of Engineering, Sonepat (Haryana)
Matriculation from Govt. Sr. Sec. School Ganaur
Others:
AutoCAD training completed in 2012
Value Stream Mapping training in June-12
TQM training completed in 2018
PERSONAL DETAILS
Date of Birth: July 31st 1978
Languages Known: English and Hindi
Address: H. No.-G766, Sector-Gamma 2, Greater Noida (G.B. Nagar-U.P.)