Resume

Sign in

Project Manager Quality Control

Location:
Cuernavaca, Mor., Mexico
Posted:
May 19, 2017

Contact this candidate

Your Name

DOMINGO ALBERTO SATURNO – PROJECT MANAGER - ACQUISITION / PROCESSING / INTERPRETATION / QC GEOPHYSICIST – TECHNICAL AUDITOR (LAND & MARINE)

Nationality

European Union (Italy), Mexico, Venezuela

Contact:

ac0ea8@r.postjobfree.com / ac0ea8@r.postjobfree.com

+52 – 1 – 777 - 328 61 38 / +52 – 777 - *** ****

Country of Residence

Mexico

Education

B.Sc. Geophysical Engineer (UCV), Master in Exploraton and Production O&G (Pau, France), MBA (MU)

Industry Courses

First Aid, RCP, Extinguishers, Recognition of Outstanding Service 1,500,000 hours w/out LTI Guatemala, STOP, HUET and BOSSIET certificates.

WAZ & Similar Seismic Designs, Omni, Max3D, Mesa, Promax, Vista 2D/3D, Geocluster/Geovecteur, Omega, Disco 3D, MicroMax, PSTM/PSDM Data Processing, Multi-component Seismic Data Acquisition/Processing/Interpretation, Refraction Static, Digicon Processing Software, Landmark, HDI-Spectral Decomposition-High Resolution Seismic Reflectivity, AVO, Hampson & Russell, Seismic Inversion, Rock Physics for Reservoir Characterization, SPS Pro, Gator, Geological/Geophysical Petroleum Field System, Well Logs, Seismic Acquisition, Operation Management, Portfolio/Asset Management, Sales/Marketing/Business Development Management, Communication skills for upstream professionals, General Management Software, Visualization-VoxelGeo, Forecast/Incast Software, Project Management-Multistudio/Mutiseis, MS Access, Programming Language Fortran, Basic, Shell Scripts, HP, UNIX, Linux, MS Office Suite.

Publications

Determination of the Refraction Static through the First Arrivals Picking from 2D and 3D Seismic Data by Gardner Method-SOVG-SEG, First Break Picking Arrival & Static Refraction Calculation-SEG, An Update on Seismic Multicomponent Technology & Low Frequency Enhance in Seismic Acquisition-SASG-SAPEG-SEG

Languages

Fluent in English, French, Italian, Spanish.

Good understanding in Portuguese. Knowledge in Arabic.

SUMMARY OF EXPERIENCE

As Geophysical Specialist - Project Manager Acquisition/Processing/Postprocessing/Geological I’ve been working with most of the major oil and service companies (TOTAL-France/Congo, CHEVRON-Congo/Angola, EXXON-Angola, ARAMCO-Saudi Arabia, KHAFJI JOIN OPERATION-KUWAIT OIL CO./ARAMCO-Kuwait, PEMEX-Mexico, PDVSA-Venezuela, GNPOC-CNPC/PETRONAS-Sudan, CGGVeritas, WesternGeco, Geokinetics, Saudi Geophysical, SGS-Seafloor Geophysical Solutions as others), supervising, project managing and leading as Operational and Technical Manager/Supervisor for major contractors in 2D-3D-4D-3C/4C (MC-Multicomponent), Microseismic, for land (Dynamite, Vibroseis, VSP & Well Passive Seismic), marine (Streamers, OBC, OBN, Broadband and TZ-Transition Zone) in seismic acquisition, survey design 2D-3D-4D-3C/4C, Microseismic projects, data QC, data pre-processing, data processing (PSDM/PSTM/MC/Velocity Model), hydrographic, CSEM (gravimetric and magnetometry) projects, seismic interpretation, multidisciplinary geological/geophysical integration (Multi-Attributes / AVO / Seismic Inversion / Spectral Decomposition / HDI / Reservoir Characterization / Visualization), preparing/presenting technical workshops and coaching, in Saudi Arabia, Kuwait, USA, Mexico, Venezuela, Colombia, Ecuador, Guatemala, Sudan and others majors petroleum countries. Currently I hold "Permit Work" for all EU countries, Latin America countries, USA, as others.

With my strong experience, knowledge and skill with applied geophysics (Interpretation and Non-Seismic) and in a leading role in seismic operations and processing, excellent communication and presentation skills in English, expert knowledge of seismic parameter planning software, excellent acquisition design and modeling experience, excellent experience in processing software and parameterization, international professional experience - onshore and offshore, HSEA Line organization, plan, reporting procedures, I can provide to the company the following: planning of seismic operations using state-of-the-art software, analyses of vintage seismic data parameters and acquisition/processing parameters, advise seismic operations on seismic parameter selection and field operations, advise on, assess and implement new, innovative technologies, maintain excellent communication/cooperation with internal and external stakeholders, responsible for technology transfer and expert advice to internal clients, continuous screening of current geophysical technology trends and developments, professional execution of Technology Development projects (high quality, in-time, at proposed costs), make recommendations to the management team regarding new acquisition and processing technologies, as others.

AREAS WORKED

Europe

Norway, North Sea

Africa

Congo, Angola, Sudan, Libya

Asia

N/A

Australia

N/A

Middle & Far East

Saudi Arabia, Kuwait, Arabic Gulf, Red Sea

North America

Mexico, Texas, Gulf of Mexico (USA and Mexico areas), Campeche Gulf

South America

Venezuela, Maracaibo Lake, Colombia, Ecuador, Guatemala

SPECIALIZED FIELDS

Function

Responsibilities

HSE: Project Manager, Client Representative, Field QC Supervisor, Field Operation Supervisor

Marine HSE: Inspect Class Certificates issued by various International Agencies for vessels to be deployed by Geophysical Contractor for their use in offshore survey work. Inspect HSE equipment of each vessel as per guidelines of SOLAS/MORPOL. Review Geophysical Contractor’s corporate HSE procedures, HSE Line organization, plan, reporting procedures and submit a report to Company. Inspect HSE equipment of each vessel as per guidelines of SOLAS/IAGC. Audit Geophysical Contractor’s crew HSE practices followed onboard. Ensure that Geophysical Contractor is following HSE procedures, as required by Company and according to industry standards. Submit written HSE audit reports, as required by the Company.

Land HSE: Inspect HSE equipment of each land crew as per guidelines of SOLAS/MORPOL, Review Geophysical Contractor’s corporate HSE procedures, HSE Line organization, plan, reporting procedures and submit a report to Company, Inspect HSE equipment of each crew as per guidelines of SOLAS/IAGC, Audit Geophysical Contractor’s crew HSE practices followed on land crew, Ensure that Geophysical Contractor is following HSE procedures, as required by Company and according to industry standards, Submit written HSE audit reports, as required by the Company.Marine and Land HSE: Conduct HSE Audit prior to start up acquisition operation and during field operation

Operations Geophysicist.

In-field company representative, contract accounting and management, quality control and assurance of acquired data. Review incoming data acquisition tender requests and provide detailed technical critique. Technical Audit for Marine and Land Seismic Crews according to the Geophysical Contract.

Research and Development.

Designing and rollout new acquisition technologies and helping in developing including WesterGeco OMEGA technique. Develop detailed cost models for unique tests surveys and generate one off technical specifications documentation.

Project Management.

Seismic survey planning from initial tender through to acquisition. Coordination and allocation of marine assets to complete acquisition projects.

Offshore Operations.

Party manager onboard Marine 2D / 3D / 4D seismic research vessels. Multi-vessel, Wide-Azimut Seismic (WAS), 4D, Undershoot Ops. as well as OBC & OBS Ops.

Seismic Data Processing and Post-Processing / Interpretation

Quality control and assurance of seismic data from initial reformat through to final migrated stack PSTM & PSDM, HDI-Spectral Decomposition-High Resolution Seismic Reflectivity, AVO, Seismic Inversion, Rock Physics for Reservoir Characterization.

Navigation Data Processing

Quality control and assurance of navigation data by creating P1/90 datasets.

RECENT PROJECTS

YEAR

CLIENT

COUNTRY

SURVEY TYPE

CONTRACTOR

PROJECT

2015-2017

MULTI-CLIENTS

MEXICO

2D-3D MARINE STREAMERS/OBC

SEARCHER SEISMIC/BGP

SPECS

2014-2015

MULTI-CLIENTS

NORWAY

3D 4C MARINE OBN

SGS

SPECS

2013-2014

TOTAL

CONGO

4D MARINE STREAMER

WESTERNGECO

4D MOHO-BILONDO Monitor 2

2013

CHEVRON

CONGO /ANGOLA

4D-4C MARINE OBN

SEABED/CGG

4D4C BELIZE NORTH

2013

GNPOC

SUDAN

3D LAND DYNAMITE/2D LAND DYNAMITE

BGP / ZPEB

AZRAQ 3D / AZRAQ EAST 2D

2012

KJO

SAUDI ARABIA /KUWAIT: ARABIC GULF

OBC 4C 3D

CGGVERITAS

HUET 4C-3D

2011-2012

GNPOC

SUDAN

3D LAND DYNAMITE/2D LAND DYNAMITE

BGP / BGC

NEEM AZRAQ 3D / GARAAD 2D

2010-2011

SAUDI ARAMCO

SAUDI ARABIA: LAND, RED SEA, ARABIC GULF

2D 3D VIBROSEIS LAND-TZ-NODE / WAZ STREAMER / MMT & CSEM / OBC 4C 3C 3D / BROADBAND 4D STREAMER TEST

BGP / WESTERNGECO / FAIRFIELD / EMGS / CGGVERITAS / PGS

2D: RUB Al-KHALI, SHAYBAH WEST, SHAYBAH, TUMAISHAH, WEST KIDAN, SOUTH QARAIN, TUKHMAN, HAMIDAN, SHAYBAH EAST PROJECTS.

3D & 3C: SHAYBAH RAMLAH, USAYLAH, MABRUK, WAZ RED SEA, SAFANIAH OBC. SAFANIAH BROADBAND 4D TEST

NON SEISMIC: E-10 MMT &CSEM RED SEA

2004-2010

PEMEX

MEXICO/GULF OF MEXICO

2D 3D 3C 4D / LAND,STREAMER, OBC, OBS

WESTERNGECO / PGS

TAMPICO 3D, TAMPICO GULF OF MEXICO 3D, OBC GULF OF CAMPECHE 3C3D, CANTAREL 4D

2001-2004

PEMEX

MEXICO/GULF OF MEXICO

3C 3D / LAND VIBROSEIS DYNAMITE / MARINE SOLID STREAMER

PGS / VERITAS DGC

TAMAULIPAS 3D3C-BOTH BORTHERS OF USA (ALAMINOS CANYON 3D) AND MEXICO (PERDIDO 3D) GULF OF MEXICO

2000-2001

PEMEX

MEXICO

3D / LAND VIBROSEIS

COMESA / WESTERNGECO

GENERAL AMAYA & CHINA NUEVO LEON 3D

2010

PEMEX

MEXICO

3D / LAND (SWAMP) DYNAMITE

MITCHUM-KELMAN

SALINA DEL ITSMO AND LUNA 3D

1999-2000

TOTAL

VENEZUELA

3D / LAND VIBROSEIS DYNAMITE

CGG

JUSEPIN 3D

SUMMARY OF PROJECT WORK

Area

Date

Description of Project

MEXICO, GULF OF MEXICO

2015-2017

2D 3D MARINE STREAMERS OBC

NORWAY, NORTH SEA

2014-2015

3D 4C MARINE OBN

CONGO, ANGOLA

2013-2014

4D 4C MARINE OBN, 4D STREAMER

SUDAN

2013

3D LAND DYNAMITE / 2D LAND DYNAMITE

SAUDI ARABIA - KUWAIT: ARABIC GULF

2012

OBC 4C 3D

SUDAN

2011-2012

3D LAND DYNAMITE / 2D LAND DYNAMITE

SAUDI ARABIA: LAND, RED SEA, ARABIC GULF

2010-2011

2D 3D VIBROSEIS LAND-TZ-NODE / WAZ STREAMER /MMT & CSEM / OBC 4C 3C 3D

MEXICO/GULF OF MEXICO

2004-2010

2D 3D 3C 4D / LAND,STREAMER, OBC, OBS

MEXICO/GULF OF MEXICO

2001-2004

3C 3D / LAND VIBROSEIS DYNAMITE / MARINE SOLID STREAMER

MEXICO

2000-2001

3D / LAND VIBROSEIS

MEXICO

2010

3D / LAND (SWAMP) DYNAMITE

VENEZUELA

1999-2000

3D / LAND VIBROSEIS DYNAMITE

TECHNICAL EXPERIENCE

Type of System

Name of System

Survey Planning

OMNI, MESA, Geocluster, SPECS

Energy

Land and Marine: All type of Vibroseis system and equipment. All type of Air Gun system and equipment

Recording

Land and Marine: All type I/O System and Equipment, and all type SERCEL System and Equipment (Digital and Analogue Systems). Streamers, OBC/OBN for Marine. Node, Single Geophone, Accelerometer and Geophone String for Land.

Survey Navigation

SPS Pro, Gator

Radar: Furuno, Navigation System: ION, Integrated Navigation System: SPECTRA,

Navigation processing Software: Sprinte; Software Binning: Reflex,

Depth Contrler and Compas System: DigiCOURSE,

DGPS: Veriposs Ultra

Seamap RGPS, SERCEL SEAL SYSTEM STREAMER,

ETC.

PROFESSIONAL EXPERIENCE

June 15 – Present SEARCHER SEISMIC – GROUP NYA

Project Manager/QC Seismic-Processing Supervisor - Client Representative – Gulf of Mexico-Mexico

Working as Project Manager/QC Seismic Supervisor for Searcher Seismic in GOM-Mexico as Client Representative (Acquisition/Processing Supervisor) on “Buscador Near-Shore 2D” and “Ultracube 3D South Campeche” marine seismic streamer&OBC acquisition and processing project using BGP vesells, performing the following activities:

• Project Management using Multiseis/Multistudio software

• Company representative onboard the acquisition vessel

• Coach and Improve Design Seismic Marine Streamer 3D Projects

• Develop, implement and supervise all data processing flows for quality control and final deliverables using Promax software

• Responsible for ensuring that contract is correctly managed and accountable for successful and timely completion of the survey objectives

• Routine matters are resolved onboard by QC Supervisor and Party Chief with reference to the contract and industry working practice

• In charge of reporting, check and validation of production figures defined within the contract

• In charge and responsible for operational organization in cooperation with contractor

• In charge and responsible of daily invoicing

• Assist Searcher Seismic responsible of HQSE with Oil & Gas fields production.

February 14 – May 15 SEAFLOOR GEOPHYSICAL SOLUTIONS

Chief Acquisition/Processing Geophysicist - Oslo, Norway

As Chief Acquisition/Processing Geophysicist, I am responsible for management of the onboard/onshore geophysical team and work closely with Geophysical Manager offshore. This position involves overseeing the management, survey design, quality control and processing of seismic data acquired onboard the assigned SGS OBN crew. The role will involve close cooperation with geophysical team, Party Chief and other department heads to ensure SGS targets for survey execution are accomplished:

• Preparing a Manual for OBN Operation (Surveying, Acquisition, QC, Processing, etc.)

• Design and Coach Seismic Marine OBN (nodes) 2D-3D/3C-4D/4C Projects

• Manage & supervise onboard geophysical personnel and activities to ensure OBN survey targets are being met

• Implement and apply geophysical department standard workflows and procedures for data management, quality control and data processing by setting up VISTA data processing software flows

• Provide technical & geophysical support to the onboard geophysical team, party manager, client representatives and other department heads

• Provide all intermediate and final survey data deliverables, data processed deliverables, including those required from other departments, as set out in the survey contract/project book

• Report to the Party Chief and Geophysical Manager on an ongoing basis as required/necessary and ensure reports including the final job report are up to date, accurate and prepared in a timely manner

• Manage equipment, software & consumables inventories as well as perform preventative maintenance and troubleshooting of hardware and software issues

• Contribute to and oversee implementation of individual Personal Development Plan for geophysical department team members

• Promote the SGS HSEQ policies and procedures within the team and ensure team members are working within these requirements.

September 13 – January 14 INTERDEVELOP

Project Manager/QC Seismic-Processing Supervisor - Client Representative – Congo

Working as Project Manager/QC Seismic Supervisor for Total in Congo as Client Representative (Acquisition/Processing Supervisor) on “4D MOHO-BILONDO 2013 Monitor 2” marine seismic streamer acquisition project, performing the following activities:

• In collaboration with TOTAl, perform a Technical Audit before starting operation, according to the Geophysical Contract between each parties and writing a Technical Audit report in order to correct any discrepancy with the Contract.

• Project Management using Multiseis/Multistudio software

• Company representative onboard the acquisition vessel

• Coach and Improve Design Seismic Marine Streamer 4D Projects

• Develop, implement and supervise all data processing flows for quality control and final deliverables using Geovectur/Geocluster software

• Ensure that the Time Lapse acquired matches Monitor 1 as much as possible:

-The pre-plots source centre and streamer positions

-The pre-plots acquisition azimuth, in agreement with the previous swath limits (the same acquisition direction shall be achieved)

• Responsible for ensuring that contract is correctly managed and accountable for successful and timely completion of the survey objectives

• Routine matters are resolved onboard by QC Supervisor and Party Chief with reference to the contract and industry working practice

• In charge of reporting, check and validation of production figures defined within the contract

• In charge and responsible for operational organization in cooperation with contractor

• In charge and responsible of daily invoicing

• Assist TOTAL responsible of SIMOPS with Oil field production supervisors

• In charge and responsible of Time Share between WG Vessel acquisition and CGGVeritas Vessel acquisition in order to share the shooting time and line change.

June 13 – August 13 SINTERVALUE LIMITED

Project Manager/Technical Seismic Client Representative–Marine Seismic Acquisition-Processing Leader–Congo, Angola

Working as Project Manager/Technical Seismic Client Representative for Chevron in Congo and Angola as Seismic QC Lead (Acquisition/Processing Supervisor) on “Belize North OBN 4D-4C 2013” marine seismic node acquisition project, performing the following activities:

• Project Management using Multiseis/Multistudio software

• Company representative onboard the node vessel

• Coach and Improve Design Seismic Marine OBN (nodes) 4D/4C Projects

• Functionally reports to Chevron Project Manager

• Communicate CVX’s HSE expectations, encourage and model safe behaviors

• Facilitate daily operations call with CVX onshore

• Interface with personnel onboard to plan and execute survey fieldwork including:

o Sequence and scheduling of node deployment and recovery, and swath rolling

o Decisions on deployment and recovery of equipment around Company assets

o Approval to move node positions if required

o Permit to work

• Make decisions to alter the survey design, if required, after consultation with shore based SME’s and management

• Review and approve the Operator’s daily report

• Provide technical review and quality control of geophysical data acquired and processed to ensure data coverage, usability, and quality under specifications of the contract

• Lead Company representative onboard the source vessel

• Functionally reports to Chevron Technical Lead

• Liaise with Technical Lead on node vessel to coordinate activities between source and node vessel

• Interface with personnel onboard to plan and execute survey fieldwork including:

o Sequence and schedule of source line acquisition and swath rolling

o Decisions on close passes to Company assets

• Review and approve the Operator’s daily report

• Write daily, weekly, and final project report integrating data from seismic QC, Data Processing, Nav QC, HES QC, and MMOs, billing and activities from both source and ROV vessels.

Oct 11 – May 13 SAUDI GEOPHYSICAL CONSULTING OFFICE

Project Manager/Geophysical Specialist – Land and Marine Seismic Acquisition/Processing Supervisor – Kingdom of Saudi Arabia, Kuwait, Sudan.

Presented two (2) technical papers “An Update on Seismic Multicomponent Technology", and “Low Frequency Enhance in Seismic Acquisition” at SAPEG 2012 Conference & Exhibition during February 28th – March 1st, 2012, obtaining the best technical paper presentation on “Update on Seismic Multicomponent Technology".

Working as Client Representative for KJO-Khafji Joint Operation (Kuwait Gulf Oil Co. and Aramco Gulf Oil Co.) in Kuwait and Saudi Arabia as Project Manager (Acquisition & Processing Supervisor) on “Huet 4C-3D OBC” marine seismic acquisition/processing project, performing the following activities:

-Technical Audit: Inspect and verify the Geophysical Contractor’s equipment like OBC Cables, energy source and related equipment as per contract specifications

-Technical Audit: Inspect and verify seismic data recording system, navigation and positioning data recording system, navigation and positioning data processing system as per contract specifications

-Technical Audit: Inspection board hardware and software necessary for QC Processing system

-Technical Audit: Inspect Class Certificates issued by various International Agencies for vessels to be deployed by Geophysical Contractor for their use in offshore survey work

-Technical Audit: Inspect HSE equipment of each vessel as per guidelines of SOLAS/MORPOL.

-Review Geophysical Contractor’s corporate HSE procedures, HSE Line organization, plan, reporting procedures and submit a report to Company

-Audit Geophysical Contractor’s crew HSE practices followed onboard

-Ensure that Geophysical Contractor is following HSE procedures, as required by Company and according to industry standards

-Submit written HSE audit reports, as required by the Company

-Design, Coach and Improve Seismic Marine OBC 3D/3C Projects

-Review and approve instrument and equipment acceptance tests prior to survey commencement

-QC the navigation/positioning, acquisition and processing of 4C-3D OBC seismic and OBC navigation data onboard a survey vessel and to assure as much as possible the vector fidelity of the vertical components

- Audit Geophysical Contractor’s personnel to ensure that they are technically qualified and competent to perform all required recording, testing and calibration procedures

- Ensure that all Geophysical Contractor’s operations are carried out within contractual specifications, and meet industry accepted standards

-Quality Control of navigation & positioning data acquisition and onboard navigation & positioning data processing to ensure compliance with required positioning accuracy as per Geophysical Contract specification

-Examine all Geophysical Contractor’s acquired and processed data on a daily basis as appropriate, and recommend the necessary quality control as appropriate and/or requesting the re-acquisition of these data, if required

-Advise and assist the Company's representative(s) onboard to supervise the seismic data acquisition work

-Monitor and verify any chargeable lost time as per Geophysical Contract specifications

-Build a database in order to monitor all seismic data acquired, and prepare and submit daily, weekly, monthly QC report of seismic data acquisition work to the Company

-Impart training to Company’s personnel related to QC procedures and techniques involved in offshore seismic surveys in general and 4C-3D OBC technique in particular

- Quality control geophysical data, which shall include but not limited to, acquisition parameters, testing and field processing, and to assure as much as possible the vector fidelity of the vertical components

- Supervise and control the quality of seismic PP-PS (converted wave) data processing work to be carried out by a seismic contractor

- Recommend the PP-PS data processing sequence and optimum parameters to the Company's representative(s)

- Advise and assist the Company's representative(s) in supervising the PP-PS data processing work.

- Prepare the weekly QC and progress report that shall include the figures and materials to show the work progress and the quality of seismic data processing.

As Project Manager/Field Acquisition/Processing Supervisor (FAPS) in Kuwait and Sudan, I was running as Client Representative of GNPOC-Greater Nile Petroleum Operating Co, PETRONAS, CNPC, Kuwait Joint Operation Co’s as other on different seismic 2D and 3D land acquisition projects as well as conducting/supervising a Microseismic Pilot Project by well passive seismic, performing the following activities:

-As per HSEA concerns: Inspect HSE equipment of each land crew as per guidelines of SOLAS/MORPOL, Review Geophysical Contractor’s corporate HSE procedures, HSE Line organization, plan, reporting procedures and submit a report to Company, Inspect HSE equipment of each crew as per guidelines of SOLAS/IAGC, Audit Geophysical Contractor’s crew HSE practices followed on land crew, Ensure that Geophysical Contractor is following HSE procedures, as required by Company and according to industry standards, Submit written HSE audit reports, as required by the Company,

-Design, Coach and Improve Seismic Land 2D/3D Projects

-Conduct Technical Audit Tests prior to start up acquisition operation,

-Conduct and Supervise a Microseismic Pilot Project by Well Passive Seismic,

-Supervise on-site and quality control 2D/3D Desert, Highland and Swamp Seismic Acquisition programs to ensure efficient and reliable data acquisition,

-Work with various seismic acquisition recording techniques which could use explosives, vibrators and airguns as source of energy,

-Supervise to completion the seismic recording instrument quality assurance tests,

-Provision of daily written summaries of the survey operations, provision of a complete technical and operation survey report at the completion of projects, and provision of line completion report,

-Vetting of all invoices submitted by seismic contractors prior to submission to client for approval,

-Provision of technical advice in pre-survey planning of 2D/3D Desert, Highland and Swamp seismic surveys,

-Review all potential constraints to the survey operations and propose suitable acquisition parameters, systems and techniques to be used to ensure effective and efficient implementation of data acquisition operations,

-Provision of technical advice and QC in selecting the parameters for seismic data processing based on the operational constraints/problems experienced during the survey operations,

-Conduct technical studies and reviews of Geophysical contract specifications and also to propose standard guidelines for the QC Supervision of seismic operations,

-The use of onsite data processing and/or data QC systems. Provide QC supervision of seismic data processing at the processing centre.

Oct 10 – Sep 11 SAUDI ARAMCO OIL CO.

Geophysical Specialist for Technical Support Unit (TSU) of Geophysical Data Acquisition Division (GDAD) of Exploration Operation Division (EOD) – Kingdom of Saudi Arabia

-Working on high productivity & high counter channels seismic acquisition (2D/3D Land & TZ) evaluation and development for new projects/bid tenders/contracts to start first semester of 2012 as per:

oDesign survey parameter: patch-geometry, small VP interval to 12.5m, long offset up to 8000m, array/single sensor spec, single sweep and low frequency enhancement sweep, and Vibrator fleet and source management, as others.

oBuild tables for different test parameters that go into the Technical/Economic bid tenders.

oPreparation of the Technical/Economic final seismic bid package for bidding and contract.

-Working with TSU/GDAD on the new Field QC Procedures and Pre-processing for the new high productivity & high counter channels seismic acquisition contracts.

-Leading tests/QC and evaluation of new technologies as per Low Frequency Sweep, Single Sweep, Broadband 3D/4D//3C/4C Seismic Vibroseis, Streamer, OBC for Land & Marine acquisition, processing as others.

-Leading and Supervising all 2D Seismic Surveys and Non-Seismic Surveys (Gravity Tensor/MMT-CSEM “Marine Magnetoteluric-Control Source Electromagnetic”/Hydrographic) contracts and programs as per tests (design/acquisition/preprocessing/processing parameters), performances, productions, results and final deliveries.

-Helping TSU group of GDAD on:

oPreparing and present workshops in Seismic Geophysics for senior professionals and new geoscientists.

oEvaluation of new seismic companies to participate on bid tenders.

oTechnical evaluation of 3D and 2D bids.

oDesign seismic acquisition for exploration and reservoir characterization clients.

oAcquisition/Processing Seismic Production Supervision and Leading tests acquisition/preprocessing and processing parameters for 3D-3C/4C Land & Marine/OBC/Streamer/Broadband seismic surveys as well as 1500 Single Node acquisition 3D survey test Supervisor.

oConduct and Supervise a Microseismic Pilot Project by Well Passive Seismic.

Jun 04 – May10 PEMEX/FUSION GEOPHYSICAL INC

Geophysicist Senior/Business Development Manager – Mexico, Latin America, New Venture Countries

Strong knowledge of Mexican Energy Laws as per Public Work Law in order to prepare Bids and getting Multi-Annual contracts with some important Petroleum Companies in Mexico, USA, Venezuela, Argentina, Brazil, Colombia, Ecuador, Libya, etc

Operational Management and Technical Supervision & QC of 2D/3D/4D/3C/Multi-components/OBC/OBS (3D4C)/Land/Marine/Transition Processing and Reprocessing, Velocity Model, HDI, AVO, Multi Attributes, Spectral Decomposition, High Resolution Seismic Reflectivity, Seismic Inversion, Seismic Interpretation, Reservoir Characterization, Visualization located in Mexico, Texas, Venezuela, Colombia, Libya, etc.

Supervision and Project Execution with Landmark Software (Time-Depth Conversion, Synthetic Seismogram Elaboration, Velocity Model, Deep Team).

Assist Portfolio Exploration Manager of PEMEX (Petroleos Mexicanos) in order to rank well drilling location using Geological and Standard/New Geophysical Information (Amplitude, Regional AVO, Spectral Decomposition, Relative Acoustic Impedance, High Resolution Seismic Reflectivity) as well as Visualization Techniques.

Leader Asset Team integrating Geological/Geophysical/Production data for Chicontepec group (Golden Belt-Poza Rica-Mexico).

Helping Developing, Marketing and Selling New Geophysical Technologies Software for North and Latin America Petroleum Countries as per Technical Transfer Technology Coaching.

Nov 01 – May 04 PEMEX/CGGVERITAS (VERITAS DGC, INC.)

Geophysicist Senior/Business Development Manager – Mexico

Strong knowledge of Mexican Energy Laws as per Public Work Law too in order to:

Getting Multi-Annual Contracts with PEMEX Petroleos Mexicanos (mainly) and PDVSA (Petroleos de Venezuela).

Operational Management and Technical Supervision and QC of 3D-3C (Multicomponent) Land/Marine/Transition, OBC (3D-4C Multicomponent) Acquisition, Processing, Seismic Interpretation, Reservoir Characterization and Visualization Projects, supervising also main technical aspects of all contract projects with PEMEX.

Getting a Sale Contract of SPEC Seismic Data and



Contact this candidate