Post Job Free
Sign in

Piping Construction Supervisor

Location:
East Java, 63118, Indonesia
Posted:
November 14, 2015

Contact this candidate

Resume:

*

CURRICULUM VITAE

Name : MULYONO PANGRIPTO.

Place/Date of Birth : Bandung / August 03rd, 1965

Religion : Moslem

Nationality : Indonesia

Address : Perumahan Graha Nirwana Asri Blok C3 Kel.Kanigoro Kec. Kartoharjo, Madiun -63118 – East Java, Indonesia Home Contact No. / Mobile Phone : +62-351-****** / +62 812.2628.3238. Email address : ***********@*****.**.****

QUALIFICATION : Mechanical -Piping Installation Supervisor

: Commissioning Piping Supervisor

EDUCATION ATTAINMENT:

BACHELOR OF MECHANICAL ENGINEERING, MERDEKA UNIVERSITY OF MADIUN EAST JAVA – INDONESIA- BACHELOR CERTIFICATE N0. 92.130.07.025 . 1992. SUMMARY OF EXPERIENCE

18 Years – Mechanical -Piping Installation Supervisor 5 Years – Maintenance / Mechanical Engineer

Included twenty three (23) years on-shore & off shore accumulated experience Pre- Commissioning & Commissioning in the Oil and Gas Industry and Petrochemical. Piping Field Engineering related to Inspection, System Check with Isometric and P&ID, Field Planning, Material Take Over, Field Material Requisition, Material Withdraw Requisition, Test Pack Preparation,Punch out & Hydro, Pneumatic, Visual, In service Inspection, System Completion, Turn Over, Permit Procedure (Hot, Cold,Confine space & Work at Height and Heavy Lift) and well trained to work H2S environment, Walk down to follow the progress/delay

& system completion as well as Pre Commissioning, Commissioning, Shutdown & Working in running Plant

Plan & manage for timely execution of PC&C (Pre-Commissioning and Commissioning) activities as per project &contract requirement. Review project scope and specification to develop strategy for PC&C and project close out. Review Pre-Commissioning procedure Test Packages and Job Cards for Pre-Commissioning, MC-ITR (Inspection Test Records for Mechanical Completion) PC-ITR (Inspection Test Records for Pre-Commissioning) MC Dossier,PC Dossier, Spare Parts for PC&C- First Fill Procedure Etc. Coordinate with Construction & QA/QC teams for timely and efficient execution of all pre-commissioning tests and ensure all records are signed by client and properly maintained as per project requirement for hand over and close out. Coordinate with Construction & QA/QC teams for timely and efficient execution of punch list items. Coordinate with Client to identify and agree on systems & sub- systems handing over requirement and ensure Construction, PC&C team follow the same sequence. Plan and Coordinate with Vendors, Suppliers etc, for timely availability and supervision as required. Coordinate with other groups such as Engineering, Procurement, Fabrication, Installation, QA/QC, HSE, and ensure all Parties (Company, Main Contractors representatives, Construction Team, QA/QC Team,) are aware of commissioning requirements and commissioning schedule and performance concerns. Ensure the development and 2

implementation of system handover plan. Ensure smooth handover from construction to Pre- Commissioning. Ensure efficient handover to Company..Develop and issue monthly and weekly commissioning progress reports, and continuous review progress against plan and identify areas of concern. Assist Company during Commissioning and performance test. WORK EXPERIENCES

1. AIR ENERGI INDONESIA FOR EXXON MOBIL CEPU LTD –REFINERY PLANT

/EPC 1 BANYU URIP PROJECT CEPU –BOJONEGORO.-Head Office :Air Energi Indonesia PT,Alamanda Tower 18th Floor Unit B-C,Jl. TB Simatupang Kav.23-24 Jakarta 12430, Tlp. +622*********

Period of Service : From May 21th, 2015 To Present Position : PIPING SUPERVISOR

My ID Card Air Energi : AIE10054

Name of My Leader Directly : Mr. James Dawson (As Area Superintendent ) Mobile Phone : +628********** ) email address:

*****.******.******@********.***

Responsibilities

My responsibility before start and ensure compliance to permit condition.and attending the Job meetings when required by the Construction Area Superintendant. And ensure that the TOB/works are excecuted with the adequate standards of health and safety, this remit including the empowerment to stop all unsafe activities that create a situation of imminent danger Verify that subcontractors work in a safe manner and according project safety plan and procedures and make regular safety walks to verify the area housekeeping and safety. To ensure that applicable project specifications and standard codes are correctly executed during piping fabrication and erection. understand and interpret all design, fabrication and erection drawings, and material specification including other engineering data. In addition, to arrange for clarification of any project drawing or specification which requires additional information for construction purpose To supervise erection of pipe spools and pipe supports according to the latest issued construction drawings Supervise piping works to be performed by construction sub-contractor and to insure the compliance with the established construction activities To ensure the quantity of the work executed by the construction sub-contractors and monitor the compliance with established schedule. And evaluate the construction sub- contractors work capability according to the programs that have to be implemented. & ensure the proper execution of inspection and testing in accordance with the field quality control plan and monitor the adequacy result. To solve the cases of no-conformity with the support of construction superintendent where necessary. & Monitor the progress with schedules and updating to construction superintendant., attend final walkthrough of completed piping systems and verify clearing of all punch list prior to reaching RFC. Assist Commissioning Activities.& attend coordination meetings with site manager and project management team To attend final walkthrough of completed piping systems and verify clearing of all punch list prior to reaching RFC. To assist Commissioning Activities. & attend coordination meetings with site manager and project management team. Providing rotating equipment information throughout the phases of construction and pre-commissioning to the project team. Provide the technical expertise to assist in achieving accuracy in project piping and instrumentation drawings (P&ID’s) Participating in inspections and field testing of equipments as required. 3

2. TOTAL E & P NIGERIA LIMITED– FOR OFON PHASE 2 PROJECT PLATFORM EPCCI 1/ - OFFSHORE –Head Office Plot 25 Trans Amadi Industria Layout –Port Harcourt Nigeria . D/Tel. +234(0)803-***-****, +234(0)807-***-**** Period of Service : From January 10th, 2014 To January 15th,2015 Position : Commissioning Piping Supervisor

My ID Card Total E&P Negeria : L 0376668

Name of My Leader Directly : Mr. Yannick DESBOTDES & Maduabuchi UMESI. (As Commissioning Piping Lead) Contact Person Mobile

Phone: +234(0)803-***-****

Responsibilities

My responsibility for Hook-Up &Commissioning Piping Supervisor is to ensure that the quality of the prefabrication work 9other than weld acceptance ) performed on site by the contractor and subcontractor is in compliance with P &ID drawing requirements & to check the engineering documents prepared by the contractor in his discipline and to give timely comments on and/or approval of in accordance with Installation/Fabrication Procedure and requirements and to check the incorporation of such comments by the contractor. To check the progress of the work performed by the contractor and to assess any request by the contractor to deviate from quality control procedures of requirements and make appropriate recommendation to the Head of hook-up. Follow up for Preliminary Check

(PRC ) Walk-down on each System/ Sub System with Star-up & Operation team as per requirement before to perform Operation Test Procedure ( OTP ) as Preparation /Performed OTP HP/LP Flare, HP/LP Fuel Gas System, Closed Drain Drum &Pumps etc according to with line Sub System on Marking line P & ID Drawing and follow up PRC Walk down on each System /Sub System with HHI, Halliburton, Start-up & Operation team as per requirement before to perform carry out /perform N2/Helium Leak Test of 24 Test Package and Follow up Preparation and to perform N2/Helium Leak Test for the remaining Test Pack and Reinstatement after test completed., Follow up /Witness on N2/Helium Leak test on each System/Sub System with Halliburton, HHI, Start up & Operation team as per requirement/ according to with see marking line on P&ID Drawing Punch List Clearance/ Closing of Piping Commissioning punch list item and Report on the work performed by the contractor and on any problems encountered to Piping Leader and to liaise with the Construction Team as required reporting and report on any problem encountered in his discipline to Commissioning Piping Lead. and prepare the daily report and submit to Commissioning Piping Leader.

3, PT. PETROTECHINDO UTAMA ENGINEERING & PROJECT MANAGEMENT CONSULTANT. Head Office :Gandaria 8 (Office Tower)21st Floor Jl.Sultan Iskandar Muda- Kebayoran lama-Jakarta Selatan 12240. Telepon: +622********* (Hunting) Period of Service : From January 03rd 2013 To November 30th 2013 Position : Mechanical – Piping Installation Engineer Project Title : Labuhan Maringgai- Tanjung Karang Pipe Line Project (CP-7) . For The State Gas Company (Perusahaan Gas Negara /PGN) Responsibilities

I as a representative of the State gas company (Perusahaan Gas Negara /PGN Persero- tbk ) to supervision the pipeline to be installed to distribute the natural gas from the New Labuan Maringgai off take station to meet up with and tie in to the Sutami off take station –Lampung to provide a tie in point of 12” gas distribution pipeline at Sutami off take station tie in point 4

of 6” gas distribution pipe line at Sekampung Udik station and 16”,12”,10”,6”,4” distribution pipeline to meet up with customer 16” gas pipe line 62,3 km length, 12”,17,7 km and 6” gas pipe line branch 10 km length. My responsibility is to supervision and ensure that the quality of the piping work (other than weld acceptance) performed on site by the Contractor and subcontractors in compliance with Client Standard Specification Procedure. And I have to check the progress of the work performed by the contractor. Also participate in technical reviews and in all Job Risk Analysis and ensure that all risks are well anticipated and reduced as much as possible by the contractor. and than Control of the contractor during construction activities as Mechanical Installation,Piping Fabrication &Installation until clearance to release Pre-Commissioning & Commissioning for all piping test package,hydrotesting test,phneumatic test . Punclist completion and Mechanical Completion. To ensure that the quality of the piping erection work (other than weld acceptance) performed on Site by contractor and sub contractor complies with Standard Specification Procedure requirements, and safety policies.to ensure that, for his discipline and area, the quality assurance record books are properly documented and maintained by the contractor. Report on the work performed by the contractor and on any problems encountered to Project Manager and to liaise with the QC/Inspector as required reporting and report on any problem encountered in his discipline to Project Manager and prepare the daily,weekly,montly report and submit to Project Manager

4.TOTAL E & P INDONESIE– FOR SOUTH MAHAKAM FIELD DEVELOPMENT PLATFORM PROJECT PHASE 1 & 2,/ MODULE FABRICATION Onshore / Offshore Main Stupa, West Stupa & East Mandu Platform Oil & Gas Industry, Yard Fabrication in PT. Nisconi Batam & Hook up /Offshore in East Kalimantan .Head Office Telp.(62-21-724**** / 4604235

Period of Service : From November 10th, 2011 To December 30th, 2012 Position : Commissioning Piping Process Supervisor My ID Card Total E&P INA : L 0376668

Name of My Leader Directly : Mr. Lionel Portier & Ichwan Ulul F. (As Commissioning Piping Process Superintendent ) Contact Person Mobil Phone : +62.214610201 / +62.4604235 /+628********* Responsibilities

Piping Fabrication Shop/yard Assembly,Site Installation, hookup & Pipelines Construction.Pre-comm. Piping / Pipeline Cleaning, Pressure tests, Reinstatement, Air Tightnes Leak test, Prepared Pre- Comm. Progress Database, Test sheets to Opercom Documents (RFC).Commissioning Tools Preparation,Inventory & Maintenance. Mechanical Rotating Pre/Final alignment and pressure vessels/ Separators/colums internal inspection & Manhole Final Closure. Piping/pipeline Hook up & TIE INS Installation (HOT & COULD CUT/HOT TAP/BOLTED) at live plant Use KAMOS Gaskets with Partially N2 leak test to ensure No leackage at Valves/ Flanges prior to puts the systems In Operation. Commissioning Equipment Operatioanl Test (OT) to verify the Vibration,Discharge flow rate, Temperature Such as Liquid transfer Pumps/Offloading Pumps, Chemical Injection, Closed Drain Pumps, association with Deluge/HPU/Air/ Nitrogen Package Liaise with Electrical/Intrument specialists & Control system (DCS). Prepare the OpercomTest sheets into RFSU dossier. N2 Leak Test Preparation/P&ID's mark up, Procedure and Estimate LN2 Volume in US GAL for entire Project Process plant. N2 Leak test execution for Piping/Process Facility at Operating Pressure 4 hour satabilization aftter RFC's were approved. High Pressure PSDV'S/ESDV'S Valves Passing test by N2 & PSV's Set Pressure 5

witness /Calibrate. ASSIST START UP & INITIAL OPERATION : After RFSU Dossiers approved to Despading, O2 flush, Line up/Ensure the Valves Closed/Openned Tags are as per start up procedure prior to GAS IN. Prepare the Final P&ID's Conformity check/updated as Commissioned into RFSU Dossiers.Punch lists verification, Clearance. Specialist : PIPING Pre-fabrication,Site Installation, Erection, Hook Up Onshore/Offshore PRE- COMMISSIONING : Piping/Pipeline Internal Cleaning Use target plates, Pressure test, Pipework Reinstatement. Machinery Pumps Pre/Final alignment,Coupled run test. COMMISSIONING PIPING/ PROCESS: Nitrogen(N2) Leak test/ Equip. Operational test

(OT).START UP/GAS IN : Spading/Despading, Oxygen(O2)Flush entire Process Plant, KO Drum/Flares and Gas Pressurized into Plant. Punch Lists Clearance. HAND OVER. 5. PT. RAGA PERKASA ENGINEERING & CONSTRUCTORS ( RPE )FOR SOUTH SEMBAKUNG GAS PLANT PROJECT . Head Office Gandaria 8 (Office Tower)5th Floor Jl.Sultan Iskandar Muda- Kebayoran lama-Jakarta Selatan 12240. Tlpn:

(021-******** (Hunting).

Period of Service : From March 25th 2010 To October 30th 2011 Position : Mechanical – Piping Superintendent

Name of My Leader Directly : Mr. Teddy Ramarga ( As. Project Manager ) Responsibilities:

My responsibilities is execute inspection of joint Fit-Up dimensional for conformity against with isometric drawing and check P & ID and pipe line drawing prior to welding,execute final inspection of completed welds and arrange for NDE examination .Review and evaluate test packages prior to Hydrostatic, Gross Leak for Pre-commissioning. Do the line checking of pipes, clearing Punch listing on lines as pre test packages prior to Hydro stating. Ensure all the line equipment And during Mechanical completion for Mechanical Equipment activities starting from preparing execution and acceptance as static equipment.Preposition cheek,positioning equipment as the orientation of equipment as per approval drawing, Inspection and fill up the mechanical completion sequence check list.Inspection for install rotating equipment as positioning of equipment as equipment and motor that have been placed shall be leveled to elevation position as approved drawing check machinery alignment prior to checking alignment the coupling hub run.

Coordinates the mechanical completion activities to meet project schedule and make notification to company representative for witnessing mechanical completion activities.

Check for Mechanical Completion preparation like procedure data base preparation and mechanical completion dossier and execution at yard as closing punch list.

Check dossier completion and submitting to company to get mechanical completion certificate.Arrange meeting with pre commissioning team,commissioning team and company

6. TOTAL E & P INDONESIE– FOR TUNU FIELD DEVELOPMENT PROJECT PHASE 11 -SCP, SMP PLATFORM /MODULE FABRICATION OIL AND GAS INDUSTRY Yard Fabrication :Tanjung Grenyang – Cilegon & Tunu –East Kalimantan

.Head Office Telp.(62-21-724****.

Period of Service : From October 21st 2008 To February 30th 2010 Position : Commissioning Piping Process Supervisor My ID Card Total E&P INA : L 0376668

Name of My Leader Directly : Mr. Pier Desquet ( As. Piping Process Superintendent ) 6

Responsibilities:

My responsibilities is execute inspection of joint Fit-Up dimensional for conformity against with isometric drawing and check P & ID and pipe line drawing prior to welding,execute final inspection of completed welds and arrange for NDE examination . Review and evaluate test packages prior to Hydrostatic, Gross Leak and Leak Test. Do the line checking of pipes, clearing Punch listing on lines as pre test packages prior to Hydro stating. Ensure all the line equipment,valve, strainer line pump are correctly installed to flow and orientation . Witness the Flushing, Hydrostesting, Gross Leak & Leak Testing of valve of the line system. And witness for Operation Test Procedure on all equipment as HP Flare KO Drum & Pumps, Hydraulic Power Unit, Fuel Gas System, etc. Coordinate with Construction teams for timely and efficient execution of all pre-commissioning tests and ensure all records are signed and properly maintained as per project requirement for hand over and close out. Coordinate with Construction teams for timely and efficient execution of punch list items. Coordinate with Process/Operations teams to identify and agree on systems

& sub-systems handing over requirement and ensure Construction, PC&C team follow the same sequence. Ensure the development and implementation of system handover plan. Ensure smooth handover from construction to Commissioning. Ensure efficient handover to Process/ Operations . Develop and issue monthly and weekly commissioning progress reports, and continuous review progress against plan and identify areas of concern. 7. CHIYODA- TECHNIP JOINT VENTURE (CTJV – QGX) FOR QATAR GAS II – LNG PLANT DEVELOPMENT PROJECT – QATAR MIDDLE EAST

Branch Office: Al-Mana Tower 7 th floor, Air Port Road PO.BOX.23967 Doha Qatar Tell. :

+974-***-**** Fax +974-***-****.

Period of Service : From August 25th, 2006 to September 30th,2008 Position : Piping – Mechanical Supervisor

Name of My leader directly : Mr. Agatino DiLao (Assist Site Manager Utility area) Responsibility:

Ras Laffan Industrial City, Qatar Gas LNG Onshore Expansion Project -QGX –II Check availability of Pipes ( Carbon Steel, Stainless Steel Alloy Steel ), fittings for fabrication for spools in workshop and Supporting materials for Pipe Supports fabrication as per detail drawings as per ASME B 31.1 & ASME B 31.3 .Prepares Technical Quarry, Site Instructions, Mark-up Test packs and modification as built drawings of EPC for Qatar Gas

(Exxon-Mobil project). Executed the Critical Nitrogen package of QGX-II LNG package unit of Air Liquide System successfully has been done with Descon,Qatar. Maximum nos of Critical Test pack punched,cleared in Utility and Process Units. Total T-type Stainer of Train-4 and Train -5 has been inspected and repaired under my supervision. Attend weekly meeting with the Engineer and Contractor to discuss the progress of the job to monitor closely what are the outstanding and deliverables for the project. Conduct site survey as required if there are item not cleared in the Isometric drawings. Site supervision for piping installation works of underground and aboveground network. Prepares final Material Take- Off of the detailed engineering design of the project. Coordinates and monitor progress of Fabrication, erection as per P&ID, Isometric drawings and update field modifications for As- built drawings. Test Pack punch making. Clearing A1 & A2 punches. Supervision for Pneumatic & Hydro testing

7

8. PT. KPM FOR EMP KANGEAN LTD – FOR PAGERUNGAN UTARA PLATFORM JACKET AND DECK PROJECT/ MODULE FABRICATION Yard Fabrication : – PT. Puspetindo Jl. Jend. Ahmad Yani PO. BOX. 176 Gresik 61101 Jawa Timur Telp. 031*******. Ext. 157

Period of Service : From December 15 th.2005 To August 15th,2006 Position : Site Mechanical -Piping Coordination

Name of My Leader Directly : Mr. Bayu Prakoso ( Proiect Manager ) Responsibilities:

Responsible for structure and piping and see to it that the job done by main contractor confirm with see EMP Kangean Ltd Project specification procedure and other Relative International Code, and Standard drawing for all aspect of pipe structure fabrication, erection & installation. My duties is before fabrication of Pipe spool to Sub Contractor, I am preparing Isometric spool drawing and determine/ calculation for cut length pipe on isometric spool drawing Preparation of Piping Fabrication Procedure, Hydro test Procedure, and Test Packet Procedure.

I also check / Inspection in shop fabrication for Fit –Up, Material Specification, Welding Joint. Preparation Weekly report & Monthly reports giving general Information on Work progress with Percentage Completion of work Piping Fabrication Process. Reporting to Project Manager

9. PT. JAVA BANTEN PERSADA – CHEMICAL PLANT PRODUCTION OF ACRYLIC FIBER. Plant Site :Desa Argawana Puloampel –Bojonegara –Cilegon Banten.Telp.0254- 500380 – 81.

Period of Service : From January 05th 2004 To October 31st, 2005 Position : Piping -Mechanical Superintendent

Name of My Leader Directly :Mr Harpal Singh (As Maintenance Department Manager) Responsibilities:

In overall, control of major refurbishment work to on new equipment in Dioctyle Phalate

(DOP) Production. my duties included trouble shooting of static and rotating equipment as

(Pumps, Steam Boiler, Compressor, Steam Turbine, Gas Turbine, Agitator, Hot Oil and Mechanical equipment others). Breakdown equipment repairs, new installation development based on operation Maintenance aspect work agreement / service order completion with sub contractors, operation. Permit arrangement and equipment certification (Production and Construction) and operation cost budget and controls. And selection materials, procurement of suitably rated equipment to comply with area re-classification supervision of the installation and commissioning work forces compilation of as built drawings and certification packages. I was also required to familiarize maintenance personnel to new equipment and i. mplement a routine maintenance program. For activities/duties daily routine reporting to the Mechanical Manager Maintenance Department.

10. TOTAL FINAELF E & P INDONESIE (PMA) – OIL AND GAS INDUSTRY FOR PECIKO 4 PLATFORM & JACKET PROJECT/ MODULE FABRICATION . Yard Fabrication :Tanjung Grenyang – Bojonegara – Cilegon – Banten Telp. 0254 – 356480. Head Office: Telp. 021 – 2522690 PO.BOX. 1010/JKT. 10010 Period of Service : From February 17st 2002 to November 30th 2003 Position : Mechanical -Piping Supervisor

8

Name of My Leader Directly : Mr. Philip Reid (As Construction Manager) Reason of Leaving : Contract Completed

Responsibilities:

Responsible for structure and piping saw to it that the job done by main contractor confirm with see TOTAL FINA ELF project specification procedure and other Relative International Code, and Standard drawing for all aspect of pipe structure fabrication, erection & installation. Maintain and accurate check on pipe structure fabrication, erection & installation progress against the program drawn up & recommend necessary step to be taken by the Sub- Contractor to speed up where necessary. Check the drawing worked to on site are the latest issue, that correct materials are used for fabrication & test according to TOTAL FINAELF E&P INDONESIE drawing and specification. Modification carried out on site should be making on drawing for the preparation of as build drawing at the end the work. TOTAL FINA ELF E&P INDONESIE will be incorporating such modification in a revised drawing. In some modification will require approval by TOTAL FINA ELF E &P INDONESIE where P&ID may be affected or plot changes of main contractor. Liaised with the welding engineer regarding radiography, stress relieving, dypenetrant test, ensuring that repair work is carried out satisfactorily. With regard to record should be maintained of completion work so that pipeline can be released for insulating and painting. Prepared a weekly report & monthly reports giving general information on work progress with percentage completion of work. 11. PT. AMOCO MITSUI PTA INDONESIA (PMA) – PETROCHEMICAL INDUSTRY. Site Office :JL. Raya Merak Km. 116 Ds. Rawa Arum Tanjung Gerem–Merak–Banten Telp. 0254 – 570777

Period of Service : From March 7th 1999 to December 28th 2001 Position : Piping – Mechanical Supervisor

Name of My Leader Directly : Mr. I. Terashima (As. General Project Manager) Reason of Leaving : Contract Completed

Responsibilities:

Responsible to complete the mechanical scope including structure/ piping, installation equipment of static and rotating equipment, as pressure vessel, condensate, separator,pump, Agitator, Heat Exchanger, Steam Boiler etc. Accordance with the design project specification and procedure other relative international code and standard. Prepare equipment lay out drawings, Mechanical equipment data sheet, risers detail drawing, and prepare requisition and performed technical evaluation for mechanical equipment. 12. PT. CHANDRA ASRI PETROCHEMICAL CENTRE (CAPC) – PRODUCTION OF ETHYLENE, POLYETHYLENE, PROPYLENE PLANT Site Office :Jl. Raya Anyer Km 123 Ciwandan Anyer – Cilegon . Telp. 0254 – 601501Head Office: Wisma Barito Pacific Tower A Telp. 021–5307950 Fax: 021. 530 8930 Period of Service : From July 01st 1996 to January 30th 1999 Position : Maintenance Coordination Supervisor

Name of My Leader Directly : Mr.Tomohiro Oka (As Maintenance Depart. Manager) Reason of Leaving : Contract Completed

9

Responsibilities:

In the performance of duty daily routine was coordinated sub contractor of PT. Chandra Asri outside vendor (Local Vendor Company/ foreign vendor). Prepare bid document, specification for inquires, estimation of operating plant fixed and variable costs. Making Engineering Design i.e. preparation of planning scheduling, performed Technical Evaluation for Mechanical Equipment, preparation of equipment, modification, Structure fabrication, Piping installation, Civil work and common work.

My duties daily routine is inspection the ETHYLENE, UNIPOL, UTILITY areas. Involved supervision of maintenance, trouble shooting overhaul and repair equipment as Pump, Steam Boiler,Steam Turbine / Gas Compressor etc, If have the job should be done contractors before requisition for quotation from contractor, I always preparing detailed of design drawing and Materials Specification for bid evaluation and selection of cost estimation. All fabrication or additional works require under control by me and user for the above activities. With safety regulation is also required to be known by me to carry out every worker in safe and keep every worker on time and minimize lost working hours are progress/job schedule. Prepare of daily, weekly, monthly activity, reporting to Manager Coordination Section – Maintenance Department.

Successfully accomplishment from me, for modification of the Banging Machine, with applied additional equipment of fabrication sending unit and Belt Conveyor this bring on stream production capabilities of 550.000 metric tons of Ethylene, 243.000 metric tons of Propylene, and 300.000 metric tons of Polyethylene, designed as a 24 hours a day operation. 13. CONOCO INDONESIA INC. (PMA) – OIL AND GAS INDUSTRY FOR CONOCO BELIDA II PROJECT /MODULE FABRICATION Yard Fabrication : :Tanjung Leneng–Ciwandan–Cilegon Telp. 0254 – 601028 Head office. Mulia Tower 3rd– 6 th Floor. JL. Jend. Gatot Subroto Jakarta. PO. BOX 1367 Jakarta 10013 Period of service : From April 3rd 1994 to May 30th 1996 Position : Piping – Mechanical Supervisor

Name of My Leader Directly : Mr. J. W. Karudeng (As Structure /Piping Engineer) Reason of Leaving : Contract Completed

Responsibilities:

My responsibility for CONOCO BELIDA PROJECT STAGE II include liaison with fabrication main contractor project team, progress reporting and in house fabrication construction platform of piping inspection. Materials inspection of welding inspection saw to it that job done. Specification procedure and other relative standards international code, is a progress report in check works on-pre commissioning, for production platform. Where piping and equipment are installed, including approval and check hydro testing work on piping line, punch list and equipment, accordance with P & ID and Isometric drawing. For execute field inspection as per project quality plan, which involved in the field of monitored welding working for compliance against-relevant procedures as follow: Execute in process inspection of joint fit-up dimensional for conformity against drawing prior to welding. Execute final inspection of completed welds and arrange for NDE examination, review and evaluate test packages prior to hydrostatic and leak test. Ensure all the line equipment, valves, strainers, line pump are correctly installed relative to flow direction and orientation. Witness the hydro testing, flushing, and leak testing of valves, of the line system. Provide/suggest repair procedure for any welding that did not meet the quality level required by the code, review fabrication and general erection drawing of pipe spool and comment if 10

necessary. Do the line checking of pipes, punch listing on lines as pre test packages prior to hydro testing.

14. MOBIL OIL INDONESIA INC (PMA) – OIL AND GAS INDUSTRY FOR LNG NATURAL GAS/ REFINERY PLANT – LOUKSUMAWE ACEH

Yard Fabrication : Tanjung



Contact this candidate