Post Job Free

Resume

Sign in

Project Manager

Location:
Cairo, Cairo Governorate, Egypt
Salary:
7500$
Posted:
January 05, 2019

Contact this candidate

Resume:

Page - * - of *

C.V MAMDOUH MOUNIR HANNA

PROJECTS MANAGER

****-********** (Iraq)

+201*********(Egypt).

+201*********(Egypt)

E -mail: mamdouh hanna 1956 @ gmail.com

(A)PERSONAL INFORMATIONS:-

A.1.EXPERIENCES: 38 years engineering services)

A.2.OBJECTIVE : JOINING IN SUCCISFUL CHALINGING TASKS A.3.MEMBERSHIP

: SYNDICATE OF ENGINEERS (A.R.E).REGESTERED,

.BIRTH DATE : 27/5/1956

A.3.NATIONALITY: EGYPTIAN.

A.4.MARITAL ST. : MARRIED.

A.5.RESIDENCE : 9 OBOUR BUILDINGS SALAH SALEM STR.CAIRO/EGYPT

(HOME).

(B) ACADEMIC ACHIEVEMENTS:

(1)DEGREE: B.Sc.1979 CIVIL Engineering (A.S.U.) Aim Shams University. Cairo Egypt (international college in Egypt).

(C)KEY EXPERIENCE IN Iraq; (2015-2017);-

(C.1.) CURRENT BUISENESS; ENGINEERING

SERVICES FOR THE FOLLOWING FIRMS:-

C.1.1-SEG Enterprise (Iraq Branch)

(C.2.) BRIEFING FOR EXP.HISTORY IN Iraq;

From: TO EMPLOYER NATIONALITY POSITION PROJECTS LOCAT. 2015 till 2017 SEG Enterprise Lebanese PM. Investment Residential Project Al Kout C.1.1-SEG Enterprise (Morocco Branch)

(C.2.) BRIEFING FOR EXP.HISTORY IN Morocco;

From: TO EMPLOYER NATIONALITY POSITION PROJECTS LOCAT. 2011 till 2015 SEG Enterprise Lebanese PM. Alliance Compound Tetoaun Page - 2 - of 6

2008 till 2011 SEG Enterprise Lebanese PM. Sable D’or Tangier

(C)KEY EXPERIENCE IN LIBYA; (2003-2007);-

(C.1.) CURRENT BUISENESS; ENGINEERING

SERVICES FOR THE FOLLOWING FIRMS:-

C.1.1-ICECO CO. (INDUSTRIAL&CONSTRUCTION SERVICES(Libyan branch) LEBNON CO. /LEBANON-QATAR-LIBYA.

C.1.2 G&D co. (ITALIAN CO.-LIBYAN BRANCH).

(C.2.) BRIEFING FOR EXP.HISTORY IN LIBYA;

From: TO EMPLOYER NATIONALITY POSITION PROJECTS LOCAT. 2007 till present MAN Enterprise Lebanese Sec. Eng. WADDAN Hotel TRIPOLI 2006; 2007 ICECO Lebanese P.M. WADDAN hotel TRIPOLI 2005:2006 G&D Italian P.M HOTEL TRIPOLI

2005:2006 G&D Italian P.M. VILLA MUSRATA

2004:2005 G&D Italian P.M. HOTEL MUSRATA

2004:2005 G&D Italian P.M. S.T.PLANT MUSRATA

2003:2004 G&D Italian P.M. SCHOOL MUSRATA

(C.3.) BRIEFING FOR EXP.HISTORY IN EGYPT; - .

C.3.1-(1997;2001) FOR THE (A.C.CO.)AMERICAN CENTER AS FOLLOWS: PROJECT POSITION LOCATION

3.1.1- (SANYO) ELCTRONIC FACTORY PM AL EBOUR CITY/CAIRO. 3.1.2- WORK SHOPS(134000m2) PM AL EBOUR CITY/CAIRO. 3.1.3- (TOURIST COMPOUND) PM SHARM EL SHEKH/RED SEA COAST. 3.1.4- (TOURIST VILLEGE) PM SHARM EL SHEKH/RED SEA COAST C.3.2-(1989;1997) PRIV. BUSINESS (CONTRACTOR) AS FOLLOWS: PROJECT BUDGET LOCATION

3.2.1- SWIMMING POOLS (TURNKEY JOB) 850,000 Group of Private Villas (Red Sea Coast) 3.2.2- DOMESTIC/SANITARY WATER STATIONS 80,000 Semeramis Hotel (Cairo). 3.2.3- DOMESTIC/SANITARY WATER STATIONS 76,000 Meridian Hotel (Cairo). 3.2.4- DOMESTIC/SANITARY WATER STATIONS 220,000 Sheraton Hotel (Hurghada). 3.2.5- DOMESTIC/SANITARY WATER STATIONS 155,000 Movenpic Hotel (Hurghada). Page - 3 - of 6

3.2.6- DOMESTIC/SANITARY WATER STATIONS 220,000 Magawish Resort (Hurghada) 3.2.7- HELTHY CLUPS (TURNKEY) COMPLETE 320,000 Different locations C.3.3-(1979:1989) FOR THE GULF STAR CO.( KUWIT.CO.) AS FOLLOWS: PROJECT POSITION LOCATION

3.3.1- A .A INTERNATIONAL BANK S. ENG. CAIRO/EGYPT

--C.4 -(1979:1989) FOR THE GULF STAR CO.(IN KUWIT) AS FOLLOWS: PROJECT POSITION LOCATION

.4.1- (5) PRIVATE ROIALL PALACES S. ENG. KUWIT CITY.

.4.2- (4) PRIVATE LUXORY VILLAS S. ENG. KUWIT CITY 4.3- ESKO FOAM FACTORY S. ENG. KUWIT CITY

4.4- A .A INTERNATIONAL BANK S. ENG. KUWIT CITY

(D) EXPERIENCES RECORD IN LIBYA:-

(D.1.) FOR MAN Enterprise (LEBANESE CO.):

*MAN I.D. GENERAL MANAGER MICHEAL ABOU NADIR,

(38YEARS@LEBANON/LIBYA/QATAR/SUDAN/IRAQ/DUBAI/JORDAN/NIGERIA).

(D.1.1) PROJECT (1)2007:

AL-WADDAN HOTEL(REPAIRING-RENOVATION).

-CLIENT: MAGNA (MULTINATIONAL).

-CONSULTANT: DAR ALHANDASA (EGYPTIAN).

- SCOPE:

(a) Basement floor including all civil works for mechanical & electrical rooms.

(b) Steel structure for roof, bridges, tent at courtyard, escape stairs & strengthen on ballroom structure.

(c) R.C for gas tank, chillers & fuel tanks.

(d) Swimming pool & water fall.

(E) (11) eleven elevators.

(F) Spa area including massage rooms, gym area & treatment and changing rooms

(G) Jacketing for R.C foundation and columns.

(D.2.) FOR ICECO (LEBANESE CO.):

*ICECO I.D. (INDUSTRIAL&CONTRACTING ENGINEERING COMPANY) GENERAL MANAGER BAHIG HAWY,

(25YEARS@LIBANON/LIBYA/QATAR).

(D.2.1) PROJECT (1)2007:

AL-WADDAN HOTEL(REPAIRING-RENOVATION).

Page - 4 - of 6

-CLIENT: MAGNA (MULTINATIONAL).

-CONSULTANT: DAR ALHANDASA (EGYPTIAN).

- SCOPE :

-( a) COMPLETE THE FINISHING PROCESS(ST.2006)

(b)COORDINATION ( THE OWNER&COLTANTNSU).

(c) DIRECTING ALL RESOURCES

(d) CASH FLOW CONTROL.

(D.3.) FOR G&D :

* G&D I.D. ITALIN COMPANY-25YEARS EXP. IN CONSTRUCTION PROJECTS . ACTIVITIES: IN LIBYA/JORDAN/K.S.A./LIBANON

BRANCHES : IN LIBYA-K.S.A.

(D.3.1) PROJECT-1(03/04):

HIGH SCHOOL-MUSRATA.

TITLE: PROJECT MANAGER.

SCOPE:

(A) Assisting in tendering and contract award.

(B) Coordination between the company; the client and the supervisor engineers.

(c)Directing the const.tools (labor-materials-equipments)

(D) Setup the control systems (TIME-MONEY-QUALITY).

(E) involved in the civil design drawings

(D.3.2) - PROJECT-2(04/05:

SEWAGE TREATMENTPLANT

-LOCATION:MUSRATA,

-TITLE: P.M.

-SCOPE:(MAINTENANCE-CONTRACT).

(A) Assisting in tendering and contract award.

(B) Revising contract scope of work.

(c)Directing the const. tools

(D) Setup the workshop drawings. .

(E) Assisting in as built drawings.

(D.3.3)PROJECT-3(04/05) : HOTEL.

Page - 5 - of 6

- LOCATION:MUSRATA,

-TITLE: P.M.

-SCOPE:(CONSRUCTION-CONTRACT).

(A)Setup the workshop drawings.

(B) Revising contract scope of work.

(c) Directing the const. tools

(F) Assisting in as built drawings.

(D.3.4.) PROJECT-4(04/05)HOTEL.

LOCATION:TRIPOLI

-TITLE: P.M.

-SCOPE:(CONSRUCTION-CONTRACT)

(A) Setup the workshop drawings.

(B) Revising contract scope of work.

(c)Directing the const. tools

(D)Surveying works and soil investigation and excavation

(E)Reinforced concrete works

(F)Finishes in high quality

(G)Site organization around the building

(D.3.5.)PROJECT-5(05/06): PRIVATE VILLA&SWIMMING POOL. LOCATION:MUSRATA.

-TITLE: P.M.

-SCOPE:(CONSRUCTION-CONTRACT)

(A) Setup the workshop drawings.

(B) Surveying works and soil investigation and excavation

(C) Reinforced concrete works

(D) Finishes in high quality

(E) Site organization around the building

Page - 6 - of 6

(E)-Personal Skills:

-Communication,

-Negotiation,

-Presentation,

-Work in groups,

-Self motivated,

-Excellent in fast knowledge gaining.Sportive fitness.

-Driving: cars (2*4-4*4), double cabin, vans,

(E.1.)Computer Skills:

-MICROSOFT XP (WORD /EXCELL).

-Win project planning.

(E.2.)LANGUAGES

Arabic: Mother Tongue

English: Fluently

French: Fair

THANK YOU FOR ATTENTION;

DOCUMENTS ARE AT REQUISTE.

ENG. M.HANNA.



Contact this candidate