Clay Brackpool
**** ******* ****, *********, ** *2027 760-***-**** *******@*****.***
Objective
General / Senior - Project Superintendent
Qualifications
Construction Experience
Superintendent – 40 years (San Diego, California)
General Information
General or Senior Superintendent, managing projects of construction value from $1,000,000.00 to $1,300,000,000.00.
Project Use – office, military, hospitality, school, retail, hospital, residential, mixed use, casino, civil & site development, industrial, multi-family
Construction Types – structural steel, structural concrete, CMU, light gauge metal stud, wood framing, single story, low-rise, mid-rise, high-rise, tilt-up & below grade structures.
Pre-Construction – partnering with owners, architects and engineers. Design-build team, pre-construction planning, value engineering, development of sub-contract scopes, site logistics plans, traffic control plans, SWPPP plans.
Scheduling – can create & maintain any size master schedule, pull planning, look-ahead status schedules, fragnet, and recovery schedules.
Program Skills – Word, Excel, Bluebeam, Plangrid, Procore, Project Site
Scheduling - P6, Suretrak, Microsoft Project, Excel 3-6 week
Safety Management – development and implementation of site & structure safety plans including AHAs, emergency evacuation, development of cranes & hoisting safety plans, traffic control and enforcement of daily safety related issues.
SWPPP – State Certified QSP (currently inactive)
Management – daily coordination of general contracting field staff, sub-contractor management and workers, procurement of material, sub-contractor billing verification, general conditions tracking and documentation through completion of the project. Hiring and managing self-performed labor. Coding & labor cost tracking.
Team Builder, & Motivated Manager. Respected by Owners, Architects, Engineers, GC Teams & Subcontractors. Enjoy mentoring and challenges.
Education and
Training
La Canada High School: Diploma
Palomar College: General Education, Architectural Design, Structural Plan Review, Building Codes and Estimating
TRAININGS: First Aid & CPR, Asbestos Awareness, Toxic Mold, Substance Abuse, CAL-OSHA (OSHA 30), Competent Person, OSHPD Training for Inspector Certification, Mechanics Liens, Stop Notices & Bond Claims, Philosophy of Scheduling, Suretrak Scheduling, P6 Scheduling, Claims/Delay Analysis, Crisis Management, Sales Process, Presentation Skills, ACI Concrete Slabs, Crane Regulations, Crane Safety, Traffic Control, Fall Protection, Scaffold Safety, Negotiating, Leadership Training, SWPPP QSP State Certified, EM 385-1.1.
Experience
TB Penick & Sons, Inc.
General Superintendent
(February 2023 to present)
Kitchell Corp.
Superintendent
(May 2021 to February 2023)
Clark Construction
Superintendent
(May 2018 to May 2021)
TSA Construction
Superintendent
(February 2018 to May 2018)
The Ryan Companies
Sr. Superintendent
(November 2017 to February 2018)
CW Driver/
Westfield
Sr. Superintendent
(June 2017 to November 2017)
CW Driver
Superintendent
(January 2015 to June 2017)
A&D Construction
Senior Superintendent
(October 2014 to December 2014)
RQ Construction
Project Superintendent
(September 2012 to Oct 2014)
TB Penick
Senior Superintendent/Project Manager (January 2012 to September 2012)
Project History
Aero Drive / Clairemont Mesa Drive – Multi-Family Apartments - $65,000,000 each
Demo of existing structures
(2) 8 Story Multi-family projects – Aero Drive: 302 apartment units – CMB: 251 apartment units
(2) UG Parking Structures – (1) one-story UG structure & (1) 2-story UG structure
Coronado Island Marriot Resort Sea Wall – Replacement (during open hotel operation)
Demo & Replacement of an existing seawall along the boardwalk on the Bay
Pool Area and Site upgrades
Close coordination with the Port District
Theater District Living and Learning Neighborhood - $500,000,000
25 Acres
5 Residential Complexes
3 Story Underground Parking
Site Improvements
UCSD North Torrey Pines Living and Learning Neighborhood – $500,000,000
New Campus on 25 acres
Demolition & Mass Grading of existing facilities
6 new Buildings on a (3) story Underground Parking Garage including (2) 13 story Apartment Buildings, (1) 10-story Mixed Use, (5) story Mixed Use and Auditoriums, (1) Major Auditorium
New U.G. Utilities
Building One – Academic Offices, Classrooms, Auditoriums
Sitework
Pechanga – Small Projects - $10,000,000
Completion of small projects including renovation of an RV area Clubhouse, RV campsites, Amenities Area, Sitework, & Punchlist
Pacific Vista Commerce Center - $20,000,000
(30) acre site - mass grading & underground utilities for 411,000 sq. ft Distribution Center
University Town Center Mall - $750,000,000
(5) Story Post Tension 2,330 stall Parking Garage
MTS Bus Transit Center
300,000sq ft of New Retail Space
Concourse including (2) water features and a Koi Pond
Hollywood Casino Jamul - $360,000,000
(8) Story Underground Post Tension CIP Garage
Casino & Administration
(100’) Tall Early Concrete Elements to Erect Structural Steel Casino & Admin Floor
(8) Story Garage built after Structural Steel
(4) Story Central Plant
Waste Water Treatment Plant
Training Tank (Job Start-Up) – Camp Pendleton - $6,000,000
Training Pool
(2) Story Classroom Building
P880 Rotary Aircraft Maintenance Facility – North Island Naval Air Station - $50,000,000
(4) Super Hanger Quads
(2) Story Administration
Demolition of existing maintenance Buildings and (25) acre Tarmac
On Site Crushing Plant – Re-cycled all tarmac concrete
Extensive Utility Infrastructure
Scripps Ranch High School – Sustainable Technologies Campus - $15,000,000.00
(5) structures
(2) labs
Computer room & office
Photovoltaic System
Wind Turbine System
Rain Water Recovery System
(2) outdoor amphitheaters
Sundial
Turner-Penick Joint Venture
Senior Superintendent
(September 2009 to December 2011)
Bachelor Enlisted Quarters – Package 7 - $125,000,000.00
10-acre BEQ site including demo of existing UMH lot & mass grading
All work done in coordination with Environmental Services protecting Federally protected wildlife
(3) 5-story CMU/concrete Marine Living Quarter structures
3 Community buildings
Site amenities include 7 CMU/steel BBQ & shade structures, basketball courts, volleyball court, horseshoe pits, exercise circuits, 2 amphitheaters, martial-arts pits.
New 200,000 sq. ft. parking lot following demo of 5 existing concrete barracks.
Sewer Treatment Plant #12 & 1 mile of new sewer & gas services to the site
BSD Builders
Superintendent
(September 2008 to August 2009)
Inland Valley Medical Center - $25,000,000.00
OSHPD
Wood framed – single story
3 new wings including ICU, major treatment, MRI & Rad-Tomo rooms
New Porte-Cochere & ambulance arrival canopies
New parking lot & landscaping at new wings
Webcor
Superintendent
(January 2007 to September 2008)
Discovery – Building D phase 1 - $2,000,000.00
Demolition of existing 2-story tilt-up structure & parking lot
Mass grading including crushing & recycling existing concrete & asphalt
Underground utilities for future 86,000 sq. ft. 3-story structure
Site work includes new concrete curbs, planters, light pole bases & poles
4800 gallon storm-ceptor & holding tank
Webcor
Discovery – Building C Lobby - $200,000.00
1500 sq. ft. T.I. in existing building
Metal stud & drywall
Tile floor finishes
Hyatt Islandia Hotel and Spa (occupied) - $40,000,000.00
17 Story Tower
Renovation of 250 guest rooms, lobby and meeting rooms
New spa and bar
3-Story Building
Renovation of 60 guest rooms
2-Story Buildings (2)
Renovation of 80 guest rooms
Renovation of main lobby
Porte-Cochere & 3 heavy timber wood trellis structures
Restaurant (on concrete pilings over water)
Demo & complete renovation of dining room, bar and kitchens
Removal & replacement of deteriorated primary structural members
New 65-foot bridge from marina boardwalk to restaurant structure using 300-ton crane. Included added structural steel deck members using 190-ton crane & hoisting over restaurant structure
Some work required plumbing and electrical rough-in from a floating platform beneath restaurant, following strict OSHA requirements
Fitness Center
Renovation & transition of an existing restaurant to a fitness center on pilings over the water at the marina
New handicapped bathroom
Wheelchair lift on exterior of structure
Grounds
Demolition included parking lots, pools, koi pond, pool equipment and plant materials
New construction included underground utilities, driveway approaches, A.C. paving – 2 parking lots. 3 pools, 1 spa and 3 waterslides on mountain built over pool vault.
900-sq. ft. semi-recessed concrete pool vault & equipment. Structure base at 5’ below sea level required dewatering system
Extensive landscape and irrigation included 120 new trees, boulder walls on geo-textile retaining wall system
Multiple existing & undocumented utilities required extensive investigation & coordination with utility & landscape consultants. Required revised design of grounds
Turner Construction
General Superintendent (July 2005 to January 2007)
Del Mar Grand Hotel and Spa - $185,000,000.00
5 Star, 360 Room luxury hotel and spa – Del Mar, California
Mass grading of 25-acre site included hotel pad and ten pads for 5,000 sq. ft. Villas
Grand ballroom
2 dining rooms
2 kitchens
3 bars
Chapel, Lounge, library and lobby
9 elevators
Retail spaces
Central plant and Loading Dock
Water features and 3 Pools
Event Lawn
Swinerton Builders
Project Superintendent (August 1999-June 2005)
Egyptian Condominium & Mixed Use - $23,000,000.00
5 Star, 360 Room luxury hotel and spa – Del Mar, California
Mass grading of 25-acre site included hotel pad and ten 15,000-sq. ft. villa pads
5 Retail Spaces (ground level)
2-level underground parking garage
Public improvements included raised traffic medians on Park Blvd. and University Ave. Removal and replacement of concrete paving surrounding the site
Reconstruction of historical building – Fox Egyptian Theater
Swinerton Builders
Omni Metropolitan Condominiums - $15,000,000.00
10 floors – 34 luxury condominiums in the 32-story high-rise hotel building overlooking Petco Ballpark
Condominium construction sequence required close coordination with simultaneous construction of the shell building and hotel build-out
Swinerton Builders
Union Tribune Pre-cast panel replacement - $3,000,000.00
Removal and replacement of 244 deteriorating pre-cast panels from the 5-story administration building, 3-story production building and 1-story service garage
Scope of work included scaffolding, demolition, waterproofing and development of pre-cast connection design. A complicated schedule was required including over 400 tasks to ensure the operating newspaper facility would not be impacted and the safety of the 1500 employees
Swinerton Builders
Monarch at Scripps Ranch - $4,500,000.00
New construction of a 3-story, 59,748 sq. ft. steel-framed office building with stone clad exterior
High-end lobby including stone flooring and wood finishes
Site development including pad and preparations for twin building and parking structure, parking lot and public street development
Koll Construction
Project Superintendent (February 1998 to August 1999)
Vista Industrial - $10,000,000.00
New construction of 2 tilt-up buildings and site work. One 69,000 sq. ft. warehouse with a 4,000 sq. ft. mezzanine and one 89,000 sq. ft. warehouse with a 4,500 sq. ft. mezzanine
This project was successfully completed on an accelerated 6 month schedule despite a complex and lengthy permitting process
Koll Construction
Grand Pacific Resort - $35,000,000.00
New construction of the main resort building including the first floor lobby and the second and third floor office spaces as well as a pool and water feature
Project scope also included the construction of a subterranean parking structure
Reno Construction
Project Superintendent
(March 1996 to February 1998)
Data Works - $10,000,000.00
New Construction of two 60,000 sq. ft. tilt-up buildings and a full tenant build-out
Kilroy Corporate Center - $10,000,000.00
New 60-acre subdivision including new and relocated underground utilities and services to 8 building pads
Project scope also included a new public street, widening of the existing street and slope landscape
Piazza Carmel – Phase I - $5,000,000.00
Site development and underground utilities for Phase I (Lots 7 and 8) including mass site grading and geo-grid retaining wall, landscaping and extensive street improvements
Kaufman & Broad - $2,500,000.00
A 30,000 sq. ft. tenant improvement completed in a 1st floor office space
Intuit - $100,000.00
Emergency generator and enclosure at existing facility
Work included interconnection to existing electrical system and site paving
AMCC - $10,000,000.00
New construction of a 120,000 sq. ft., 2-story tilt-up building and complete build-out
Grading and underground services for computer chip manufacturing including clean room, central plant, paving and landscaping
Contract included coordination of all systems, furniture delivery and installation
Rip Curl - $1,000,000.00
A tenant improvement project comprised of a 10,000 sq. ft. warehouse and a 10,000 sq. ft. office space in an existing tilt-up building
MH Golden
Project Superintendent (October 1986 to March 1996)
References:
Seapoint Resort, Carlsbad - $15,000,000.00
New construction of 78 timeshare units and all finishes, including 3-story wood framing over a concrete parking structure
Project scope also included a clubhouse, swimming pool, site and street improvements
Luce, Forward, Hamilton, & Scripps - $10,000,000.00
Full T.I. build out for high-end Law Firm
One American Plaza - $100,000,000.00
Demo of existing structures over 1X2 city blocks
Excavation, de-watering, & shoring for 4-story underground parking
New construction – 34 story high-rise
Complete – core & shell
UCSD School for Pacific Studies - $25,000,000.00
MTS Tower - $60,000,000.00
Demo of existing structure
New construction of 10-story building for County of San Diego & MTS Trolley
Neal Lindsley
Project Manager
Chris Kelly
Owner’s Rep
David Flickinger
Owner’s Rep
Rina Hawley
Owner’s Rep
Jon Millum
Project Manager @ Cutting Edge Drywall
Michele McLaine, ROICC/FEAD
Robert Finney,
Navy- retired
General Superintendent - retired
Lesa Johnson
Project Manager
Jeff Coon
Project Superintendent
Tom Donovan
Superintendent
Daniel Moreno
General Superintendent – Level 10
Additional references available upon request