Tempeh, East Java, Indonesia
... KEY QUALIFICATION I have significant experience in combined cycle turbine generators and power plant mechanical systems. My specialized expertise includes mechanical engineering, cold and hot commissioning and startup, field inspection, quality ...
- 2023 Nov 21
Surabaya, East Java, Indonesia
... Field performance award in mechanical support during turbine removal and installation Meji GGCP P/F. Recognition & Award (R&A) for outstanding performance displaying an exemplary dedication to duty. Education & Qualification High School of ...
- 2023 Jan 21
Surabaya, East Java, Indonesia
... A4 (Turbine Engine) 375-0209 1. On the job training at PT. Garuda Maintenance Facility, Denpasar, Bali Indonesia Line Maintenance Departement. ( Aiframe Powerplant ) 2. On the Job training at PT. Air Transport Service, Sentul, Bogor Indonesia, Base ...
- 2021 Feb 25
Gresik, East Java, Indonesia
... NAME WORK PERIODE POSITION PROJECT LOCATION DELAPAN PINTU UTAMA MARCH 20TH-29TH 2016 WELDER GTAW-SMAW CS OYONG & SEAGOOD 101 - SAMPANG OFFSHORE, SANTOS TAR 2016 EURO ASIATIC SEPTEMBER 19TH-NOVEMBER 23RD 2015 WELDER GTAW-SMAW CS GAS TURBINE PT. ...
- 2016 Dec 13
Pasuruan, East Java, Indonesia
... Job description : Installation,on base and alignment turbine auxilary. Installation and alignment condensor. Installation equipment Etc. Company : PT. TRUBA JAYA ENGINEERING Period : 16 Januari 2012 - 16 April 2012. Position : Mechanical Supervisor ...
- 2016 Jan 20
East Java, 63118, Indonesia
... my duties included trouble shooting of static and rotating equipment as (Pumps, Steam Boiler, Compressor, Steam Turbine, Gas Turbine, Agitator, Hot Oil and Mechanical equipment others). Breakdown equipment repairs, new installation development based ...
- 2015 Nov 14
Malang, East Java, Indonesia
... Shutdown & Major Over haul GE frame 6 Gas Turbine. *. Modification Control system for Avon Gas generator. *. Revamping 11 KV switch Gear from oil circuit breaker to VCB *. Erection & commissioning 11 KV QAFAC CO 2 compressor. *. Upgrade control MS ...
- 2012 Sep 15
Surabaya, East Java, 60244, Indonesia
... Assistance Unit Controller Boiler and Turbine : June 2010 – September 2010 PT YTL Coal fired Power Plant 2x610 MW East Java Indonesia • Work closely with Unit Controller, responsible for maintaining availability and safe operation of the unit. • ...
- 2012 Sep 10
java, East Java, Indonesia
... Syn gas multiple stage compressors driven by HP steam 115 bars with Extraction and condensing turbine. LP/HP governor controller. Process air compressor, Refrigeration Screw oil injection compressor, instrument air proportional controller compressor ...
- 2012 Aug 23