Montreal, QC, Canada
... (Concepteur et fabricant des compresseurs double de turbine de 45kw) La compagnie a été vendue et l'usine a été fermée - Géré et formé 100 personnes syndiquées / superviseurs de la chaîne d’approvisionnement, des opérations, de la production Lean, ...
- Mar 03
Telangana, India
... Responsibilities: Worked for the construction site of The KCP Limited supplied Self-setting mills, Centrifugal machines, and Co- generation power plant of 6MW turbine with alternator including 80 Ton water tube boiler, piping & equipment erection ...
- Mar 01
Iztapalapa, 09630, Mexico
... MAINTENANCE TECHNICIAN AT THSSEN KRUPP MAY 2014 AND 2016, WORK AS MAINTENANCE TECHNICIAN THE ELEVATORS OF ACCIONA AW-1500 WIND TURBINE MACHINES IN THE WIND FARMS OAXACA 2 OAXACA 4 AND THE EUROS EOLIC PARK. SUPERVISOR OF HALF TENSION AND MONTAJE ...
- Mar 01
Lambeth, Greater London, United Kingdom
... EXPERIENCE QHSE Manager Offshore Turbine Services – United Kingdom Nov 2023 – Present • Developed and implemented a fully integrated QHSE Management System covering ISO 9001, 14001, 45001, ISM and ISPS for offshore wind and port operations. ...
- Mar 01
Austin, TX
... Currently leading MRO-focused international partnership development, supporting Ukrainian industrial facilities in identifying EU and US manufacturing partners in turbine and power-generation sectors. Strong expertise in: Market entry strategy ...
- Feb 27
Abu Dhabi, United Arab Emirates
... Garland Idlers Fabrication & Installation – NMDC (1998) Pump & Motor Commissioning – Old HLPH – HPCL (2000) Conversion of Turbine to Motor Drives, CDU-I Plant – HPCL (2000) Turbine-to-Motor Drive Conversion – High Lift Pump House – HPCL (2001) 8/8 ...
- Feb 27
Kuala Lumpur, Malaysia
... Completed two projects of Gas Turbine Combined Cycle Power Plants. Completed four projects of LNG Plants. Management structure ranging from production, operation, project management and quality assurance and consultancy of multinational, multiplayer ...
- Feb 27
Toronto, ON, Canada
... Niagara Wind Project ($278M): Delivered 77-turbine, 230MW facility three months ahead of schedule by re-aligning resources and optimizing team performance. Developed project control standards that improved executive reporting and cross-departmental ...
- Feb 26
Sison, Pangasinan, Philippines
... Duration 3 Hours ) -The protection Method of Chemical Materials ( Duration 4 Hours ) -Using safety Methods ( Duration 3 Hours ) Operation of 3x KG2 Gas turbine / Prime Power Generation / Delta Electro Mechanic training Center Dhahran, Saudi, Arabia. ...
- Feb 26
Lakeland, FL
... Behbahani, “Gain Scheduled Control System for Alternate Generic Adaptive Turbine Engine (AGATE) Model,” Joint Army-Navy-NASA-Air Force (JANNAF) Meeting, June 2021. • J. Jaramillo, K. Wilcher, T. Yucelen, M. Pakmehr, “Set-Theoretic Model Reference ...
- Feb 25