CURICULUM VITAE
Name : Salis Nadir
Permanent Address : Jl. Delima No 40 Kaumrejo Ngantang Malang
Present Address : Bukit cemara tuju GG 11 Malang Indonesia
Date& place of Birth : 06.04.1973, Malang
Status : Married, with 2 children
Education : Diploma-3 in electrical engineering from
Polytechnic Brawijaya University Malang
Jawa timur Indonesia.
Telephone : +628**********(mobile)
+623********(Indonesia).
+971*********(UEA)
Email : **********@*****.***
Experience :
1. april 2012 to present
Joint with ADCO(Abu Dhabi on shore company) subsidiary of ADNOC as electrical foreman with responsible :
-. Carried day to day electrical maintenance activity for oil plant RDS( remote degassing system) &CDS (central degassing system), well head & oil station pump.
2. February 2011 to april 2012
Joint with PT Kaltim nitrate Indonesia (subsidiary of ORICA mining service Australia) as Electrical reliability senior tech, with responsible:
-. Review all constructions job as per safety procedure.
-. Developed standard operations procedure & work instructions for ABB 11KV
Switch gear, 690V & 400 V seiemens SIVACON MCC, ABB variable speed
Drive, Emergency diesel, UPS, transformer & emergency lighting.
-. Support commissioning time during project.
-. Prepare inventory for 2 years spare part.
3. From 2002 to January 2011.
Joint with QAFCO (a subsidiary Qatar petroleum) as Electrical technician, with main jobs carry on maintenance 7 x 11 Mw Avon Gas generator, 1 x 35 MW GE MS 6001 B, 66KV ZX 1 & LMK -1,11 KV, 3,3 KV Switch Gear ABB, 415 V MCC, Various Transformer from 0,75 MVA until 125 MVA, Battery Charger, Emergency Diesel 2 x 3 MVA Warsila 3,3 KV, And 11 KV motor.
Some of the major & shutdown project associated are:
*. Upgrading Transformer And 415 V Switch Board electro chlorination
& nitrogen plant
*. Shutdown & Major Over haul GE frame 6 Gas Turbine. *. Modification Control system for Avon Gas generator.
*. Revamping 11 KV switch Gear from oil circuit breaker to VCB
*. Erection & commissioning 11 KV QAFAC CO 2 compressor.
*. Upgrade control MS 6001 B from mark V to Mark 6 i
*. Revamp transformer distributions at QAFCO 1 & 2
*. Revamp 3,3 KV switch gears from contactor to VCB
4. From 1996 to 2002
Fresh graduate training at electrical section PT. Polysindo Eka Perkasa Karawang (Petrochemical Company)
From 1996 to 1997
junior supervisor at PT Polysindo Eka PerkasaKarawang, with responsible at PTA(pure teraptalit acid) Plant Project & commissioning Motors 400 V, 3,3 KV11 KV, Heat tracing system, MCC panels, Normal and Emergency illumination system.
From 1997 to 1998
Transferred to Power station & Utility electrical section with respond: commissioning wash waste Treatment project, Maintenance for Chiller plant,
Gas generator ABB GT 10 & Mitsubishi MF 111, Heat recovery steam Generator(HRSG), Demin plant, cooling water plant, Compressor, 20 KV Alstom switch gear, 11 KV & 3,3 KV fluar 200 MG, 420 V Siemens MCC, PMCC & PCC, Battery Charger, Transformer, Motor, Lighting system, Emergency diesel Generator.
Course & Training :
*. Management supervisory training.
*. Nelson heat tracing, installation and mainten