Milton, ON, Canada
... Documents & Costs • Savvy in all aspects of construction management practices and principles, construction techniques and practices, including construction of multi-million wind, hydroelectric, solar, turbine, and thermal plants to completion. ...
- Oct 27
Riyadh, Saudi Arabia
... Gas Turbine Frame 9 Mark 4 at G.E. factories in the USA, including South Carolina (Greenville) and New York. SCADA system installation in SANG, Riyadh, Saudi Arabia. Pumps: Grundfos KSP DP in Riyadh, Saudi Arabia. Filmtec Membrane & Rosa software. ...
- Oct 24
Al Dafna, Qatar
... Frame 5 GAS Turbine AKG1 Client: Ras Gas Period: May 2013 to August 2013 Position: QC Inspector Project: Jetty Boil off Gas Recovery Project Client: Qatar Gas Duties and Responsibilities: Reviewing of QCP’s, ITP’s, Method Statement & NDT procedures. ...
- Oct 24
Bengaluru, Karnataka, India
... 1X25 & 1X30MW Steam turbine, Captive Power Plant-SIEMENS 12. 109MW HFO based power plant (8.77 MW x 12 DG + 3.7MW x 1 STG) 13. 40MW Diesel (LDO) based power plant (5 X 8.769 MW, 11 KV Hyundai DG sets) 14. GP Toledo boiler plant- Smart P&ID drawings. ...
- Oct 22
Johannesburg, Gauteng, South Africa
... Manage Renewable energy projects for MTN (Solar, Wind turbine, Genset, DC Power, UPS). 6. Sourcing and evaluation of product and services for use on projects. 7. Risk analysis on large projects / tenders carried out. 8. Management of maintenance of ...
- Oct 22
Arsikere, Karnataka, India
... Additional components include bypass stacks of 350 MT each, boiler feed water tanks, gas turbine diffusers, gas turbine auxiliary piping, 30 cubic meter carbon steel oil storage tanks, and stainless-steel demineralized water tanks. Responsibilities ...
- Oct 21
Al Khobar, Eastern, Saudi Arabia
... Responsibilities: Worked for the construction site of The KCP Limited supplied Self-setting mills, Centrifugal machines, and Co- generation power plant of 6MW turbine with alternator including 80 Ton water tube boiler, piping & equipment erection ...
- Oct 20
Bhubaneswar, Odisha, India
... M/S Vedanta Limited : .Worked as start up, commissioning & O & M In-Charge of 9x135 MW Shanghai Electric Boiler & Turbine with associated 460 -TPH, PF-boiler &auxiliaries, from cold start up, hot start up, planned shutdown of unit and Unit ...
- Oct 20
Accra, Greater Accra, Ghana
... and air in line with SOPs to achieve set targets and report on any abnormalities for immediate action • Operated steam turbine/electric air compressor and fire-fighting water pumps • Operated steam turbine driven generator (STG), refinery cooling ...
- Oct 20
Port St. Lucie, FL
... Job Title: Project Engineer Responsibilities: ● Coordinated all project resources in the manufacturing of industrial gas turbine hot section components ● Researched, reviewed and qualified all applicable suppliers to enhance supply chain resource ...
- Oct 19