Post Job Free
Sign in

Electrical Plant

Location:
Malang, East Java, Indonesia
Salary:
negotiable
Posted:
September 15, 2012

Contact this candidate

Resume:

CURICULUM VITAE

Name : Salis Nadir

Permanent Address : Jl. Delima No 40 Kaumrejo Ngantang Malang

Present Address : Bukit cemara tuju GG 11 Malang Indonesia

Date& place of Birth : 06.04.1973, Malang

Status : Married, with 2 children

Education : Diploma-3 in electrical engineering from

Polytechnic Brawijaya University Malang

Jawa timur Indonesia.

Telephone : +628**********(mobile)

+623********(Indonesia).

+971*********(UEA)

Email : **********@*****.***

Experience :

1. april 2012 to present

Joint with ADCO(Abu Dhabi on shore company) subsidiary of ADNOC as electrical foreman with responsible :

-. Carried day to day electrical maintenance activity for oil plant RDS( remote degassing system) &CDS (central degassing system), well head & oil station pump.

2. February 2011 to april 2012

Joint with PT Kaltim nitrate Indonesia (subsidiary of ORICA mining service Australia) as Electrical reliability senior tech, with responsible:

-. Review all constructions job as per safety procedure.

-. Developed standard operations procedure & work instructions for ABB 11KV

Switch gear, 690V & 400 V seiemens SIVACON MCC, ABB variable speed

Drive, Emergency diesel, UPS, transformer & emergency lighting.

-. Support commissioning time during project.

-. Prepare inventory for 2 years spare part.

3. From 2002 to January 2011.

Joint with QAFCO (a subsidiary Qatar petroleum) as Electrical technician, with main jobs carry on maintenance 7 x 11 Mw Avon Gas generator, 1 x 35 MW GE MS 6001 B, 66KV ZX 1 & LMK -1,11 KV, 3,3 KV Switch Gear ABB, 415 V MCC, Various Transformer from 0,75 MVA until 125 MVA, Battery Charger, Emergency Diesel 2 x 3 MVA Warsila 3,3 KV, And 11 KV motor.

Some of the major & shutdown project associated are:

*. Upgrading Transformer And 415 V Switch Board electro chlorination

& nitrogen plant

*. Shutdown & Major Over haul GE frame 6 Gas Turbine. *. Modification Control system for Avon Gas generator.

*. Revamping 11 KV switch Gear from oil circuit breaker to VCB

*. Erection & commissioning 11 KV QAFAC CO 2 compressor.

*. Upgrade control MS 6001 B from mark V to Mark 6 i

*. Revamp transformer distributions at QAFCO 1 & 2

*. Revamp 3,3 KV switch gears from contactor to VCB

4. From 1996 to 2002

Fresh graduate training at electrical section PT. Polysindo Eka Perkasa Karawang (Petrochemical Company)

From 1996 to 1997

junior supervisor at PT Polysindo Eka PerkasaKarawang, with responsible at PTA(pure teraptalit acid) Plant Project & commissioning Motors 400 V, 3,3 KV11 KV, Heat tracing system, MCC panels, Normal and Emergency illumination system.

From 1997 to 1998

Transferred to Power station & Utility electrical section with respond: commissioning wash waste Treatment project, Maintenance for Chiller plant,

Gas generator ABB GT 10 & Mitsubishi MF 111, Heat recovery steam Generator(HRSG), Demin plant, cooling water plant, Compressor, 20 KV Alstom switch gear, 11 KV & 3,3 KV fluar 200 MG, 420 V Siemens MCC, PMCC & PCC, Battery Charger, Transformer, Motor, Lighting system, Emergency diesel Generator.

Course & Training :

*. Management supervisory training.

*. Nelson heat tracing, installation and mainten



Contact this candidate