Post Job Free
Sign in

Electrical Engineer with 19+ Years Experience and Leadership

Location:
Lahore, Punjab, Pakistan
Posted:
May 24, 2026

Contact this candidate

Resume:

Mirza Allah Ditta

Electrical Engineer/Supervisor

**********@*****.***

House No G 161 Mangla Dam-10200, 10200, PK +92-304-******* Professional Summar

Electrical experience in juggling the maintenance process, Construction projects. Primarily focused on quality of work. Excellent interpersonal and communication abilities and possess a wide range of technical skills and thrives in high pressure and challenging working environment. Having skills in construction, installation, maintenance, and support and testing activities to ensure compliance with specifications, codes and customer requirements. Work Experience

MEP Engineer Sep 2025 - Dec 2025

ECHO West International

BANGLADESH CHANCERY COMPLEX DIPLOMATIC ENCLAVE ISLAMABAD - PAKISTAN Supervising and Managing the Installation, Construction, Operation and Maintenance of Mechanical, Electrical and Plumbing Works.

Check and evaluate all the MEP drawings as per site.

Complete the MEP Work as per approved shop drawing within time frame.

Daily work monitoring and overall work planning.

Manage and supervise the daily activities of the technical team.

Managing the subcontractors' teams to ensure that the work is completed as per drawing.

Follow up the status of material of MEP related works on site.

Coordinate with Engineers, and Construction Manager to obtain clearance before starting the work to ensure smooth and efficient execution of work.

Electrical Maintenance in charge (MEP ) Jan 2022 - Nov 2024 Kohistan Builders & Developers

Ensure backup systems (generators, UPS) are functional

Handle common area lighting (corridors, parking, street lights)

Troubleshoot power failures and electrical faults

Ensure energy efficiency and load management

Create and follow preventive maintenance schedules

Conduct routine inspections of all MEP systems

Respond to maintenance complaints from residents

Coordinate repairs in common areas and sometimes inside units

Ensure minimal disruption during maintenance work

Maintain water supply systems (tanks, pipelines, valves) Project Engineer Electrical

Trade Tact’s International (Pvt) Ltd

Coca-Cola Beverages Pakistan Ltd

Attending Internal Meetings with Sr. Project Manager and department Heads, for Technical, Progress & and safety issues.

Review and Approval of Materials, Shop Drawings, Project Planning, and Weekly and Monthly Progress Reports. Monitoring the overall progress of the Project and sending progress reports to the H.O. for their review & and reference. Fabrication & and installation of Mesh Tray, Cable Laying Power/Control Instruments.Cable Termination Power,

Project Engineer Electrical Sep 2016 - Dec 2021

SYSTEM INSTALLERS (PVT) LTD

NESTLE MILK PAK LTD Detergent powder Plant

Ensure the Electrical work carried out is as per approved shop drawing and within the time frame and progress of the construction program. Ensure that the installation, inspection and testing of all the Electrical equipment, fittings and work implemented meets the specification and the consultant requirements Supervise and approve construction activities and inspection of materials and drawings. Monitoring of daily work progress, quality of work as per specifications” and maintain Progress Report.

Ladder /Perforate cable Tray Fabrication and Installation.

Installation lineament &coupling Main & MCC Panels.

Cable Laying Power and control and Instruments, Cab Termination.

Building Electrification.InstallationTransformer3000KVA

Installation HT panel.HT cable Laying and Termination.

Installation Fire alarm System Installation.

MS/PVC conduit pipe Installation.

Electrical Site Engineer Oct 2011 - Jun 2016

ECHO West International

ARKEL international Constriction Services EMERGENCY P O D HOUSING PROJECT U.S.A CONSULATE PESHAWAR PAKISTAN KING ABDULLAH TEACHING HOSPITAL MANSEHRA (K, P.K)

Attending Technical and Progress Meetings & having Correspond with Client and Contractors for site related issues. Attending Internal Meetings with Sr. Project Manager & Department Heads, for Technical, Progress & safety issues.

Review and Approval of Materials, Shop Drawings, Project Planning, Weekly and Monthly Progress Reports. Approval of Specialized Sub-Contractors & Suppliers & having meeting with them, for any technical clarification

Applying and developing Tailored Technical Solutions to the Client and attending Meeting with the Client and Quantity Surveyor, for any modifications or Value Engineering & instructing the Contractor to prepare new B.O.Q. Further, review & approval of Materials & Drawings, as per modifications & instructing the Contractors to proceed. Inspecting the Materials, those are delivered at Site, for Country of Origin, Quality & Specification requirements. Interfacing & coordinating with Electrical Engineers, along with multi-disciplinary team (Structural, Civil, Architectural, Mechanical, Plumbing) & taking care of all system, procedures & safety issues, during various stages.

Electrical Site Engineer Sep 2008 - Aug 2011

Al Toukhi Company for Industry, Trading & Contracting JUBA Power Plant Kingdom of Saudi Arabia GE Gas Turbine 60 MW/2

Wadi AL-Dowser power plant as electrical site Engineer. Responsible for the Construction &commissioning & start up for the:-Gas Turbine generator (2*6o M.W) from G.E USA. Installation & interface and Commissioning of, GALC, GNAC, GCB, limit Amp and EX2100 Model “7EA” for Gas Turbine Generator (GTG) as Manufactured of General Electric (GE), USA along with required Auxiliaries for safe and continuous operation of the power plant. Closed Cooling Water System.

Auxiliary Transformer from WESCOSA (13.8kv/ 4.16 KV & 13.8kv/480v).Switch gear 13.8 KV & 4.16 KV & 480 v from Schneider Company. High voltage transformer 13.8kv / 132kv from GANZ Hungary. Extension 132 KV GIS in S/S No 8780 (Juba) from KONCAR Croatia. Extension 33kv switch gear from PACS USA.Crude Oil system Crude oil Forwarding pump skid (west fallia)Distillate Forwarding pump skid (west fallia) Fuel Management

Installation of equipment's, Panels and cables.. Termination, testing and per commissioning of control, AC, DC, and local Panels.

Installation of conventional grids and 11 KV feeders.

Erecting of Transformer up to 250 MV installation and testing of lighting, Power, Fire Fighting and earthling system of Building and Plants. Installation and testing of control, power and HV cables. Electrical Site Engineer Jul 2006 - Sep 2008

System Installers (Pvt) Limited

Nestle Milk pack Ltd

Supervise, direct and control the activities of assigned personnel in the Electrical Construction. Perform Supervisory functions at the unit level as established by Management. Review Electrical Project package drawings / Designs before progress meetings, provide technical advice and recommend modifications as necessary. Supervise construction and commissioning activities at the site.

Participate in checking detailed drawings and other documentation. Supervise and approve construction activities and inspection of materials and drawings. Monitoring of daily work progress, quality of work as per specifications” and maintain Progress Report.

Yogurt plant project Electrical & instrument installation testing and per commissioning complete plant

Supervise Maintenance Activity UHT, Tetra Hall, PLE, Utility Area, NDC, Cereal Plant Argon plant & Warehouse.

Electrical Sep 2005 - Jun 2006

KCC Engineering Contracting Co (KCCEC) Kuwait

Responsible for project operational safety requirement. QA/QC documentation and review contractor installation procedures. Implement & enforce all company policies, procedures and practices.

Planning construction electrical and Instrumentation schedule. Monitor construction activities and progress. Witness and monitor electrical and Instrumentation equipment testing.

Responsible for test packages documentation from per-commissioning to final hand over to client. Manage the Electrical Contractors daily construction activities, schedule and progress.QA/QC documentation and specification and verify contractor procedures.

Electrical Site Engineer Jan 2003 - Jan 2005

ECHO West International

Royal Embassy of Kingdom of Saudi Arabia Diplomatic Enclave Islamabad Pakistan

Supervision of Switch-gear and Switchboards Installation including cable pulling Gland-ding and termination Coordinate with Engineering Regarding Drawings and as built drawing Supervise continuity check and Mag-gear check of cables spools and Inspection of cable Trays and supports.

Lighting System Complete Building. Fire Alarm System. Lightning Protection System. Public Address System. Telephone System. Close Circuit TV System. Inter Net System. Earthling System. Cable Tray Installation and Cable lying. Medium voltage Substation 13.8kv /480 v Installation and Commissioning Installation Substation Transformer WESCOSA 13.8KV/480VInstallation U P S System Electrical Site Engineer Aug 2000 - Jan 2003

Flowtronix (Pvt) Ltd

Ghazi Brotha Hydro Power Project 1450 MW Anoud Power Generation LTD

Supervising Installation NGR and Hi-pot Testing 21kv, Assembly of stater 290MW at site before Installation bus bar Hi-pot Test 33kv and Hi-pot Testing Stater 57kv. Installation Excitation System, Installation VTS Panel and Hi-pot Test22kv, Assembly of Rotor at site and Heightens test of rotor and Assembly of Pole and Voltage Drupe Test. Firefighting System Installation Turbine Site, Installation Panel And Cable Termite Installation Cable Trays, vibration system Installation Check & review as-built drawing & O&M manual Design & Review of various electrical drawings and documents for construction/ modification .- Develop and prepare single line, Relaying and metering diagrams, lightening layouts,

Supervised, installation MV Substation, LV Substation, Transformer.

Cable Tray fabrication & Installation.

Cable Laying HV, MV, LV, Control, Instrument& Cable termite.

Earthling System & lightening protection System Installation.

Firefighting system Installation.

Lighting System Installation

Electrical Supervisor Aug 1999 - Apr 2000

Descon Engineering (Pvt) Ltd

Mid Country Refinery PARCO

Supervising Installation, Testing and Commissioning of Switch Gears, MCC, Control Stations, Marshaling Cabinets, Transformers, Bus-Ducts, etc. Supervising the works for,

Testing, Commissioning and trial operation for the entire Plant. Monitoring installation, inspection and test of both: Impressed Current C.P. System, Earthling System. Fire and Alarm systems, Close Circuit Television and control systems, SCADA system. Installation of supports, cable trays, conduits etc. Cable laying through trays, ducts and conduits, Gangland termination works. Commissioning work on Generators, Transformers, Motors and the Work includes Construction oil Refinery,

Presentation of completed work for Third Party inspection. Updating and Maintaining records for progress monitoring. Implementing Company Policy for maintaining High level of HSE Standards.

Monitoring the Works done by Sub-Contractors and Maintaining Quality and Progress. Daily Planning and Execution of Electrical. Installation Testing and commissioning of Switch gears, Transformers, Motor Control Stations. Installation of CCTV.

Electrical Lead Man Jun 1997 - Feb 1998

Descon Engineering (Pvt) Ltd

A.E.S Lal Pir Thermal Power Plant (2x365MW

Supervising Installation, Testing and Commissioning of Switch Gears, MCC, Control Stations, Marshaling Cabinets, Transformers, Bus-Ducts, etc. Fire systems, Close Circuit Television and control systems, SCADA system and controls using PLC and genius/ profile-bus/ optical fiber systems. Installation of supports, cable trays, conduits etc. Cable laying through trays, ducts and conduits, Gladdening and termination works.

Commissioning work on Generators, Transformers, and Motors and their controllers/starters, switch gears, testing and calibration of breakers, setting of protection devices, like over current, under voltage relays, UPS system and battery charging equipment's, lighting . Core Skills

communication, presentation skills, learning skills, change catalyst, Microsoft Office, Project supervision, Team leadership, Planning, scheduling, communication, Work focused, target achiever, Problem solving, strategic thinking

Education

Govt. College of Technology Karachi Pakistan Mar 1996 Associate Engineering Electrical

Languages

English, Urdu, Punjabi



Contact this candidate