|
Resume alert |
Resumes 81 - 90 of 150 |
El Omraniya, Giza Governorate, Egypt
... in the Field of power plant, (GTG-CCGT-STG) Familiar with, GE, Doosan and Veolia machines, Water& waste-water treatment, Simple & combined cycle power plants start-up, Commissioning, operations and shutdown Planning through chemistry side. ...
- 2020 Feb 08
Giza, Giza Governorate, Egypt
... Water and wastewater treatment systems. Digital Marketing. Detail oriented. Education: High Studies Post graduate diploma of Environmental Engineering – Cairo University Graduation Year : May, 2009 Graduation Grade : Good (75.3%) Graduation Project ...
- 2020 Feb 04
Cairo, Cairo Governorate, Egypt
... • Water supply and drainage Networks for TV and Broadcasting Building. Engineering and Industrial Projects Company Oct 1990 - Sep 1991 Site Engineer Responsibilities: • Executing wastewater treatment station El-Obour Market consisting of main • ...
- 2020 Jan 16
Cairo, Cairo Governorate, Egypt
... Training Experience: 2007-2008 El Nasr Company of Petrol Work Experience: -Advanced Chemical Treatment (ACT) Water Treatment Company, from December 2012 till Jan 2016 Job Responsibilities: 1. Customer Technical Support 2. Preparing and Following up ...
- 2019 Dec 26
Cairo, Cairo Governorate, Egypt
... (A Member of SWAILAM Group – Riyadh – KSA) Erection Manager • Carrying out technical Evaluation, follow up of water & sewage projects execution up to commencement. • Preparing/Reviewing all designs of Water & Sewage Treatment Plants (Minimum 20,000 ...
- 2019 Aug 04
Cairo, Cairo Governorate, Egypt
... (d) Swimming pool & water fall. (E) (11) eleven elevators. (F) Spa area including massage rooms, gym area & treatment and changing rooms (G) Jacketing for R.C foundation and columns. (D.2.) FOR ICECO (LEBANESE CO.): *ICECO I.D. (INDUSTRIAL ...
- 2019 Jan 05
Cairo, Cairo Governorate, Egypt
... - Water treatment. Mostafa Abdel Aziz Mohamed Elmatrawy – production section head Achievements and Projects : 1- Replacement manual counting and packing with automatic machines which reduce the cost of this section by increasing production and ...
- 2018 Oct 19
Cairo, Cairo Governorate, Egypt
... document for all equipment 3-Mechanical erection works include ;- *Erection two boiler with capacity 100 ton/h and water treatment plant include (water pumps-carbon steel pipeline –valves-tanks –fuel pumps – heat exchangers-air duct-fuel pipe – ...
- 2018 Oct 10
Cairo, Cairo Governorate, Egypt
... For: Water and Waste Water Treatment Plants, Pump stations, Tanks (Ground, and Elevated), Retaining Walls, High rise towers, Malls, administrative buildings, Garages, and religious buildings. Providing shop drawings, Tracking sub contractors’ ...
- 2018 Sep 21
Cairo, Cairo Governorate, Egypt
... gas Participating with Aramco in determining the required treatment chemicals for highly sour gas Running an intelligent ... daily reports to company office and managers Training courses: -Water Shut Off Techniques, Mar 2009 Conducted in Middle East ...
- 2018 Sep 19