Post Job Free

Resume

Sign in

Power Plant Water Treatment

Location:
Cairo, Cairo Governorate, Egypt
Salary:
10000$ / month
Posted:
October 10, 2018

Contact this candidate

Resume:

Reda - C V

Name Reda Mohamed Ahmed Ahmed Wahb

Email ac7b7v@r.postjobfree.com

Education BSC in Mechanical Power Engineering 1974 (Menoufia University )

Address ……; Kafr Abdou – Qwissina – Menoufia – Egypt

Birth Date 28 / 12 / 1950 at Menoufia

Religion ….; Muslim

Marital Status….. ; Marriage + 3

Mobile 002/0122/ 3178476

Passport Number.: EGY - A15699183 - issues at 22/7/2015

Egyptians Identification Card No. ; 250***********

Special licenses….; No. 250*********** Menoufia – Egypt

BASED ON MY WORK EXPERIENCE AND QUALIFICATIONS,

1 -Mechanical design works

2 -Mechanical erection works

3 -Technical office works

1-Mechanical design works include;-

1- 1 - Design Fire protection and fire extinguishing system

1- 2 - design for water pump station for underground water include *Design water well specification diameter pipes;- and screen pipe type – well pipe materials - depth of well-cleaning and testing methods for wells -production capacity - discharge pipe diameter and materials- all suction pumps type and specification

*Design steel tanks (fabrication - tank inlet- outlet –drain pipe –roof vent – manholes – etc ) for portable water storage tanks

* Preparation welding procedures for pipelines

1-3 design,erection and manufactured overhead crane

1-4 - fabrication, Installation, operation and maintenance batch cement mixer

2-Mechanical maintenance works include;-

* motors (Diesel – Benzene),gearbox, clutch, power train, steering system, brake system, cooling system, water pump, fuel pump, differential unit, carburetor, injection system and hydrauli#c systems .

* Rehabilitation fuel supply plant for Alexandria airport (replace fire fighting protected system – tanks - water pipes – air compressors engine -Water pump - foam tank –control system -control panels - maintenance for storage tank –fuel pipe (by my contract office)

*Rehabilitation fire fighting system for El khoms power station-in Libya- include; ( redesign and scope of work-prices offers) for replace main pipeline – Overhaul for 2 diesel driver with power 1000 kw and 2 vertical pump–replace foam ( high pressure) pump –Alarm system –heat Detectors–foam mixing tanks and equipments - replace deluge control valves– air compressors – etc for El khoms power station -in Libya

*Maintenance and Overhaul skills for air compressors engines, valves, steam boilers, water pump plants, Overhead Crane - fork lifts – Natural gas compressors and hydraulic systems loaders, tractors, dozers, graders, sand washing machine and crusher (ball, cone, hammer crushers ),Vehicles, screening vibrators, crane ….etc *Provide daily reporting operation, preventative maintenance troubleshooting, inspection work, spare part statues, routine periodical maintenance document for all equipment

3-Mechanical erection works include ;-

*Erection two boiler with capacity 100 ton/h and water treatment plant include (water pumps-carbon steel pipeline –valves-tanks –fuel pumps – heat exchangers-air duct-fuel pipe – fuel tanks)

* Erection for medicine oil unite in American for petroleum include :-

*fabricated and erected ten fuel storage tanks every one 500 m3-

*Erection ten solar pumps with Electric motor driver 100 KW in Ameria for petroleum ) *Erection 2 Nitrogen Compressors in American for petroleum *fabricated and erected steel pipeline with length 3000 m and erection pipeline rack in Ameria for petroleum )

*Erected multistory steel support with weight 347ton in (Elmesria for cement)

* Fabricated and erected cylindrical (fuel–water)Tanks at (Arab contractor) *Erection Rolling mill engines for Awlad Beshai Factory at Saddat city with total weight 820 ton

4- Steel structure(fabricated-Erection)Work include;-

* Supply and erected workshop house steel building in kock company in Helwan with area 4000 m2 (by my contract office )

*Supply and erected steel Building for factory with area 2000 m2 (by my contract Office)

*(fabricated-Erection Conveyor belt with wide 1.8 m and 160m length in Kock Company in Helwan (by my contract. Office)

* Design and supply-steel fabricated and erection for 15 Overhead Crane six moving in 15 water Pump house in El bahr-El Ahmar government (by my contract. office)

* Fabricated and erected cement filter with weight 420 ton at Elmasria for cement in Suez city

*Erection works for 117 Electric towers for high Volts at kahromica Libya branch

5-Technical office works include ;-

*Technical Report for rehabilitation fire fighting system for El khoms power station-in Libya-include; - (scope of work-prices offers) for replace main pipeline –replace ( main control panel) - Overhaul for 2 diesel driver-replace foam ( high pressure) pump –Alarm system–heat Detectors –foam mixing tanks and equipments -replace deluge control valves-air compressors

*Technical Report and Prices offers for Rehabilitation for SEA WATER DESALINATION plant at Zeleten (Libya)

*Technical Report and Prices offers for Rehabilitation for Ten water treatment plants at ALEXANDRIA government

* Design and prices offers for main Natural GAS pipeline for feeding boilers at El khoms power station (Libya) include ; - Valves –steel supports –survey works –concrete foundation –pipeline branches – pipe schedules and material –pipe rack.

*Design, fabricated and erected for steel CABLE TRAY hanged under wady keam Bridge with length 210 m (Libya)

6 - Professional in Project Management skills as follows:

Financial Management

Communications Management

Document Control

Project Logistics Management

Progress Reporting

Project Integration Management

Project Time Management

Project Scope Management

Quality Management

Risk and Opportunity Management

7 - Personal skills include ;-

*Computer skills; (Word - Internet - AutoCAD )

* Professional in Communication Skills

* GOOD USER FOR INTERNATIONAL STANDERED SYSTEM (API, ASTM, AWWA, AWS, BSI, DIN) and (ASHRAE, SMACNA, NFPA)

*Language--; good in English and Arabic

*Good knowledge in Civil work (Surveyors works - concrete Foundation * Provided Daily Preventative and troubleshoots Maintenance and Overhaul skills for (Diesel – Benzene)Engine and forklift, air compressors engines, hydraulic systems, steam boilers, water treatment plants, valves, chiller units, HVAC equipments and Natural gas compressors

*Good knowledge in Electro-Mechanical Works

*Professional in applied project management system (PMS) Include;- Planning, Executing Processes, Controlling, Performance data

*Good users Primavera Project Planner and maintenance.. etc.

Professional in follows:

*Installation, operation and maintenance batch cement mixer

Design, fabrication, erection and maintenance for pipeline, cement silos, diesel engines, concrete mounted truck mixers and pumps, belt conveyer, concrete mixers,water tank and water pump and cement screw conveyers and Steel structure (fabricated-Erection) work .

*Power station plant and design of Solar power Plants include ; -

maintenance, overhaul . design and erection for (fire fighting systems, air condition system, pipeline, valves, Boiler and design of Solar power Plants )

* water treatment plants, and sewage treatment plants includes;

Design and erection maintenance, overhaul for Underground water well, Sea water desalination Plants, water pumps plant, turbidity water treatment plant, sewage treatment plants, pipeline and valves

*Installation, operation and maintenance construction equipment include;-

Steel structure (fabricated-Erection) work, belt conveyer – wheel loaders, tractors, dozers, graders, crusher (ball, cone, hammer crushers, Spring Cone Crusher ),Vehicles, screening vibrators, truck, telescopic boom cranes, tower cranes, truck mounted concrete pumps, central concrete mixer, truck mounted concrete mixer, generator set, ….etc

*Fabrication, Installation, operation and maintenance cement factories

fabrication, erection and maintenance for pipeline, cement kiln, cement mill (ball, cone), crushers, dusts collector (Electrostatic Precipitator), belt conveyer, Burner System for Rotary Kilns, cyclone preheated plus precalciner, Cement grinding and storage, Grinding of Raw Materials and storage and Steel structure (fabricated-Erection) work .

At last six year

8 - I Recorded patent for double effected produced solar power plant and prepared technical specification for integrated double effect solar power plant and PEM Hydrogen fuel cell plant with total capacity 300 mw .

9 – I prepared business plan for Integrated Agriculture – Industrial Areas Using Sea water as Raw Material and Solar Power Energy to Establishment Integrated Agriculture – Industrial Areas and used integrated Double effect Solar Power plants and PEM fuel cell plants with total capacity 300 mw as Resource of energy

10 - I prepared business plan for Integrated chemical Industrial area depended on Using Sewage water as Raw Material for produced organic fertilizers and Extraction Hydrogen, Ammonia, Biogas and another elements with area 200 acres .

Thanks

Reda Mohamed Ahmed Ahmed Wahb

More Explanation at Facebook Page

https://www.facebook.com/reda.wahb.961



Contact this candidate